Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
71218
Service:
DTV
Call Sign:
WBOC-TV
Channel:
32 (UHF)
File Number:
0000027899
FRN:
0002210490
Date Submitted:
09/25/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WBOC, INC.

Doing Business As: WBOC, INC.

Craig Jahelka

1729 NORTH SALISBURY BLVD.

SALISBURY, MD 21801

United States

+1 (443) 880-9090 CJAHELKA@WBOC.COM Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Robert Alan Guzman

Director of Engineering and Operations

WBOC, Inc.

Robert Guzman

1729 N Salisbury BLVD

Salisbury, MD 21801

United States

+1 (443) 493-3180 rguzman@wboc.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan We will install backup transmitter and auxiliary antenna which will continue to broadcast on Ch 21. WBOC's main transmitter will be modified to broadcast on digital Ch 32. The main Ch 21 digital antenna will be removed and a new Ch 32 antenna installed.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Retune Existing
Use Primary (Main)
Ownership Owned
Owner N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer Rohde & Schwarz
Model THU9
Year 2014
Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 25 kW

Primary Transmitter

Back to Top

Retuning Transmitter Costs

Section Question Response
New IOT Tubes Number of Tubes (including accessories) needed N/A
New Mask Filter
Power 30 kW
Other Power N/A
New Exciter Is a new exciter needed? No

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Heating and Cooling
Size 10 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 366.0
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Concrete

Concrete for room addition

Painting

Painting of room addition

Installation of new mask filter

New mask filter plus installation and transmitter line

Masonry

Masonry work for added room

Electrical

Additional electrical needed for installation of interim transmitter

Interim Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Interim
Description of Use N/A
Change Type Purchase
Manufacturer
Model THU9
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 9.2 kW
Justification for New Transmitter Transmitter is needed to keep ch21 on the air during conversion of main transmitter and replacement of main antenna to ch 32

Interim Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A
Inside RF System Is an additional interior RF system required to support this interim transmitter? Yes

Interim Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Add Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this antenna currently shared with any other stations? No
Is this antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Horizontal
Type Other
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type Channel 21 Panel
ERP: 740.0 kW
Manufacturer
Model TUP-P4SP-8S-1
Year 2000

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 50.0 kW
Manufacturer
Model TFU-24JTH/VP-R P250
Year 2017
Justification for New Antenna FCC requires channel change. We cannot re-tune our current Channel 21 antenna to Channel 32

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Other
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type Two Channel panel
ERP: 427.6 kW
Manufacturer
Model TUA-P2SP-8/20M
Year 2017
Justification for New Antenna Antenna needed to keep Ch21 on the air while main antenna is removed and main transmitter re-tuned.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? B
Feed Line Size 3 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1100 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1100 feet per run
Justification for New Transmission Line Current transmission line incompatible with new channel designation.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Flexible Air
Diameter 3 inches
Segment Length N/A
Other Segment Length
Number of parallel runs 1
Length 800 feet per run
Justification for New Transmission Line Interim line for use during transition period when main Ch21 antenna will be removed, and the new Ch32 antenna will be installed.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? Terrain Constrained
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1301089
Coordinates (NAD83) Latitude (NAD83) 38° 30' 18.0" N-
Longitude (NAD83) 075° 38' 36.0" W-
Overall Structure Height 1001.96 feet
Support Structure Height 890.08 feet
Ground Elevation Above Mean Sea Level (AMSL) 45.93 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner WBOC, Inc.
Date Constructed 08/31/2000


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Terrain constrained
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Guy wire re-tensioning

Guy wire check and adjusting

Tower crew installation of interim antenna

Running 16 1/8" transmission line 700ft and installation of side mounted interim antenna

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? No
Number of Hours N/A
Explanation N/A
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review Yes
Environmental Assessment Yes
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

DTV Notification

Medical Notification

Retuning Primary Transmitter

Retune Primary Transmitter to new channel

Attorney Fees - Misc

Fees associated with progress reports, timing of transition, and issues for repack

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Construction Equipment rental

Frontloaders, forklifts to remove antenna transmission lines etc. from delivery trucks

Project Management

Costs associated with beginning of repack project - project mngmt software and travel to seminar

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $905,833.00 $506,523.00 N/A $359,955.64 N/A
Total for all systems $2,757,434.95 $2,075,546.09 N/A $1,844,332.91 N/A
Interim Transmitter THU9 $642,000.00 $300,000.00 $272,423.21
UHF inside RF system including switching $147,500.00 $50,000.00 N/A $34,150.00 N/A
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW $494,500.00 $250,000.00 N/A $238,273.21 N/A
Primary Transmitter THU9 $263,833.00 $206,523.00 $87,532.43
Installation of new mask filter $23,000.00 $23,000.00 N/A $22,598.04 N/A
30 kW mask filter $32,600.00 $30,000.00 N/A $22,038.75 N/A
Electrical $17,000.00 $17,000.00 N/A $16,936.00 N/A
Masonry $1,533.00 $1,533.00 N/A $1,533.00 N/A
Painting $12,000.00 $12,000.00 N/A $1,150.00 N/A
Concrete $2,000.00 $2,000.00 N/A $1,300.00 N/A
UHF and VHF - minor banding issues $105,200.00 $100,000.00 N/A $2,327.76 N/A
10 Ton system $60,500.00 $10,990.00 N/A $10,990.00 N/A
Other -- Building Addition Size: 366.0 $10,000.00 $10,000.00 N/A $8,658.88 N/A

Components

Actual Information Description File Name
UHF inside RF system including switching

Component Description:
Quote SQ157396.2 replaced original quote 802-035358 due to pricing change. Initial deposit paid on invoice 9500069216 in the amount of $70,773.75 based on 25% of original quote. Final invoice is $280,365.85 less initial deposit of $70,773.75.
Amount:
$25,912.50

Component Description:
25% down payment for RF System
Amount:
$8,237.50
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW

Component Description:
Quote SQ157396.2 replaced original quote 802-035358 due to pricing change. Initial deposit paid on invoice 9500069216 in the amount of $70,773.75 based on 25% of original quote. Final invoice is $280,365.85 less initial deposit of $70,773.75.
Amount:
$175,679.60

Component Description:
Parts for Interim Transmitter
Amount:
$24.25

Component Description:
Parts for Interim Transmitter
Amount:
$33.11

Component Description:
25% down payment on interim transmitter
Amount:
$62,536.25
Installation of new mask filter

Component Description:
Installation of new mask filter/invoice updated
Amount:
$2,766.29

Component Description:
Equipment for Mask Filter install
Amount:
$19,831.75
30 kW mask filter

Component Description:
30 kW Mask Filter/updated invoice uploaded with correct amount
Amount:
$22,038.75

Component Description:
30 kW Mask Filter/Invoice was prepaid prior to shipment
Amount:
$22,038.75
Electrical

Component Description:
Electrical work for transmitter
Amount:
$11,275.00

Component Description:
Tower grounding extension
Amount:
$2,990.00

Component Description:
Electrical support to tower transmitter room
Amount:
$2,671.00
Masonry

Component Description:
Infill 4 vent openings
Amount:
$1,533.00
Painting

Component Description:
Painting of new control room interior wall/PO updated per FCC Review
Amount:
$1,150.00
Concrete

Component Description:
Concrete/Slab Infill
Amount:
$1,300.00
UHF and VHF - minor banding issues

Component Description:
Harmonic filter band V rigid line 98 mm/Moved from outside professional costs
Amount:
$2,327.76
10 Ton system

Component Description:
10 Ton HVAC System/Final invoice after completion of installation
Amount:
$5,495.00

Component Description:
10 Ton HVAC System/50% paid up front
Amount:
$5,495.00
Other -- Building Addition Size: 366.0

Component Description:
Final invoice for interior walls and ceiling of addition
Amount:
$1,584.60

Component Description:
Wall and Ceiling work for addition. 80% up front
Amount:
$6,338.40

Component Description:
Flooring for addition. Purchased online with American Express
Amount:
$735.88

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $714,450.00 $285,964.12 N/A $263,703.12 N/A
Total for all systems $2,757,434.95 $2,075,546.09 N/A $1,844,332.91 N/A
Interim Antenna TUA-P2SP-8/20M $418,220.00 $67,959.12 $65,798.12
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $7,125.00 N/A $6,412.50 N/A
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized $189,500.00 $6,325.00 N/A $6,325.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $5,760.00 N/A
Elbow complex, broadband, at antenna input, per 3 1/8. feedline (if needed) $9,340.00 $8,085.00 N/A $7,276.50 N/A
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized $189,500.00 $40,024.12 ***System Notice: Estimate adjusted and locked because line has been superseded.*** $40,024.12 N/A
Primary Antenna TFU-24JTH/VP-R P250 $296,230.00 $218,005.00 $197,905.00
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $211,605.00 Above price includes $20,100 for vertical polarization, which is 25% of $26,800 list price. $191,505.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A

Components

Actual Information Description File Name
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
2nd 45% of Mounting Brackets
Amount:
$3,206.25

Component Description:
45% of Mounting Brackets
Amount:
$3,206.25
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized

Component Description:
Overages for side mount (interim) antenna
Amount:
$6,325.00
Sweep test of existing antenna

Component Description:
2nd 45% of sweep test
Amount:
$2,880.00

Component Description:
45% of sweep test
Amount:
$2,880.00
Elbow complex, broadband, at antenna input, per 3 1/8. feedline (if needed)

Component Description:
45% of Elbow Complex
Amount:
$3,638.25

Component Description:
2nd 45% of Elbow Complex
Amount:
$3,638.25
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized

Component Description:
2nd 45% of interim antenna
Amount:
$20,012.06

Component Description:
45% of interim antenna
Amount:
$20,012.06
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
Primary Antenna/Updated invoice included with cover letter
Amount:
$191,505.00
Sweep test of existing antenna

Component Description:
Sweep Test of Primary Antenna
Amount:
$6,400.00

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $269,400.00 $310,119.74 N/A $310,119.74 N/A
Total for all systems $2,757,434.95 $2,075,546.09 N/A $1,844,332.91 N/A
Interim Transmission Line $47,200.00 $30,621.94 $30,621.94
Flexible Air Transmission Line - dielectric, 3" $47,200.00 $30,621.94 Price is based on invoice from Dielectric including associated hardware, hangers etc. Additional materials ordered to secure interim transmission line $30,621.94 Additional materials needed for securing transmission line for interim antenna
Primary Transmission Line $222,200.00 $279,497.80 $279,497.80
Rigid Transmission Line - copper, 6 1/8" $222,200.00 $279,497.80 Price includes 25% discount from Dielectric and does not include $6400 for field service sweep. Estimated pricing based on actual invoices for equipment and components needed to secure transmission lines. Several change orders occurred. $279,497.80 N/A

Components

Actual Information Description File Name
Flexible Air Transmission Line - dielectric, 3"

Component Description:
Additional materials ordered necessary to secure transmission line
Amount:
$2,481.00

Component Description:
45% of Flexible Transmission Line
Amount:
$14,070.47

Component Description:
2nd 45% of Flexible Transmission Line
Amount:
$14,070.47
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Equipment for transmission line
Amount:
$4,980.00

Component Description:
Equipment for transmission line
Amount:
$4,037.50

Component Description:
Pressure gauges for new transmission line
Amount:
$60.72

Component Description:
Pressure transducer for new transmission line
Amount:
$328.98

Component Description:
Equipment for installing transmission line
Amount:
$27,747.25

Component Description:
Nitrogen tanks for new transmission line evacuation process
Amount:
$307.71

Component Description:
Equipment for transmission line
Amount:
$3,355.50

Component Description:
Nitrogen tanks for new transmission line evacuation process/requesting partial payment on this invoice as the other items purchased were not for the repack.
Amount:
$74.98

Component Description:
Equipment for pressurizing the transmission lines/purchased through Lowes acct.
Amount:
$66.40

Component Description:
Rigid transmission line and components. Invoice prepaid prior to shipment/Updated invoice attached
Amount:
$238,313.25

Component Description:
Nitrogen tanks for new transmission line
Amount:
$158.80

Component Description:
Cable for transmission line pressure gauge
Amount:
$66.71

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $743,388.80 $839,067.08 N/A $837,567.08 N/A
Total for all systems $2,757,434.95 $2,075,546.09 N/A $1,844,332.91 N/A
Primary Tower GTOWER $743,388.80 $839,067.08 $837,567.08
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $550,253.28 Additional parts and installation required/Weather delays an additional $44,500 $550,253.28 N/A
Tower crew installation of interim antenna $125,000.00 $125,000.00 N/A $125,000.00 N/A
Guy wire re-tensioning $26,788.80 $26,788.80 N/A $26,788.80 N/A
Minor tower reinforcement/modifications $158,000.00 $128,025.00 N/A $128,025.00 N/A
Structural engineering tower load study for well documented tower $12,600.00 $9,000.00 N/A $7,500.00 N/A

Components

Actual Information Description File Name
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
Final invoice for removal and installation of equipment on tower plus additional parts and installation required
Amount:
$207,053.28

Component Description:
Partial invoice for equipment installation and removal on tower
Amount:
$200,000.00

Component Description:
Removal of equipment from tower
Amount:
$4,320.00

Component Description:
Partial invoice for removal and installation of equipment on tower
Amount:
$100,000.00

Component Description:
Removal of equipment from tower
Amount:
$14,160.00

Component Description:
Equipment removal from tower
Amount:
$24,720.00
Tower crew installation of interim antenna

Component Description:
Final invoice for Interim Antenna Install/estimate attached
Amount:
$9,000.00

Component Description:
Partial invoicing for Interim Antenna Install/estimate attached
Amount:
$35,000.00

Component Description:
Partial invoice for Interim Antenna Install/estimate attached
Amount:
$81,000.00
Guy wire re-tensioning

Component Description:
Retensioning of Guy Wire
Amount:
$26,788.80
Minor tower reinforcement/modifications

Component Description:
Replace pole for antenna/updated invoice attached
Amount:
$128,025.00
Structural engineering tower load study for well documented tower

Component Description:
Analysis for 891'Guyed Tower
Amount:
$7,500.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $77,397.32 $87,471.32 N/A $50,312.26 N/A
Total for all systems $2,757,434.95 $2,075,546.09 N/A $1,844,332.91 N/A
Outside Professional Services $77,397.32 $87,471.32 $50,312.26
Retuning Primary Transmitter $11,025.62 $11,025.62 N/A $8,700.56 N/A
NEPA Section 106 environmental review, if needed $6,310.00 $6,000.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $7,000.00 Actual costs came in higher than estimate $6,930.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $2,500.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $3,000.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $12,784.00 Actual costs came in higher than estimate $12,784.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $3,886.50 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A $510.00 N/A
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet $10,520.00 $10,000.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A $1,589.50 N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A N/A N/A
DTV Notification $2,965.00 $2,965.00 Medical Notification $2,965.00 2,965.00
Attorney Fees - Misc $7,446.70 $7,446.70 N/A $7,446.70 N/A

Components

Actual Information Description File Name
Retuning Primary Transmitter

Component Description:
Retuning of Primary Transmitter/Updated invoice with correct amount
Amount:
$8,700.56

Component Description:
Filter band for retuning of primary transmitter/Moving to category - existing transmitter primary
Amount:
N/A
NEPA Section 106 environmental review, if needed Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations

Component Description:
Negotiation Shared Locations
Amount:
$6,357.00

Component Description:
Negotiation Shared Locations
Amount:
$573.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Preparation of engineering portion of cp
Amount:
$1,375.00

Component Description:
Prepare engineering portions of cp
Amount:
$1,125.00
Perform engineering study for new channel assignment and antenna development

Component Description:
conduct channel study
Amount:
$187.50

Component Description:
Review channel assignment and implementation
Amount:
$1,937.50

Component Description:
Develop technical parameters for interim antenna
Amount:
$875.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form

Component Description:
Prepare and Review Reimbursement forms
Amount:
$90.00

Component Description:
Prepare and Review Reimbursement forms
Amount:
$180.00

Component Description:
Prepare and Review Reimbursement forms
Amount:
$2,255.00

Component Description:
Prepare and Review Reimbursement forms
Amount:
$225.00

Component Description:
Prepare and Review Reimbursement forms
Amount:
$67.00

Component Description:
Prepare and Review Reimbursement forms
Amount:
$286.50

Component Description:
Prepare and Review Reimbursement forms
Amount:
$389.00

Component Description:
Prepare and Review Reimbursement forms
Amount:
$3,166.00

Component Description:
Prepare and Review Reimbursement forms
Amount:
$923.00

Component Description:
Prepare and Review Reimbursement forms
Amount:
$2,295.00

Component Description:
Prepare and Review Reimbursement forms
Amount:
$2,292.50

Component Description:
Prepare and Review Reimbursement forms
Amount:
$90.00

Component Description:
Prepare and Review Reimbursement forms
Amount:
$255.00

Component Description:
Prepare and Review Reimbursement forms
Amount:
$270.00
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Prepare and file form 2100
Amount:
$3,417.50

Component Description:
Prepare and file form 2100
Amount:
$469.00
Prepare request for Special Temporary Authorization Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization

Component Description:
Special Temporary Authorization
Amount:
$340.00

Component Description:
Special Temporary Authorization
Amount:
$170.00
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet Information not provided.
ASR modification (prepare FCC Form 854)

Component Description:
ASR Modification
Amount:
$1,589.50
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
DTV Notification

Component Description:
Medical notification
Amount:
$2,965.00
Attorney Fees - Misc

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$180.20

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$286.50

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$180.00

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$1,050.50

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$180.00

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$1,412.00

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$170.00

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$191.00

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$919.50

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$191.00

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$191.00

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$336.00

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$360.00

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$708.00

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$270.00

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$180.00

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$180.00

Component Description:
Fees associated with progress reports, timing of transition, and issues for repack
Amount:
$461.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $46,965.83 $46,400.83 N/A $22,675.07 N/A
Total for all systems $2,757,434.95 $2,075,546.09 N/A $1,844,332.91 N/A
Other Expenses $46,965.83 $46,400.83 $22,675.07
Project Management $3,160.54 $3,160.54 N/A $442.62 N/A
Construction Equipment rental $5,000.00 $5,000.00 N/A $4,207.16 N/A
MVPD Notification of Channel Change $300.00 $300.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $2,000.00 $2,000.00 N/A N/A N/A
Equipment Storage $5,000.00 $5,000.00 N/A N/A N/A
Equipment Delivery and Handling Charges $18,025.29 $18,025.29 N/A $18,025.29 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $1,400.00 $1,400.00 N/A $0.00 N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Project Management

Component Description:
Hotel for repack conference March 2017
Amount:
$134.60

Component Description:
Project professional software for repack
Amount:
$2,319.98

Component Description:
Hotel for repack conference in DC
Amount:
$308.02

Component Description:
Reimbursement to project engineer for software to create drawings for repack project
Amount:
$397.94
Construction Equipment rental

Component Description:
Forklift Rental
Amount:
$827.08

Component Description:
Linoleum roller rental for floor in building addition.Invoice number fixed, resubmitting for payment.
Amount:
$53.00

Component Description:
Forklift Rental
Amount:
$827.08

Component Description:
Forklift Rental
Amount:
$2,500.00
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Shipping not billed on invoice 12307 which was a pre-payment.
Amount:
$4,821.90

Component Description:
Shipping charges not billed previously on invoice 575003 - Elbow & Conn Anchor/updated invoice attached
Amount:
$1,158.60

Component Description:
Shipping charges not previously billed on invoice 556016 - Rigid Transmission Line/updated invoice attached
Amount:
$2,886.19

Component Description:
Shipping charges not billed previously on invoice 575002 - Reducer & XFMR/updated invoice attached
Amount:
$1,158.60

Component Description:
Quote SQ157396.2 replaced original quote 802-035358 due to pricing change. Initial deposit paid on invoice 9500069216 in the amount of $70,773.75 based on 25% of original quote. Final invoice is $280,365.85 less initial deposit of $70,773.75.
Amount:
$8,000.00
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
DTV Medical Facility Notification Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,757,434.95 $2,075,546.09 $1,844,332.91

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Rebecca Wolf

Director of Finance


09/25/2019

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Rebecca Wolf

Director of Finance