Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WAUKESHA TOWER ASSOCIATES Applicant Doing Business As: WAUKESHA TOWER ASSOCIATES |
136 E. WALKER STREET MILWAUKEE, WI 53204 United States |
+1 (414) 672-1940 | MARTY@R4DCOMWIRELESS.COM | Other |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Tony zumMallen QCommunications, LLC |
705B SE Melody LN #314 Lee's Summit, MO 64063 United States |
+1 (816) 729-1177 | tony@qcomm.tv |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Replace the transmitter and antenna per the channel reassignment with reasonable and customary engineering and business practices. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | MX1000 | |
Year | 2006 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1000 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.2 kW | |
Justification for New Transmitter | Per the channel reassignment - Replace the transmitter with reasonable and customary engineering and business practices. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Transmitter Shipping fee |
Shipping costs of new transmitter |
Transmitter Taxes |
Sales tax for new transmitter |
Transmitter Decommissioning |
Decommissioning costs of old transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 12 | |
Design power capacity in use | 100.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 860.00 MHz | |
ERP: | 39.7 kW | |
Manufacturer | ||
Model | 9555212 | |
Year | 2006 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 6 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 860.00 MHz | |
Design power capacity in use | 100.0 % | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | 955516 | |
Year | 2019 | |
Justification for New Antenna | Replace the antenna per the channel reassignment using reasonable and customary engineering and business practices. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 1 5/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Power Dividers | Does the panel antenna require power dividers? | Yes |
Number of Power Dividers | 1 | |
Cable Harness | Does the panel antenna require cable harness? | Yes |
Number of Cable Harnesses | 1 |
Name | Description |
---|---|
Antenna Shipping and Handling |
Shipping and Handling costs for new antenna |
Antenna Sales Tax |
Sales Tax for new antenna |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1054380 | |
Coordinates (NAD83) | Latitude (NAD83) | 42° 58' 05.0" N- |
Longitude (NAD83) | 088° 11' 20.1" W- | |
Overall Structure Height | 488.84 feet | |
Support Structure Height | 488.84 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1043.62 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Global Tower, LLC. through American Towers, LLC | |
Date Constructed | 09/28/2006 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 200 | |
Explanation | Required to assist in the turnkey management of the channel relocation project in order so that the existing internal personnel can maintain and operate the station's daily operational requirements and plans. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $110,900.00 | $125,900.00 | N/A | $0.00 | N/A |
Total for all systems | $328,855.00 | $365,225.00 | N/A | $0.00 | N/A |
Primary Transmitter UAXTE | $110,900.00 | $125,900.00 | $0.00 | ||
Transmitter Decommissioning | $6,000.00 | $6,000.00 | Estimated costs of harvesting and removal of old transmitter from site. Revised upon Site Survey. | N/A | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $25,000.00 | Estimated costs for site survey and transmitter installation. Revised upon Site Survey. | N/A | N/A |
Transmitter Taxes | $8,400.00 | $8,400.00 | Estimated taxes to be collected for transmitter. Actual costs to be determined. | N/A | N/A |
Transmitter Shipping fee | $2,500.00 | $2,500.00 | Estimated shipping costs for transmitter. Actual cost to be determined. | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $84,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $26,355.00 | $37,235.00 | N/A | $0.00 | N/A |
Total for all systems | $328,855.00 | $365,225.00 | N/A | $0.00 | N/A |
Primary Antenna 955516 | $26,355.00 | $37,235.00 | $0.00 | ||
Antenna Sales Tax | $2,200.00 | $2,200.00 | Estimated sales tax collected by vendors as part of the repack. Actual costs to be determined. | N/A | N/A |
Antenna Shipping and Handling | $1,000.00 | $1,000.00 | Estimated costs for antenna shipping and handling. Actual costs to be determined. | N/A | N/A |
Cable harness (each, for panel antenna system, if not included in antenna cost) | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
Power Dividers (each, for panel antenna system, if not included in antenna cost) | $1,300.00 | $1,300.00 | N/A | N/A | N/A |
Side Mount antenna brackets | $4,625.00 | $4,625.00 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | N/A | N/A |
UHF Broadband panel antenna (per panel), horizontally-polarized | $10,500.00 | $21,380.00 | Per attached quote #0115584 from Micro Communications, Inc. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $77,190.00 | $77,190.00 | N/A | $0.00 | N/A |
Total for all systems | $328,855.00 | $365,225.00 | N/A | $0.00 | N/A |
Primary Tower TOWER | $77,190.00 | $77,190.00 | $0.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $56,190.00 | N/A | N/A | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $21,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $100,700.00 | $111,190.00 | N/A | $0.00 | N/A |
Total for all systems | $328,855.00 | $365,225.00 | N/A | $0.00 | N/A |
Outside Professional Services | $100,700.00 | $111,190.00 | $0.00 | ||
Comprehensive coverage verification via field study, if needed | $52,600.00 | $52,600.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Project management of the transition | $21,100.00 | $30,800.00 | Required to assist in the turnkey management of the channel relocation project in order that the existing internal personal can maintain and operate the stations daily operational requirements and plans. | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $8,200.00 | $8,200.00 | Per attached QCommunications quote. | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $2,500.00 | Per attached QCommunications quote. | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,710.00 | $13,710.00 | N/A | $0.00 | N/A |
Total for all systems | $328,855.00 | $365,225.00 | N/A | $0.00 | N/A |
Other Expenses | $13,710.00 | $13,710.00 | $0.00 | ||
Equipment Delivery and Handling Charges | $1,000.00 | $1,000.00 | Transport, forklift rental and handling fees from staging area to transmitter site. | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $1,000.00 | $1,000.00 | 4-6 yard disposal bin on site to capture all the waste from on site system integration and tower vendors. | N/A | N/A |
Equipment Storage | $5,000.00 | $5,000.00 | Expecting multiple staggered equipment deliveries from different vendors and need to store and stage new equipment prior to installation date. | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $328,855.00 | $365,225.00 | $0.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | martin franke partner 10/23/2019 |