(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
12472
Service:
DTV
Call Sign:
WXTX
Channel:
24 (UHF)
File Number:
0000024808
FRN:
0021205661
Date Submitted:
09/18/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WXTX LICENSE SUBSIDIARY, LLC

Doing Business As: WXTX LICENSE SUBSIDIARY, LLC

Paul Eriksen

2131 Ayrsley Town Blvd.

Charlotte, NC 28273

United States

+1 (706) 494-5426 periksen@americanspiritmedia.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Paul Eriksen

Controller

American Spirit Media

Paul Eriksen

1909 Wynnton Rd

Columbus, GA 31906

United States

+1 (706) 593-2333 periksen@americanspirittelevision.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Existing side mount antenna and line serves as interim Install new top mount and line New SS TX is less expensive than rental transmitter and re-tuning existing MSDC single tube TX

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use emergency standby
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model MX-1000
Year 2004
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 1.2 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model UAXTE-2
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 1.2 kW
Justification for New Transmitter existing transmitter cannot be re-tuned Rationale attached

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Primary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Paragon
Year 2009
Type Inductive Output Tube
IOT Power Type Single
Power Capacity 25 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model ULXTE-20
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 12.3 kW
Justification for New Transmitter New transmitter is less expensive than renting a interim transmitter and re-tuning the existing Comark MSDC transmitter. Headroom analysis attached

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 499.4 kW
Manufacturer
Model TFU-24ETT P230
Year 2002

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 183.0 kW
Manufacturer
Model TFU-16JTH/VP-R P230
Year 2017
Justification for New Antenna Existing antenna is single channel. Top in lieu of side mount allows side to be used as standby during construction. This is a less expensive option than standby antenna and line rental or purchase. Licensed e-pol.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 3/4 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1095 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 3/4 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1095 feet per run
Justification for New Transmission Line existing line is being used as interim.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1019105
Coordinates (NAD83) Latitude (NAD83) 32° 27' 41.0" N-
Longitude (NAD83) 084° 52' 43.0" W-
Overall Structure Height 1141.72 feet
Support Structure Height 1099.07 feet
Ground Elevation Above Mean Sea Level (AMSL) 367.45 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner WXTX License Subsidiary, LLC
Date Constructed 05/24/1983


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 595
Explanation Pattern analysis Antenna Spec Transmitter Spec Building drawings Installation Supervision Accounting Internal Legal
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement No
Address transition timing and coordination issues w/ other stations and wireless providers No
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Attorney - Other Matters

Legal Services

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? No
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Security

site security while tx line is on the ground

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $695,500.00 $629,867.57 N/A $578,857.57 N/A
Total for all systems $1,856,419.50 $1,657,132.97 N/A $1,113,235.97 N/A
Primary Transmitter ULXTE-20 $569,500.00 $570,836.09 $519,826.09
Transformer 3 phase/480v - 300 KVA $36,800.00 $35,000.00 N/A $19,990.00 N/A
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW $494,500.00 $499,836.09 see Estimated Cost Justification WXTX-110-1st Primary Transmitter-UHF Liquid Cooled Solid State, 8.2-13 kW v0 $499,836.09 N/A
Switchgear - industrial 800 amp $38,200.00 $36,000.00 N/A N/A N/A
Auxiliary Transmitter UAXTE-2 $126,000.00 $59,031.48 $59,031.48
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $126,000.00 $59,031.48 Gates Air quote GA00021685 $59,031.48 N/A

Components

Actual Information Description File Name
Transformer 3 phase/480v - 300 KVA

Component Description:
Tower Site Install
Amount:
$5,997.00

Component Description:
Tower site install
Amount:
$3,998.00

Component Description:
Tower site install
Amount:
$9,995.00
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW

Component Description:
ULXTE-20
Amount:
$228,431.31

Component Description:
ULXTE-20
Amount:
$45,686.26

Component Description:
ULXTE-20
Amount:
$68,529.39

Component Description:
Primary Transmitter
Amount:
$157,189.13
Switchgear - industrial 800 amp Information not provided.
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW

Component Description:
Move duct in transmitter site
Amount:
$250.00

Component Description:
Transmitter
Amount:
$19,323.38

Component Description:
UAXTE-2-E per Quote GA-00021685
Amount:
$7,891.62

Component Description:
UAXTE-2-E
Amount:
$5,261.08

Component Description:
UAXTE-2-E per Quote GA-00021685
Amount:
$26,305.40

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $296,230.00 $161,202.46 N/A $121,271.49 N/A
Total for all systems $1,856,419.50 $1,657,132.97 N/A $1,113,235.97 N/A
Primary Antenna TFU-16JTH/VP-R P230 $296,230.00 $161,202.46 $121,271.49
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $154,802.46 Quote attached total is net of change orders 1&2 attached $114,871.49 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A

Components

Actual Information Description File Name
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
Antenna, mount, transmission line, and other parts
Amount:
$40,940.49

Component Description:
UHF High Power Top Mount
Amount:
$73,931.00

Component Description:
Antenna
Amount:
$36,596.25
Sweep test of existing antenna

Component Description:
OTHER INCLUDES ONE FIELD ENGINEER ON-SITE
Amount:
$1,600.00

Component Description:
Sweep Test
Amount:
$1,600.00

Component Description:
Sweep Test
Amount:
$3,200.00

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $221,190.00 $199,537.80 N/A $143,439.22 N/A
Total for all systems $1,856,419.50 $1,657,132.97 N/A $1,113,235.97 N/A
Primary Transmission Line $221,190.00 $199,537.80 $143,439.22
Rigid Transmission Line - copper, 6 1/8" $221,190.00 $199,537.80 Quote attached $143,439.22 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Primary Transmission Line
Amount:
$47,644.55

Component Description:
Fixed-tuned PBR120 for EW127 1127SCM
Amount:
$505.54

Component Description:
Primary Transmission Line
Amount:
$95,289.13

Component Description:
Primary Transmission Line
Amount:
$47,644.57

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $381,100.00 $367,230.64 N/A $187,904.27 N/A
Total for all systems $1,856,419.50 $1,657,132.97 N/A $1,113,235.97 N/A
Primary Tower GTOWER $381,100.00 $367,230.64 $187,904.27
Structural engineering tower load study for well documented tower $12,600.00 $17,230.64 FDH Velocitel invoices 124512 and 132388 and 131722; Integrity Broadcast Services LLC Proposal: PI2817 $12,820.52 N/A
Tall Tower (greater than 500') $210,500.00 $200,000.00 N/A $174,765.00 N/A
Minor tower reinforcement/modifications $158,000.00 $150,000.00 N/A $318.75 N/A

Components

Actual Information Description File Name
Structural engineering tower load study for well documented tower

Component Description:
Inspection - 20% Deposit WXTX
Amount:
$1,404.52

Component Description:
Engineering Soil Borings
Amount:
$3,208.00

Component Description:
Engineering - structural analysis to Rev F
Amount:
$2,500.00

Component Description:
Engineering - soil borings
Amount:
$3,208.00

Component Description:
Engineering
Amount:
$1,000.00

Component Description:
Engineering
Amount:
$1,000.00

Component Description:
Engineering - structural analysis
Amount:
$2,500.00
Tall Tower (greater than 500')

Component Description:
Tower Service - Mobilization
Amount:
$55,000.00

Component Description:
Tower service-Completion of WXTX
Amount:
$119,765.00
Minor tower reinforcement/modifications

Component Description:
Engineering - Material only
Amount:
$7,307.00

Component Description:
Locate specified areas at tower
Amount:
$318.75

Component Description:
Engineering - Material only
Amount:
$7,307.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $198,233.18 $243,728.18 N/A $76,584.56 N/A
Total for all systems $1,856,419.50 $1,657,132.97 N/A $1,113,235.97 N/A
Outside Professional Services $198,233.18 $243,728.18 $76,584.56
Attorney - Other Matters $303.18 $303.18 Please see WXTX Justification Attorney - Other Matters V.1 $303.18 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 N/A $37,029.50 N/A
Project management of the transition $94,010.00 $144,675.00 Widelity quote $36,126.88 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $2,000.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $1,125.00 N/A

Components

Actual Information Description File Name
Attorney - Other Matters

Component Description:
ASM Attorneys Fee- Draft 10 Week Form 387 Report for WXTX
Amount:
$303.18
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Comprehensive coverage verification via field study, if needed

Component Description:
001 Field Services Tower Foundation Work
Amount:
$37,029.50
Project management of the transition

Component Description:
Project Management
Amount:
$269.50

Component Description:
Project Management
Amount:
$1,782.20

Component Description:
Project Management
Amount:
$59.03

Component Description:
Project Management
Amount:
$2,949.40

Component Description:
Project Management
Amount:
$3,519.85

Component Description:
Project Management
Amount:
$3,993.70

Component Description:
Project Management
Amount:
$5,014.55

Component Description:
Project Management
Amount:
$3,004.85

Component Description:
Project Management
Amount:
$4,162.85

Component Description:
Project Management
Amount:
$2,734.60

Component Description:
Project Management
Amount:
$198.49

Component Description:
Project Management
Amount:
$2,239.20

Component Description:
Project Management
Amount:
$3,499.40

Component Description:
Project Management
Amount:
$2,897.75
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
FCC Form 2100 Construction Permit Application
Amount:
$2,000.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Engineering study work for new channel assignment and antenna development.
Amount:
$1,000.00

Component Description:
Engineering study work for new channel assignment and antenna development.
Amount:
$125.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $64,166.32 $55,566.32 N/A $5,178.86 N/A
Total for all systems $1,856,419.50 $1,657,132.97 N/A $1,113,235.97 N/A
Other Expenses $64,166.32 $55,566.32 $5,178.86
Security $6,000.00 $6,000.00 to eliminate the risk of copper theft while the transmission line is on the ground N/A N/A
MVPD Notification of Channel Change $0.00 $0.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $2,850.00 $2,850.00 estimate for on air rescan announcement production Quote attached N/A N/A
DTV Medical Facility Notification $11,550.00 $2,950.00 Group quote attached $2,950.00 N/A
Equipment Delivery and Handling Charges $13,266.32 $13,266.32 On site forklift rental estimate Representative quote attached Shipping and handling charges on invoice 42001 $2,228.86 N/A
Equipment Storage $30,500.00 $30,500.00 Estimate for Dielectric on site antenna storage Dielectric letter attached N/A N/A

Components

Actual Information Description File Name
Security Information not provided.
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
DTV Medical Facility Notification

Component Description:
FCC Repack Medical Notification Mailing complete
Amount:
$2,950.00
Equipment Delivery and Handling Charges

Component Description:
Heavy Duty Tow Charges
Amount:
$210.00

Component Description:
Light Tower Towable Small
Amount:
$2,018.86

Component Description:
Equipment handling and delivery
Amount:
$10,296.32
Equipment Storage Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $1,856,419.50 $1,657,132.97 $1,113,235.97

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Paul Eriksen

Conroller


09/18/2019

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Paul Eriksen

Controller


09/18/2019