Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
53114
Service:
DTV
Call Sign:
WDIV-TV
Channel:
32 (UHF)
File Number:
0000027867
FRN:
0002161123
Date Submitted:
09/16/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

GRAHAM MEDIA GROUP, MICHIGAN, INC.

Doing Business As: GRAHAM MEDIA GROUP, MICHIGAN, INC.

Marcus Williams

550 WEST LAFAYETTE BOULEVARD

DETROIT, MI 48226

United States

+1 (313) 222-0581 MARCUS@WDIV.COM Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

William T Godfrey , Jr. .

Consulting Engineers

Kessler and Gehman Associates, Inc.

William T. Godfrey, Jr.

Kessler and Gehman Associates, Inc.

507 NW 60 Street, Suite D

Gainesville, FL 32607

United States

+1 (352) 332-3157 jeff@kesslerandgehman.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Install new main dual transmitter and main antenna while using licensed AUX facility during tower work and throughout the assigned phase. Map and analyze tower; design and modify tower. Install new AUX antenna and AUX transmitter post-transition.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Auxiliary
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Diamond
Year 2005
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 7.5 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model UAXTE-12R44
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 7.2 kW
Justification for New Transmitter The manufacturer of the existing transmitter advises that the transmitter cannot be re-tuned to the assigned channel. See attachment.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Disconnect existing transmitter for removal and connect new transmitter after installation.
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model SigmaCD
Year 2008
Type Inductive Output Tube
IOT Power Type Three
Power Capacity 80 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTED-100
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 63.4 kW
Justification for New Transmitter The existing 80 kW IOT transmitter configuration is equivalent to a magic tee dual transmission system and not the single ULXTE. Therefore, WDIV is budgeting for the ULXTED model. The next step up is a ULXTED-100 which WDIV is budgeting for (see attached)

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 100.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 0.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Installation

Installation

Additional Interior RF System

Interior RF System Existing Transmitter to Interim Transmission line

Standby Exciter and Switch

Standby Exciter with Automatic Change Over Switch

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Auxiliary (Backup)
Description of Use Auxiliary
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 973.0 kW
Manufacturer
Model TFU-18DSC
Year 2005

Auxiliary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Auxiliary (Backup)
Description of Use Auxiliary
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 973.0 kW
Manufacturer
Model TFU-18DSC-R CT3
Year 2018
Justification for New Antenna The existing and licensed AUX antenna is a single channel slotted coaxial which cannot accommodate the assigned channel.

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 872.0 kW
Manufacturer
Model TFU-27ETT VP R4C130
Year 2008

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 720.0 kW
Manufacturer
Model TFU-23ETT/VP-R 4C130
Year 2018
Justification for New Antenna The existing primary antenna is a single channel slotted coaxial which cannot accommodate the assigned channel.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 1232 feet per run

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Sweep Tests

Sweep tests to confirm line is acceptable on assigned channel.

Auxiliary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Auxiliary (Backup)
Description of Use Auxiliary
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 3/4 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1110 feet per run

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Sweep Tests

Sweep tests to verify operation on assigned channel

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1000830
Coordinates (NAD83) Latitude (NAD83) 42° 28' 58.0" N-
Longitude (NAD83) 083° 12' 19.0" W-
Overall Structure Height 1062.98 feet
Support Structure Height 980.96 feet
Ground Elevation Above Mean Sea Level (AMSL) 685.69 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Graham Media Group, Michigan, Inc.
Date Constructed 01/01/1988

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
9618 WXYT-FM FM

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 600
Explanation It will be necessary to schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399. Station does not have available personnel or personnel trained in project management for such complex projects.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service Yes
Number of Days 30
Justification It will be necessary to survey the site, plan the equipment, develop specifications for purchasing, and oversee multiple vendor RF projects. Station does not have available personnel or personnel trained in such services.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Other Legal Services

Other Legal Services related to the DTV Repack

Other Engineering Services

Fewer Project Management "PM" tasks are required & Other Engineering Services "OES" are required, therefore the PM total has been reduced to 600 hrs ($90,000 at $150/hr), & a new OES category has been created & funded with the money removed from PM.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,502,027.72 $2,497,327.72 N/A $1,515,873.00 N/A
Total for all systems $3,996,262.72 $4,168,927.72 N/A $1,923,688.54 N/A
Primary Transmitter ULXTED-100 $2,254,511.70 $2,249,811.70 $1,354,195.66
Standby Exciter and Switch $25,000.00 $25,000.00 N/A N/A N/A
Additional Interior RF System $75,000.00 $75,000.00 N/A N/A N/A
Installation $1,758.00 $1,758.00 Fire extinguisher system work $1,758.00 N/A
Other -- Building Addition Size: 0.0 $24,051.00 $24,051.00 See uploaded PDF titled "WDIV Transmitter Building Preparation for Repack Cost v2.pdf" No building size increase is needed; only building modifications. N/A N/A
3" Rigid Conduit and Wiring (Cost per foot) $5,200.00 $4,900.00 N/A N/A N/A
UHF - Liquid Cooled Solid State Transmitter 63.4 kW $2,034,102.70 $2,034,102.70 See attached GatesAir quote for ULXTED-100 $1,350,593.66 N/A
Service entrance 3 phase/800 amp/208 volt $14,400.00 $13,700.00 N/A $1,844.00 N/A
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A N/A N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $35,000.00 N/A N/A N/A
Auxiliary Transmitter UAXTE-12R44 $247,516.02 $247,516.02 $161,677.34
UHF - Air Cooled Solid State Transmitter 7.2 kW $242,516.02 $242,516.02 See attached quote $161,677.34 N/A
Other Electrical Service: Disconnect existing transmitter for removal and connect new transmitter after installation. $5,000.00 $5,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Standby Exciter and Switch Information not provided.
Additional Interior RF System Information not provided.
Installation

Component Description:
MFE 111915 v190805jgv2
Amount:
$1,488.00

Component Description:
MFE 112032 v190805jgv2
Amount:
$270.00
Other -- Building Addition Size: 0.0 Information not provided.
3" Rigid Conduit and Wiring (Cost per foot) Information not provided.
UHF - Liquid Cooled Solid State Transmitter 63.4 kW

Component Description:
Gates inv #JW30004541-1 1 third dp Prim TX UL2018116jgv1
Amount:
$672,559.43

Component Description:
Gates JW30004541-2 v190523jgv2
Amount:
$678,034.23
Service entrance 3 phase/800 amp/208 volt

Component Description:
Talbot 3894-01 v190705jgv1
Amount:
$1,844.00
Switchgear - industrial 800 amp Information not provided.
Transformer 3 phase/480v - 300 KVA Information not provided.
UHF - Air Cooled Solid State Transmitter 7.2 kW

Component Description:
Gates inv #JW30004542-1 1 third dp Aux TX UL2018119jgv1
Amount:
$80,838.67

Component Description:
Gates JW30004542-2 v190529jgv1
Amount:
$80,838.67
Other Electrical Service: Disconnect existing transmitter for removal and connect new transmitter after installation. Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $590,970.00 $582,550.00 N/A $203,793.84 N/A
Total for all systems $3,996,262.72 $4,168,927.72 N/A $1,923,688.54 N/A
Primary Antenna TFU-23ETT/VP-R 4C130 $308,530.00 $297,383.00 $118,248.84
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $275,000.00 N/A $108,176.49 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $2,880.00 N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $15,983.00 The $3,600.00 "Elbow 6-75 DIGIT 90 DEG 9 X 18" line item is being applied to this component, in addition to the $12,383.00 Elbow Complex line item. $7,192.35 N/A
Auxiliary Antenna TFU-18DSC-R CT3 $282,440.00 $285,167.00 $85,545.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,000.00 N/A $7,884.00 N/A
UHF - High Power, Side Mount, basic slot antenna, 973 kW input, directional,, horizontally polarized $235,000.00 $235,000.00 N/A $67,235.85 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $2,880.00 N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $16,767.00 The $2,420.00 Trans Test and $1,964.00 Fixed Flange line items are being applied to this component, in addition to the $12,383.00 Elbow Complex line item. $7,545.15 N/A

Components

Actual Information Description File Name
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
Die inv #MAN00799 Primary fixed flange pmt 1 UL20190313jgv1
Amount:
$1,255.50

Component Description:
Die inv #MAN00799 Primary trans test pmt 1 UL20190313jgv1
Amount:
$2,469.60

Component Description:
Die inv #MAN00799 Primary fixed flange pmt 1 UL20190313jgv1
Amount:
$1,195.20

Component Description:
Die inv #MAN00799 Primary ant pmt 1 UL20190313jgv1
Amount:
$102,095.55

Component Description:
Die inv #MAN00799 Primary reducer pmt 1 UL20190313jgv1
Amount:
$1,160.64
Sweep test of existing antenna

Component Description:
Die inv #MAN00799 Primary sweep pmt 1 UL20190313jgv1
Amount:
$2,880.00
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
Die inv #MAN00799 Primary elbow complex pmt 1 UL20190313jgv1
Amount:
$5,572.35

Component Description:
Die inv #MAN00799 Primary elbow pmt 1 UL20190313jgv1
Amount:
$1,620.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
Die inv #MAN00798 Aux ant side mt brackets pmt 1 UL20190314jgv1
Amount:
$7,884.00
UHF - High Power, Side Mount, basic slot antenna, 973 kW input, directional,, horizontally polarized

Component Description:
Die inv #MAN00798 Aux ant pmt 1 UL20190314jgv1
Amount:
$67,235.85
Sweep test of existing antenna

Component Description:
Die inv #MAN00798 Aux ant sweep pmt 1 UL20190314jgv1
Amount:
$2,880.00
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
Die inv #MAN00798 Aux ant elbow complex pmt 1 UL20190314jgv1
Amount:
$5,572.35

Component Description:
Die inv #MAN00798 Aux ant fixed flange pmt 1 UL20190314jgv1
Amount:
$883.80

Component Description:
Die inv #MAN00798 Aux ant trans test pmt 1 UL20190314jgv1
Amount:
$1,089.00

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $12,800.00 $12,800.00 N/A $3,660.35 N/A
Total for all systems $3,996,262.72 $4,168,927.72 N/A $1,923,688.54 N/A
Primary Transmission Line $6,400.00 $6,400.00 $3,660.35
Sweep Tests $6,400.00 $6,400.00 N/A $3,660.35 N/A
Auxiliary Transmission Line $6,400.00 $6,400.00 $0.00
Sweep Tests $6,400.00 $6,400.00 N/A N/A N/A

Components

Actual Information Description File Name
Sweep Tests

Component Description:
Inv WDIV161202 WDIV Line sweep UL20180423 v2
Amount:
$3,660.35
Sweep Tests Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $381,100.00 $562,000.00 N/A $140,210.00 N/A
Total for all systems $3,996,262.72 $4,168,927.72 N/A $1,923,688.54 N/A
Primary Tower TOWER $381,100.00 $562,000.00 $140,210.00
Tall Tower (greater than 500') $210,500.00 $400,000.00 Rigging must be done twice since WDIV has a licensed AUX facility. First rigging for post-auction AUX build-out while main operates as interim. Second rigging for post-auction Main build-out while AUX operates on post-auction after assigned phase. $134,210.00 N/A
Structural engineering tower load study for well documented tower $12,600.00 $12,000.00 N/A $6,000.00 N/A
Minor tower reinforcement/modifications $158,000.00 $150,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Tall Tower (greater than 500')

Component Description:
CTC inv #2093 Aux and Prim ant install pmt 1 UL20190308jgv1
Amount:
$134,210.00
Structural engineering tower load study for well documented tower

Component Description:
Inv: WDIV Structural Analysis UL20180329 2 of 2
Amount:
$1,000.00

Component Description:
Inv: WDIV Structural Analysis UL20180329 1 of 2
Amount:
$5,000.00
Minor tower reinforcement/modifications Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $370,815.00 $376,250.00 N/A $60,151.35 N/A
Total for all systems $3,996,262.72 $4,168,927.72 N/A $1,923,688.54 N/A
Outside Professional Services $370,815.00 $376,250.00 $60,151.35
Prepare and or review reimbursement form $2,630.00 $20,000.00 The Estimated Cost reflects the station's ongoing need for outside assistance with preparation and submission of its Actual Cost Repack invoices. $12,702.50 N/A
Project management of the transition $94,800.00 $90,000.00 The added complexity of dual mobilization for tower rigging as well as the complexity of this project. $60,000 has been moved from PM to the Other Engineering Services component (181116jg) $6,920.00 N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $3,000.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $7,000.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A N/A N/A
Other Engineering Services $60,000.00 $60,000.00 Fewer Project Management "PM" tasks are required & Other Engineering Services "OES" are required, therefore the PM total has been reduced to 600 hrs ($90,000 at $150/hr), & a new OES category has been created & funded with the money removed from PM. $22,445.00 N/A
Other Legal Services $10,000.00 $10,000.00 Need $1,283.85 N/A
Additional Field Engineering Service, 30 Days $60,000.00 $60,000.00 N/A $6,800.00 N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Prepare and or review reimbursement form

Component Description:
KGA 947-159 v190515pmv1
Amount:
$350.00

Component Description:
KGA 947-164 v190515pmv1
Amount:
$2,122.50

Component Description:
KGA 947-175 v190704jgv1
Amount:
$3,045.00

Component Description:
KGA 947-171 v190704jgv1
Amount:
$95.00

Component Description:
KGA 947-206 v190916jgv1
Amount:
$250.00

Component Description:
KGA 947-202 v190916jgv1
Amount:
$1,550.00

Component Description:
KGA 947-196 v190916jgv1
Amount:
$665.00

Component Description:
KGA 947-139 v190515pmv1
Amount:
$200.00

Component Description:
Inv: WDIV Outside Prof Svcs - Prepare and or Review Reimbursement Form UL20180403
Amount:
$2,500.00

Component Description:
KGA 947-131 v190515pmv1
Amount:
$150.00

Component Description:
KGA 947-132 v190515pmv1
Amount:
$1,225.00

Component Description:
KGA 947-130 v190515pmv1
Amount:
$50.00

Component Description:
KGA 947-133 v190515pmv1
Amount:
$500.00
Project management of the transition

Component Description:
Inv 947-21 WDIV Project Management through Aug 2017 UL20180504jgv3
Amount:
$3,500.00

Component Description:
KGA inv #947-82 Form 387 2018 Q2 UL2018116jgv1
Amount:
$300.00

Component Description:
KGA 947-200 v190916jgv1
Amount:
$300.00

Component Description:
KGA inv #947-59 Actual Cost invs 180329 UL2018116jgv1
Amount:
$300.00

Component Description:
KGA 947-118 v190515jgv1
Amount:
$300.00

Component Description:
KGA 947-162 v190515jgv1
Amount:
$300.00

Component Description:
Inv: WDIV 2017Q3 387 UL20180403
Amount:
$300.00

Component Description:
KGA inv #947-58 Actual Cost invs 180403 UL2018116jgv1
Amount:
$720.00

Component Description:
KGA inv #947-56 Form 387 2018 Q1 UL2018116jgv1
Amount:
$300.00

Component Description:
KGA inv #947-110 Form 387 2018 Q3 UL2018116jgv1
Amount:
$300.00

Component Description:
Inv: WDIV 2017Q4 387 UL20180403
Amount:
$300.00
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Inv: WDIV Outside Prof Svcs - Prepare eng section of Form FCC Const Permit App for Main Facility UL20180403
Amount:
$3,000.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Inv: WDIV Outside Prof Svcs - Perform eng study for new ch assignment and antenna development UL20180403
Amount:
$7,000.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
RF Exposure Measurements Information not provided.
Other Engineering Services

Component Description:
KGA 947-189 v190614pmv1c
Amount:
$590.00

Component Description:
KGA 947-192 v190614pmv1
Amount:
$1,652.50

Component Description:
KGA 947-190 v190614pmv1
Amount:
$1,267.50

Component Description:
KGA inv #947-62 Other Eng Srvcs Aug - Dec 2017 UL2018116jgv1
Amount:
$7,665.00

Component Description:
KGA 947-191 v190614pmv1
Amount:
$670.00

Component Description:
KGA 947-152 v190515pmv1
Amount:
$675.00

Component Description:
KGA 947-154 v190515pmv1
Amount:
$225.00

Component Description:
KGA inv #947-114 Other Eng Srvcs July - Oct 2018 UL20190206jgv2
Amount:
$6,950.00

Component Description:
KGA 947-153 v190515pmv1
Amount:
$2,075.00

Component Description:
KGA inv #947-62 Other Eng Srvcs Aug - Dec 2017 UL20190226jgv2
Amount:
$7,665.00

Component Description:
KGA 947-155 v190515pmv1
Amount:
$675.00
Other Legal Services

Component Description:
WDIV Covington inv #60812717 Review and file 2018 Q2 Progress Report UL20181019jgv1
Amount:
$34.20

Component Description:
Covington inv #60836455 Legal services thru 190131 UL20190308jgv1
Amount:
$328.05

Component Description:
WDIV Covington inv #60790165 Review and file Progress Report UL20181019jgv1
Amount:
$62.10

Component Description:
Covington inv #60776173 Various legal UL20190321jgv1
Amount:
$229.05

Component Description:
C&B 60847121 v190610pmv1
Amount:
$71.10

Component Description:
Covington inv #60773112 Various legal UL20190321jgv1
Amount:
$456.75

Component Description:
Covington inv #60827773 Legal services thru 181130 UL20190308jgv1
Amount:
$102.60
Additional Field Engineering Service, 30 Days

Component Description:
Inv: WDIV Addl Fld Eng Srv TX Mask Fltr Elec HVAC Solution UL20180403
Amount:
$1,250.00

Component Description:
Inv: WDIV Antenna Repurposing Study, Transmission Line Repurposing Study, Transmitter Repurposing Study & Parameter Review UL20180403
Amount:
$2,800.00

Component Description:
Inv: WDIV Outside Prof Svcs 1) CAS planning procuremnt & oversight, coord twr mapping & analyses 2) CAS planning procuremnt, oversight & develop an upgrade or replacement solution for twr 3) CAS planning procuremnt, oversight & coord twr mods UL20180403
Amount:
$2,750.00
Comprehensive coverage verification via field study, if needed Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $138,550.00 $138,000.00 N/A $0.00 N/A
Total for all systems $3,996,262.72 $4,168,927.72 N/A $1,923,688.54 N/A
Other Expenses $138,550.00 $138,000.00 $0.00
MVPD Notification of Channel Change $2,000.00 $2,000.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $25,000.00 $25,000.00 N/A N/A N/A
Equipment Storage $25,000.00 $25,000.00 N/A N/A N/A
Equipment Delivery and Handling Charges $25,000.00 $25,000.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A N/A N/A
Non-zoning permits $25,000.00 $25,000.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $25,000.00 $25,000.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $3,996,262.72 $4,168,927.72 $1,923,688.54

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey C Gehman

Engineering Associate


09/16/2019

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey C Gehman