Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
STATION VENTURE OPERATIONS, LP |
Margaret L. Tobey 300 NEW JERSEY AVENUE, NW WASHINGTON, DC 20001 United States |
+1 (202) 524-6401 | margaret.tobey@nbcuni.com | Limited Partnership |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Margaret L. Tobey Assistant Secretary NBCUniversal, LLC |
Margaret L. Tobey 300 New Jersey Avenue, NW Washington, DC 20001 United States |
+1 (202) 524-6401 | margaret.tobey@nbcuni.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Install new antenna in place of existing analog antenna and new transmitter for new channel. The old transmitter and antenna will remain in place for interim use until the cut-over. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TRN-5X-36D-C | |
Year | 2016 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.6 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | TMU9-3 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.8 kW | |
Justification for New Transmitter | Change of site required new transmitter to be installed. Old transmitter will be returned to manufacturer for credit. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | Install H-Frame rack with disconnect, meter, and generator recept; install primary service connect; install underground electrical & telco conduits; connect electrical/telco to shelter | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 10 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 58.0 square feet |
Name | Description |
---|---|
Installation Costs |
Transmitter Installation costs |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 11.2 kW | |
Manufacturer | ||
Model | ALP8l1-HSMR-46 | |
Year | 2016 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 12.124 kW | |
Manufacturer | ||
Model | TLP-4F/VP-R | |
Year | 2019 | |
Justification for New Antenna | Original antenna was single channel and would not work on the new channel. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 1 5/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Leased | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Segment Length | 20 inches | |
Number of parallel runs | 1 | |
Length | 802 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 250 feet per run | |
Justification for New Transmission Line | New site with a new tower so we could not use the existing line. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1049262 | |
Coordinates (NAD83) | Latitude (NAD83) | 41° 59' 49.4" N- |
Longitude (NAD83) | 071° 09' 14.3" W- | |
Overall Structure Height | 198.16 feet | |
Support Structure Height | 194.88 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 96.13 feet | |
Structure Type | LTOWER - Lattice Tower | |
Tower Owner | CCATT LLC | |
Date Constructed | 05/28/1998 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 300 | |
Explanation | Used an outside vendor to manage the displacement of this low power station. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | No |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 5 | |
Justification | Site Survey |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $162,900.00 | $172,310.71 | N/A | $0.00 | N/A |
Total for all systems | $376,002.50 | $378,974.41 | N/A | $0.00 | N/A |
Primary Transmitter TMU9-3 | $162,900.00 | $172,310.71 | $0.00 | ||
Other Electrical Service: Install H-Frame rack with disconnect, meter, and generator recept; install primary service connect; install underground electrical & telco conduits; connect electrical/telco to shelter | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Installation Costs | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $26,538.00 | placeholder | N/A | N/A |
Other -- Building Addition Size: 58.0 | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $76,872.71 | N/A | N/A | N/A |
10 Ton system | $38,900.00 | $38,900.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $23,135.00 | $19,582.50 | N/A | $0.00 | N/A |
Total for all systems | $376,002.50 | $378,974.41 | N/A | $0.00 | N/A |
Primary Antenna TLP-4F/VP-R | $23,135.00 | $19,582.50 | $0.00 | ||
Side Mount antenna brackets | $4,625.00 | $1,072.50 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | N/A | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 12.124kW input, Elliptical | $12,780.00 | $12,780.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $6,000.00 | $3,113.70 | N/A | $0.00 | N/A |
Total for all systems | $376,002.50 | $378,974.41 | N/A | $0.00 | N/A |
Primary Transmission Line | $6,000.00 | $3,113.70 | $0.00 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $6,000.00 | $3,113.70 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $116,190.00 | $116,190.00 | N/A | $0.00 | N/A |
Total for all systems | $376,002.50 | $378,974.41 | N/A | $0.00 | N/A |
Primary Tower LTOWER | $116,190.00 | $116,190.00 | $0.00 | ||
Minor tower reinforcement/modifications | $39,000.00 | $39,000.00 | N/A | N/A | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $21,000.00 | N/A | N/A | N/A |
Tower Rigging Short Tower (less than 500') | $56,190.00 | $56,190.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $66,027.50 | $66,027.50 | N/A | $0.00 | N/A |
Total for all systems | $376,002.50 | $378,974.41 | N/A | $0.00 | N/A |
Outside Professional Services | $66,027.50 | $66,027.50 | $0.00 | ||
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
RF Exposure Measurements | $12,100.00 | $12,100.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $6,230.00 | $6,230.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Project management of the transition | $31,650.00 | $31,650.00 | N/A | N/A | N/A |
Additional Field Engineering Service, 5 Days | $7,500.00 | $7,500.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,750.00 | $1,750.00 | N/A | $0.00 | N/A |
Total for all systems | $376,002.50 | $378,974.41 | N/A | $0.00 | N/A |
Other Expenses | $1,750.00 | $1,750.00 | $0.00 | ||
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $0.00 | $0.00 | tbd | N/A | N/A |
Equipment Delivery and Handling Charges | $0.00 | $0.00 | tbd | N/A | N/A |
Equipment Storage | $0.00 | $0.00 | tbd | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $376,002.50 | $378,974.41 | $0.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Margaret L. Tobey Assistant Secretary 11/11/2019 |