Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
BOARD OF TRUSTEES, UNIVERSITY OF KENTUCKY Doing Business As: BOARD OF TRUSTEES, UNIVERSITY OF KENTUCKY |
Tom Godell 2640 SPURR ROAD LEXINGTON, KY 40511 United States |
+1 (859) 257-3226 | TOM.GODELL@UKY.EDU | Government Entity |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Kathy V. Hight Accountant Principal WUKY University of Kentucky |
Kathy Hight 2640 Spurr Road Lexington, KY 40511 United States |
+1 (859) 257-7830 | kathy.hight@uky.edu |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Please see attached detailed transition plan. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Z20 Z16HD | |
Year | 2006 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Model Type | Hybrid | |
Solid State Power Capacity | 30 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TX1000 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Model Type | Analog | |
Solid State Power capacity | 1 kW | |
Justification for New Transmitter | Transmitter for new auxiliary site. | |
Does the transmitter require the purchase of a new HD Importer? | No | |
Does the transmitter require the purchase of a new HD Exporter? | No |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | Does the transmitter installation require an Additional Exciter? | No |
Does the transmitter installation require any additional transmitter installation costs? | Yes | |
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | Install electrical service with backup power, at new auxiliary site as required. WUKY is an LP-1 EAS station and required backup power systems. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 480.0 square feet | |
Other Transmitter-Related Expenses | Does the replacement transmitter require a Remote Control? | No |
Does the replacement transmitter require an RDS Encoder? | No | |
Does the replacement transmitter require Audio Processing? | No |
Name | Description |
---|---|
Labor |
Labor to install equipment rack and power connections for new transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Cross Dipole | |
ERP: | 100.0 kW | |
Manufacturer | ||
Model | MP-8AC-DA-HW | |
Year | 2006 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Cross Dipole | |
ERP: | 12.0 kW | |
Manufacturer | ||
Model | LPX-2C | |
Year | 2018 | |
Justification for New Antenna | New Antenna for Aux Site |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | |
FM Band Pass Filters | Do you require an FM band pass filter? | |
Notch Filter | Do you require a Notch filter? | |
De-Icers | Do you require De-Icers? | |
Radomes | Do you require Radomes? |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Ownership | ||
Is the existing transmission line shared with another station or stations? | ||
Is Transmission Line in operating condition? | ||
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | ||
Diameter | ||
Number of parallel runs | ||
Length |
Name | Description |
---|---|
Antennas Unlimited, Inc. |
Antennas Unlimited, Inc. donated the transmission line for new auxiliary transmitter. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Construct New |
Tower Use | Primary (Main) | |
Ownership | ||
Is this tower consider Complex? | ||
Is this tower currently shared with any other stations? | ||
Is tower documented for structural analysis? | ||
Is tower compliant with Rev G? | ||
Existing Tower Structure Registration | Do you have a tower registration number? | |
Coordinates (NAD83) | Latitude (NAD83) | - - |
Longitude (NAD83) | - - | |
Overall Structure Height | ||
Support Structure Height | ||
Ground Elevation Above Mean Sea Level (AMSL) | ||
Structure Type | - | |
Tower Owner | ||
Date Constructed |
Section | Question | Response |
---|---|---|
Construct New Tower | Use | Primary (Main) |
Is this a request for upgraded equipment? | Yes | |
Height | 191.00 feet | |
Justification for New Tower | New monopole tower for new Auxiliary site. |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Equipment and Rigging |
See detailed descriptions and invoices in attached document named Tower Equipment and Rigging. Total cost $208,930.45. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 0 | |
Explanation | Project management was complete as a portion of an overall bid. The total project costs was $498,042. The calculation used was 20% of $498,042 equals 19,608.40. | |
Outside RF consulting Engineering Services | Prepare engineering section of Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 1 | |
Justification | Detuning tower to to proximity of am station. WLXG |
Name | Description |
---|---|
Outside Other Professional Services |
Details of professional services, engineering, detuning, permits, applications for auxiliary facility. Legal and engineering costs for Form 399 preparation. Detailed services and invoices are on attachment titled Other Professional Services Expenses. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | Yes |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | Yes | |
New Point to Point Microwave System | No | |
1 pair IP-only Codecs for fiber, internet or IP microwave systems | No |
Name | Description |
---|---|
Construction permit for Auxiliary transmitter site. |
Auxiliary site build out: support buildings, site preparation, electrical, EAS required emergency generator, Andrew antennas, wiring, connectors, security fencing. Total cost $367,050.56. See attachment Other Expenses with invoices. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $760,561.16 | $642,811.20 | N/A | $642,811.20 | N/A |
Total for all systems | $1,358,064.26 | $899,989.30 | N/A | $893,446.80 | N/A |
Primary Transmitter TX1000 | $760,561.16 | $642,811.20 | $642,811.20 | ||
Transmitter Installation | $70,500.00 | $6,530.00 | N/A | $6,530.00 | N/A |
Labor | $41,705.15 | $41,705.15 | See attachment Other Professional Services for cost details and invoices for engineering, legal and other services. | $41,705.15 | Please see attachment Other Professional Services for cost details and invoices. |
Transmitter Building Site Survey/Installation | $10,000.00 | $18,595.04 | See attached documents: 1-Other Costs - Land and 2-WUKY Building and Land Appraisal report for costs calculations. | $18,595.04 | Site survey and appraisal. See attachment Other Costs-Land for computation and appraisal documents. |
Other -- Building Addition Size: 480.0 | $208,930.45 | $208,930.45 | Other - Tower Equipment and Rigging Costs. See attachment Tower Equipment and Rigging for details and invoices, $08,930.45. Costs include 191 ft monopole, site preparation, grounding, antenna and line installation. | $208,930.45 | See attached Tower Equipment and Rigging document for detailed expenses and invoices. |
Other Electrical Service: Install electrical service with backup power, at new auxiliary site as required. WUKY is an LP-1 EAS station and required backup power systems. | $367,050.56 | $367,050.56 | See attachment Other Expenses for cost detail and invoices for Auxiliary transmitter and STL build out. Expenses include site preparation, buildings installation, antennas, generator installation (required as WUKY is EAS P1 for this region), fencing. | $367,050.56 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $0.00 | Switchgear Costs were included in Other Expenses. Please see Attachment Other Expenses. | $0.00 | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $0.00 | Item included in attachment Other Expenses | $0.00 | This item is included in the costs of attachment Other Expenses. |
Air Cooled Solid State FM Transmitter 600 - 1000 Watts Analog | $9,775.00 | $0.00 | The air cooled solid state FM Transmitter 1000 W is included in Attachment Transmitter Costs. | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Installation | |
Labor | |
Transmitter Building Site Survey/Installation | |
Other -- Building Addition Size: 480.0 | |
Other Electrical Service: Install electrical service with backup power, at new auxiliary site as required. WUKY is an LP-1 EAS station and required backup power systems. | |
Switchgear - industrial 800 amp | |
Service entrance 3 phase/800 amp/208 volt | |
Air Cooled Solid State FM Transmitter 600 - 1000 Watts Analog | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $7,900.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $1,358,064.26 | $899,989.30 | N/A | $893,446.80 | N/A |
Primary Antenna LPX-2C | $7,900.00 | $0.00 | $0.00 | ||
High Power 11 kW - 25 kW Circularly-polarized | $7,900.00 | $0.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
High Power 11 kW - 25 kW Circularly-polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $0.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $1,358,064.26 | $899,989.30 | N/A | $893,446.80 | N/A |
Primary Transmission Line | $0.00 | $0.00 | $0.00 | ||
Antennas Unlimited, Inc. | $0.00 | $0.00 | Antennas Unlimited donated the transmission line. See Attachment Transmission Line Donation. | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Antennas Unlimited, Inc. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $533,630.45 | $208,930.45 | N/A | $208,930.45 | N/A |
Total for all systems | $1,358,064.26 | $899,989.30 | N/A | $893,446.80 | N/A |
Primary Tower | $533,630.45 | $208,930.45 | $208,930.45 | ||
Tower Equipment and Rigging | $208,930.45 | $208,930.45 | See Attachment Tower Equipment and Rigging for detail of costs and invoices. | $208,930.45 | N/A |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | $0.00 | $0.00 | N/A | $0.00 | N/A |
New tower shorter than 500' | $324,700.00 | $0.00 | Costs are in Attachment Tower Equipment and Rigging. | $0.00 | N/A |
Primary Tower | $0.00 | $0.00 | $0.00 |
Actual Information Description | File Name |
---|---|
Tower Equipment and Rigging | |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | Information not provided. |
New tower shorter than 500' | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $48,772.65 | $46,307.65 | N/A | $41,705.15 | N/A |
Total for all systems | $1,358,064.26 | $899,989.30 | N/A | $893,446.80 | N/A |
Outside Professional Services | $48,772.65 | $46,307.65 | $41,705.15 | ||
Additional Field Engineering Service, 1 Days | $0.00 | $0.00 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $0.00 | Cost included in attachment Other Professional Services. | $0.00 | N/A |
Outside Other Professional Services | $41,705.15 | $41,705.15 | See Attachment Other Professional Services for detail and invoices. | $41,705.15 | See Attachment Other Professional Services for detail and invoices. |
Prepare/ Review 399 reimbursement form | $1,710.00 | $0.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $0.00 | $0.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Project management of the transition | $0.00 | $0.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Additional Field Engineering Service, 1 Days | Information not provided. |
Prepare Form 601 | Information not provided. |
Outside Other Professional Services | |
Prepare/ Review 399 reimbursement form | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Form 399 assistance or other Program Management costs | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Project management of the transition | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $7,200.00 | $1,940.00 | N/A | $0.00 | N/A |
Total for all systems | $1,358,064.26 | $899,989.30 | N/A | $893,446.80 | N/A |
Other Expenses | $7,200.00 | $1,940.00 | $0.00 | ||
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $200.00 | $200.00 | N/A | N/A | N/A |
Construction permit for Auxiliary transmitter site. | $0.00 | $0.00 | N/A | N/A | N/A |
Point to Point Microwave (STL/ICR): Frequency Coordination for Bi-Direction System | $1,100.00 | $1,100.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | N/A | N/A | N/A |
AM Pattern Disturbance -- Impact study | $5,260.00 | $0.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,358,064.26 | $899,989.30 | $893,446.80 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kathy V. Hight Accountant Principal 10/14/2019 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kathy V. Hight Accountant Principal 10/14/2019 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kathy V. Hight Accountant Principal 10/14/2019 |