Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
69619
Service:
DTV
Call Sign:
KBCW
Channel:
28 (UHF)
File Number:
0000027831
FRN:
0003742632
Date Submitted:
08/28/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

SAN FRANCISCO TELEVISION STATION KBCW INC

Doing Business As: SAN FRANCISCO TELEVISION STATION KBCW INC

Daniel G. Ryson

1725 DESALES ST NW

SUITE 501

WASHINGTON, DC 20036

United States

+1 (202) 457-4505 dryson@cbs.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Daniel G Ryson

Associate Director of Spectrum Management

CBS

Daniel G. Ryson

1725 DeSales Street NW

Suite 501

Washington, DC 20036

United States

+1 (202) 457-4074 dryson@cbs.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan Facility located at Sutro Tower has a main elliptically polarized ant and a broadband aux ant. Main antenna replacement requires replacment of structural steel. Post-transition transmitter will be pretuned to the post transition channel

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Sigma CD
Year 2002
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 60 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-120
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 75.1 kW
Justification for New Transmitter GatesAir will not retune IOT transmitters (see Exhibit 1). The minimum capable ULXTE-80 transmitter has less headroom than present (see Exhibit 48), the ULXTE-90 estimated cost establishes reimbursement.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 0.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Auxiliary (Backup)
Description of Use Alternate/Backup
Ownership Leased
Owner Sutro Tower, Inc.
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Bottom
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 5
Number of Panels 40
Design power capacity in use 80.0 %
Lower Limit 470.00 MHz
Upper Limit 698.00 MHz
Other Antenna Type N/A
ERP: 500.0 kW
Manufacturer Dielectric
Model TUA-C4SP-12/40U-1-S
Year 2007

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
58912 KPJK
35500 KQED
43095 KMTP-TV
51429 KFSF-DT
71586 KCNS

Auxiliary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 5
Frequencies of channels supported RF channel
Frequency N/A

Enter a list of RF channel numbers.

RF Channel Number
34
28
30
32

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Fill Holes

Fill Holes in Concrete After Removing Old Combiner Lines.

Core Drill Holes

Drill Holes in Concrete for New Transmission Line Pass Through

Replace Combiner Switches

Remove and Replace Combiner 6-Inch Coaxial Switches.

Remove Old Combiner Lines

Remove Old Combiner Transmission Line Interconnects

Remove Old Combiner

Remove Old Combiner

Install New Combiner Lines

Install New Combiner Transmission Line Interconnects

Install New Combiner

Install New Aux Combiner

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Bottom
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-19JSC/VP-R C150SP
Year 2009

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Bottom
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-24DSC/VP-R C140 DC
Year 2019
Justification for New Antenna Current antenna is single-channel, and cannot be retuned to new frequency.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 8 3/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-24WB/VP-R C160
Year 2019
Justification for New Antenna Because existing Auxiliary antenna is much lower and limited to 500 kW ERP, operation would result in extensive coverage loss.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Auxiliary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Auxiliary (Backup)
Description of Use When Main Isn't Available
Ownership Leased
Owner Sutro Tower, Inc.
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 745 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
58912 KPJK
35500 KQED
43095 KMTP-TV
71586 KCNS

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Assd. Transmission Line

Various transmission lines and hardware to restore non-repacked stations after tower reinforcement.

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Waveguide
Diameter N/A
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 1085 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 1490 feet per run
Justification for New Transmission Line Reduce structural stress on tower and Stack B to reduce structural reinforcement needs. (See Exhibits 48 and 49.)

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

RF Accessories

Coaxial Switch, Switch Controller, Test Load. (See Exhibit 3, Item D)

Prelim TX Line Parts List

Preliminary List of Transmission Line Parts; Reconfiguration of Combiners.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 6 1/8 inches
Segment Length 19 ¾ '
Other Segment Length
Number of parallel runs 1
Length 100 feet per run
Justification for New Transmission Line Required to connect existing waveguide to interim antenna.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? Candelabra
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1001289
Coordinates (NAD83) Latitude (NAD83) 37° 45' 19.0" N-
Longitude (NAD83) 122° 27' 10.0" W-
Overall Structure Height 976.69 feet
Support Structure Height 779.85 feet
Ground Elevation Above Mean Sea Level (AMSL) 833.98 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner SUTRO TOWER INC
Date Constructed 03/27/1998

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
35500 KQED DTV
54770 KFOG FM
51429 KFSF-DT DTV
59964 KISQ FM
71586 KCNS DTV
70032 KSOL FM
58912 KPJK DTV
35703 KTVU DTV
34470 KGO-TV DTV
43095 KMTP-TV DTV
65526 KRON-TV DTV
65484 KOSF FM
6380 KOIT FM
25452 KPIX-TV DTV

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for tower with candelabra
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Candelabra
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Install KFOG Aux

Install KFOG(FM) Auxiliary Antenna at Level 5, South Leg.

Tower Mapping

Tower mapping for preparation of documentation necessary for tower load study.

Remove Waveguide Ladder

Remove Old Waveguide Ladder from B and C Legs. See Exhibit 23

Install KQED-FM Ant

Reinstall KQED-FM Antenna After "B" Stack Replacement.

Demolish Waveguide

Demolish Existing Waveguide to KBCW Antenna.

Install Interim KBCW Ant and Line

Install KBCW Interim Antenna and Transmission Line.

Install Primary KBCW Line

Install Transmission Line to New KBCW Primary Antenna.

Remove ENG Mounts

Remove ENG Mounts to Make Room for KFOG Antenna Location

Remove KQED-FM Ant

Remove KQED-FM Antenna from "B" Stack that Must Be Replaced.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 250
Explanation Company lacks sufficient internal resources.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application No
For Auxiliary Facility N/A
For Main Facility N/A
Prepare and file Form FCC License to Cover Application No
For Auxiliary Facility N/A
For Main Facility N/A
Prepare request for Special Temporary Authority No
Quantity N/A
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement No
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? No
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Alternate Site Studies

Pre, Post and Alternate Site Studies

Architectural Plans

Architectural plans, building mapping, update plans.

Fork Lift Rental

Utilized to deliver equipment from storage, remove equipment from transmitter room.

KFOG Interim Antenna

Includes Antenna and Antenna Engineering.

Legal Fees

Legal Fees

Public Relations

Required as part of zoning effort.

Site Survey

Determine actual site conditions and determine the materials and components required for system installation integration of the site with the transmitter equipment. See Exhibit 12.

VSWR Monitoring

VSWR Monitoring and antenna lockout system.

Sales Tax - Sutro Tower

9.5% Sales Tax on Sutro Tower Invoices Only.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,755,309.51 $1,883,780.77 N/A $1,072,649.84 N/A
Total for all systems $7,134,640.26 $7,312,113.61 N/A $2,255,942.14 N/A
Primary Transmitter ULXTE-120 $1,755,309.51 $1,883,780.77 $1,072,649.84
Service entrance 3 phase/800 amp/208 volt $14,400.00 $165,000.00 See Exhibit 4. N/A N/A
Other -- Building Addition Size: 0.0 $109,806.00 $109,806.00 Abatement, Flooring, Demo, Paint, Fire Stop, Seismic (Please See Exhibit 4.) N/A N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $14,671.26 Please see Exhibit 51, Item D. $9,780.84 N/A
UHF - Liquid Cooled Solid State Transmitter 75.1 kW $1,594,303.51 $1,594,303.51 Please see Exhibits 48 and 51 - Items A, B, and E. This is the cost for a "comparable" ULXTE-90 transmitter, Mask Filter, Installation, and Proof. RF Accessories and Electrical costs are listed separately. $1,062,869.00 N/A

Components

Actual Information Description File Name
Service entrance 3 phase/800 amp/208 volt Information not provided.
Other -- Building Addition Size: 0.0 Information not provided.
Transformer 3 phase/480v - 300 KVA

Component Description:
Down payment for primary transmitter electrical. See Exhibit 45C Item D and Exhibit 48.
Amount:
$4,890.42

Component Description:
Invoice is for upgraded ULXTE-120 transmitter. Seeking reimbursement for comparable ULXTE-90. This cost category is for line item D. Other costs are listed separately.
Amount:
$4,890.42

Component Description:
Down payment for Primary Transmitter Electrical Items. See Exhibit 45 Item D.
Amount:
$4,740.00
UHF - Liquid Cooled Solid State Transmitter 75.1 kW

Component Description:
Primary Transmitter Down Payment. See attachments to Exhibits 45C and 48.
Amount:
$531,434.50

Component Description:
Invoice is for upgraded ULXTE-120 transmitter. Seeking reimbursement for comparable ULXTE-90. This cost category is for line items A, B and E. Other costs are listed separately.
Amount:
$531,434.50

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $620,139.00 $569,589.00 N/A $0.00 N/A
Total for all systems $7,134,640.26 $7,312,113.61 N/A $2,255,942.14 N/A
Interim Antenna TFU-24WB/VP-R C160 $203,876.00 $203,696.00 $0.00
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized $197,146.00 $197,146.00 Antenna, elbow complex, brackets and custom mounting brackets. Includes 50-75 ohm matching transformer required for proper operation. N/A N/A
Sweep test of existing antenna $6,730.00 $6,550.00 N/A N/A N/A
Primary Antenna TFU-24DSC/VP-R C140 DC $267,190.00 $247,770.00 $0.00
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized $216,800.00 $216,800.00 This cost is for a "comparable" antenna including side-mount brackets. See Exhibit 6, Line 1. N/A N/A
Sweep test of existing antenna $6,730.00 $12,240.00 Please See Exhibit 9, Line 4. N/A N/A
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) $15,250.00 $13,730.00 Elbow complex for the "comparable" antenna system. See Exhibit 6, Line 2. N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $0.00 Side mount brackets are itemized in the "comparable" antenna base cost quote but not in the "upgrade" antenna base cost quote. For uniformity, we'll add these figures and show them only under the antenna. N/A N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A N/A N/A
Auxiliary Antenna TUA-C4SP-12/40U-1-S $149,073.00 $118,123.00 $0.00
Install New Combiner $12,240.00 $12,240.00 KBCW pro-rata share (50%) of Lower Aux Combiner, Install New. See Exhibit 9 N/A N/A
Install New Combiner Lines $12,240.00 $12,240.00 KBCW pro-rata share (50%) of Lower Aux Combiner, New Transmission Line Interconnects. See Exhibit 9 N/A N/A
Remove Old Combiner $6,120.00 $6,120.00 KBCW pro-rata share (50%) of Lower Aux Combiner, Remove Old. See Exhibit 9 N/A N/A
Sweep test of existing antenna $6,730.00 $12,240.00 KBCW pro-rata share (50%) of Lower Aux Combiner, RF Testing, Complex. See Exhibit 9 N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $48,000.00 Please see Exhibit 7 Page 58. Combiner used by 4 stations; cost shared among 2 repacking stations. N/A N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A N/A N/A
Remove Old Combiner Lines $3,060.00 $3,060.00 KBCW pro-rata share (50%) of Lower Aux Combiner, Remove Old Transmission Line Interconnects. See Exhibit 9 N/A N/A
Replace Combiner Switches $6,120.00 $6,120.00 KBCW pro-rata share (50%) of Lower Aux Combiner, Remove and Replace Coaxial Switches. See Exhibit 9 N/A N/A
Fill Holes $3,219.00 $3,219.00 Fill Concrete Holes in Floor Wall After Removing Old Combiner Transmission Lines. See Exhibit 11 "Combiner Lower Aux 29-30-32-34" N/A N/A
Core Drill Holes $9,884.00 $9,884.00 Pro Rata Share to Drill Holes in Concrete for New Combiner Lines. See Exhibit 11 "Combiner Lower Aux 28 30 32 34" N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,213,867.57 $971,885.10 N/A $562,964.48 N/A
Total for all systems $7,134,640.26 $7,312,113.61 N/A $2,255,942.14 N/A
Interim Transmission Line $20,200.00 $35,802.38 $0.00
Rigid Transmission Line - copper, 6 1/8" $20,200.00 $35,802.38 Transmission line shown as sum of two quotes. Exhibit 37: $14,488.88 at 3rd Floor and Exhibit 38: $21,313.50 at Tower Top. Installation shown separately. Also See Exhibit 48. N/A N/A
Primary Transmission Line $1,147,434.57 $889,849.72 $562,964.48
Rigid Transmission Line - copper, 8 3/16" broadband $594,510.00 $474,044.00 See Statement (Exhibit 48) and Quote (Exhibit 50) for details. This reimbursable cost excludes $39,603 for upgraded broadband transmission line. $208,203.65 N/A
Prelim TX Line Parts List $6,833.33 $6,833.33 See Exhibit 44. Total cost shared among six stations. $2,320.52 N/A
RF Accessories $169,596.24 $169,596.24 Waveguide switches, switch controller, test load, and various cut lengths of line and waveguide. (See Exhibit 48, Item C) $113,064.16 N/A
Rigid Transmission Line - copper, 8 3/16" $376,495.00 $239,376.15 ***System Notice: Estimate adjusted and locked because line has been superseded.***Irregular tower shape requires many elbows and hangers. See Exhibit 6, line 3. $239,376.15 N/A
Auxiliary Transmission Line $46,233.00 $46,233.00 $0.00
Assd. Transmission Line $46,233.00 $46,233.00 Repack to lower frequencies generally requires larger antennas with higher windloading. Structural reinforcement displaces lines of non-repacked stations. This cost reflects those costs. See Exhibit 7, page 47, N/A N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 6 1/8" Information not provided.
Rigid Transmission Line - copper, 8 3/16" broadband

Component Description:
Invoice is for Sutro Tower work through 2/28/2018. This amount reflects the project payment for transmission line - minus the $39,603 upgrade to broadband line.
Amount:
$199,773.15

Component Description:
Invoice is for Sutro Tower work through 4/30/2018. This amount reflects special spring hanger costs. See Exhibit 57.
Amount:
$700.80

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects final transmission line parts invoice cost.
Amount:
$7,729.70
Prelim TX Line Parts List

Component Description:
See Exhibit 29B Page 9. (Includes Business Class Airfare Deduction on August 28, 2019)
Amount:
$2,320.52
RF Accessories

Component Description:
Down payment for primary transmitter RF Accessories. See Exhibit 45C Item C and Exhibit 48.
Amount:
$56,532.08

Component Description:
Invoice is for upgraded ULXTE-120 transmitter. Seeking reimbursement for comparable ULXTE-90. This cost category is for line item C. Other costs are listed separately.
Amount:
$56,532.08

Component Description:
Primary Transmitter RF Accessories. See Exhibit 45 Item C.
Amount:
$21,426.23
Rigid Transmission Line - copper, 8 3/16"

Component Description:
See Exhibit 31 Page 13
Amount:
$239,376.15
Assd. Transmission Line Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,544,877.73 $2,806,289.29 N/A $340,230.52 N/A
Total for all systems $7,134,640.26 $7,312,113.61 N/A $2,255,942.14 N/A
Primary Tower TOWER $2,544,877.73 $2,806,289.29 $340,230.52
Remove Waveguide Ladder $67,476.64 $67,476.64 Remove Old Waveguide Ladder from B and C Legs. See Last Item on Exhibit 23. This is the pro rata share after splitting anticipated cost with KRON-TV and KGO-TV. $67,476.64 The subtotal is equal to the estimated cost but the form says it's greater.
Install Primary KBCW Line $381,000.00 $381,000.00 See Exhibit 42 for Installing Line to KBCW Primary Antenna. $127,338.24 N/A
Install Interim KBCW Ant and Line $176,925.00 $176,925.00 See Exhibit 39: $18,000 for 3rd Floor Transmission Line Install; Exhibit 40: $14,925 for 3rd Floor Wall Penetrations, and Exhibit 41: $144,000 for Antenna and Tower Transmission Line Install. $0.00 N/A
Structural engineering tower load study for a documented tower with candelabra $20,000.00 $247,333.00 Sutro Tower is not a typical structure. (See Exhibit 8.) $137,310.55 N/A
Serious tower reinforcement/modifications $1,052,000.00 $1,187,364.02 Itemized on Exhibit 33 Pg15 Line 59 "B" Stack Removal, Replacement, and Installation ($599,490+$190,490.91+$190,490.91)/3 plus Line 59A Level 6 Reinforcement ($1,072,218.18 + $169,135.00)/6 N/A N/A
Demolish Waveguide $210,000.00 $210,000.00 See Exhibit 23. N/A N/A
Remove ENG Mounts $28,500.00 $28,500.00 Required to accommodate KFOG(FM) antenna relocation. See Exhibit 34. Cost shared with KRON-TV and KGO-TV. ($85,500/3 = $28,500.00) N/A N/A
Install KFOG Aux $70,027.58 $70,027.58 Install KFOG(FM) Aux Antenna to Permit Work on Stack "B" without Exceeding RF Exposure Limits. See Exhibit 33 Pg. 15 Line Item 64. Cost shared with KRON-TV and KGO-TV. $210,082.73 / 3 = $70,027.58. N/A N/A
Tower Mapping $13,877.00 $13,877.00 Pro-rata cost required to provide accurate input data to structural analysis. See Exhibit 9, line 1. $8,105.09 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $319,714.54 Removal and installation of KBCW primary antenna on "B" Stack, plus materials. Please see itemized costs on last page of Exhibit 33, Repack Line 35 ($118,218.18) plus Line 36 ($25,460.00 and $176,036.36). N/A N/A
Install KQED-FM Ant $64,665.45 $64,665.45 Remove KQED-FM Antenna From "B" Stack that Must Be Replaced. See Exhibit 33 Pg. 15 Line Item 59C. Cost shared with KRON and KGO. ($176,036.36 + $17,960.00) / 3 = $64,665.45. N/A N/A
Remove KQED-FM Ant $39,406.06 $39,406.06 Remove KQED-FM Antenna From "B" Stack that Must Be Replaced. See Exhibit 33 Pg. 15 Line Item 59B. Cost shared with KRON and KGO. $118,218.18 / 3 = $39,406.06. N/A N/A

Components

Actual Information Description File Name
Remove Waveguide Ladder

Component Description:
See Exhibit 30B Page 30
Amount:
$26,308.33

Component Description:
See Exhibit 29B Page 9
Amount:
$13,534.16

Component Description:
See Exhibit 31 Page 13
Amount:
$3,324.16

Component Description:
See Exhibit 28 Page 8
Amount:
$5,986.66

Component Description:
See Exhibit 23 for quote and Exhibit 27 Page 8.
Amount:
$18,323.33
Install Primary KBCW Line

Component Description:
Invoice is for Sutro Tower work through 6/30/2018. This amount reflects primary transmission line installation cost.
Amount:
$51,389.41

Component Description:
Invoice is for Sutro Tower work through 4/30/2018. This amount reflects primary transmission line installation cost.
Amount:
$38,870.08

Component Description:
Invoice is for Sutro Tower work through 3/31/2018. This amount reflects primary transmission line installation cost.
Amount:
$19,425.00

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects primary transmission line installation cost.
Amount:
$17,653.75
Install Interim KBCW Ant and Line Information not provided.
Structural engineering tower load study for a documented tower with candelabra

Component Description:
Invoice is for Sutro Tower work through 1/31/2018. This amount reflects structural engineering cost.
Amount:
$7,744.71

Component Description:
Invoice is for Sutro Tower work through 6/30/2018. This amount reflects structural engineering cost.
Amount:
$7,596.37

Component Description:
See Exhibit 30B Page 30. This revision adds Rowan Williams Davies & Irwin proposal per 4/3/2019 RFI.
Amount:
$16,439.50

Component Description:
See Exhibit 29B Page 9
Amount:
$15,037.22

Component Description:
Invoice is for Sutro Tower work through 4/30/2018. This amount reflects structural engineering cost.
Amount:
$4,887.33

Component Description:
Invoice is for Sutro Tower work through 3/31/2018. This amount reflects structural engineering cost.
Amount:
$34,609.75

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects structural engineering cost.
Amount:
$11,725.05

Component Description:
See Exhibit 31 Page 13
Amount:
$33,020.77

Component Description:
See Exhibit 24 Line 58.
Amount:
$3,788.50

Component Description:
See Exhibit 28 Page 8
Amount:
$1,337.00

Component Description:
See Exhibit 27 - Page 8
Amount:
$1,124.35
Serious tower reinforcement/modifications Information not provided.
Demolish Waveguide Information not provided.
Remove ENG Mounts Information not provided.
Install KFOG Aux Information not provided.
Tower Mapping

Component Description:
Invoice is for Sutro Tower work through 6/30/2018. This amount reflects tower mapping cost.
Amount:
$2,888.88

Component Description:
See Attachment 30B Page 30.
Amount:
$152.41

Component Description:
Pro rata share of tower mapping. See Exhibit 29B page 9.
Amount:
$3,081.56

Component Description:
Invoice is for Sutro Tower work through 3/31/2018. This amount reflects tower mapping cost.
Amount:
$1,481.09

Component Description:
See Exhibit 24, Line 5
Amount:
$113.67

Component Description:
See Exhibit 27 Page 8
Amount:
$118.82

Component Description:
See Exhibit 28 Page 8.
Amount:
$268.66
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) Information not provided.
Install KQED-FM Ant Information not provided.
Remove KQED-FM Ant Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $163,160.00 $243,833.00 N/A $23,158.44 N/A
Total for all systems $7,134,640.26 $7,312,113.61 N/A $2,255,942.14 N/A
Outside Professional Services $163,160.00 $243,833.00 $23,158.44
RF Exposure Measurements $21,050.00 $3,333.00 Please see Exhibit 14. N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $75,000.00 Please see Exhibit 14 N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Project management of the transition $39,500.00 $148,000.00 Company lacks sufficient internal resources. 250 hours at $150 per hour plus time estimated in Exhibit 13. $15,100.12 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $6,283.32 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A $1,775.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A

Components

Actual Information Description File Name
RF Exposure Measurements Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
Project management of the transition

Component Description:
Invoice is for Sutro Tower work through 1/31/2018. This amount reflects Sutro Tower project management cost.
Amount:
$293.75

Component Description:
Invoice is for Sutro Tower work through 2/28/2018. This amount reflects Sutro Tower project management cost.
Amount:
$812.07

Component Description:
Invoice is for Sutro Tower work through 6/30/2018. This amount reflects Sutro Tower project management cost.
Amount:
$938.74

Component Description:
See Exhibit 30B Page 30
Amount:
$125.00

Component Description:
See Exhibit 29B Page 9
Amount:
$889.58

Component Description:
Invoice is for Sutro Tower work through 4/30/2018. This amount reflects Sutro Tower project management cost.
Amount:
$1,203.74

Component Description:
Invoice is for Sutro Tower work through 3/31/2018. This amount reflects Sutro Tower project management cost.
Amount:
$2,051.38

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects Sutro Tower project management cost.
Amount:
$1,188.75

Component Description:
See Exhibit 31 Page 13
Amount:
$146.87

Component Description:
Sutro Project Management. See Exhibit 27 page 8.
Amount:
$738.22

Component Description:
See Exhibit 28 Page 8
Amount:
$1,396.39

Component Description:
See Exhibit 24, Line 129. For work performed, dates, hours, and rate, please see Exhibit 25. The total shown was divided by the six repacking stations.
Amount:
$5,315.63
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Perform engineering study for new channel assignment and antenna development

Component Description:
Invoice is for Sutro Tower work through 4/30/2018. This amount reflects cost of updating antenna engineering studies.
Amount:
$233.33

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects new antenna development (updating drawings) cost.
Amount:
$570.83

Component Description:
Engineering Study for New Channel Assignment.
Amount:
$1,312.50

Component Description:
Calculation of necessary height and ERP for non-repack station KFOG-FM.
Amount:
$275.83

Component Description:
See Exhibit 24 Line 3.
Amount:
$3,890.83
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application

Component Description:
Prepare Engineering Section of FCC Form 2100 Construction Permit Application.
Amount:
$1,775.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $837,286.45 $836,736.45 N/A $256,938.86 N/A
Total for all systems $7,134,640.26 $7,312,113.61 N/A $2,255,942.14 N/A
Other Expenses $837,286.45 $836,736.45 $256,938.86
Site Survey $9,147.00 $9,147.00 Determine actual site conditions and determine the materials and components required for system installation/integration of the customers site with the transmitter equipment. See Exhibit 46. $9,147.00 N/A
Public Relations $19,108.00 $19,108.00 Public relations required for zoning hearings, neighbors, and government officials. See Exhibit 18. $3,291.49 N/A
Equipment Delivery and Handling Charges $32,000.00 $32,000.00 Please see Exhibit 15 and Exhibit 3. $1,220.11 N/A
Architectural Plans $51,369.00 $51,369.00 Pro rata Share of Architectural Plans, Building Mapping, Update Plans. See Exhibit 32. Total includes reimbursables but not Additional Service Request 001. $40,252.28 N/A
MVPD Notification of Channel Change $1,000.00 $1,000.00 N/A N/A N/A
Alternate Site Studies $108,882.88 $108,882.88 Preliminary repack study, Alternate site studies, and Prelim TL Parts List. (Project Line# 1, 2, and 4) $106,427.76 N/A
KFOG Interim Antenna $17,710.00 $17,710.00 KFOG(FM) Interim Antenna, pro rata share. Does not include shipping or installation. N/A N/A
Legal Fees $22,667.00 $22,667.00 Legal fees. See Exhibit 13. $0.00 N/A
Fork Lift Rental $25,636.00 $25,636.00 Required to move equipment from storage to transmitter and combiner room, throughout site. See Exhibit 17. $4,291.65 N/A
Local Zoning $183,333.00 $183,333.00 Please see Exhibit 13. $41,551.68 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $8,333.00 $8,333.00 Please see exhibit 15. $2,218.66 N/A
Equipment Storage $20,833.00 $20,833.00 Please see Exhibit 15. N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A N/A N/A
Sales Tax - Sutro Tower $142,159.00 $142,159.00 9.5% San Francisco Sales Tax - on Sutro Tower, Inc. materials only. See Exhibit 31. $40,693.94 N/A
VSWR Monitoring $183,558.57 $183,558.57 VSWR Monitoring of antennas, transmission line, and combiner. Helps assure equipment won't be damaged by excessive transmitter power during fault conditions. See Exhibit 35. Total Cost of $1,101,351.42 is shared among six repack stations. $7,844.29 N/A

Components

Actual Information Description File Name
Site Survey

Component Description:
Site Survey. Please see Exhibits 47 and 48.
Amount:
$9,147.00
Public Relations

Component Description:
See Exhibit 28 Page 8
Amount:
$212.50

Component Description:
Invoice is for Sutro Tower work through 6/30/2018. This amount reflects public relations costs.
Amount:
$525.00

Component Description:
See Exhibit 29B Page 9
Amount:
$712.50

Component Description:
Invoice is for Sutro Tower work through 4/30/2018. This amount reflects public relations cost.
Amount:
$337.50

Component Description:
Invoice is for Sutro Tower work through 2/28/2018. This amount reflects public relations costs.
Amount:
$225.00

Component Description:
Invoice is for Sutro Tower work through 3/31/2018. This amount reflects public relations cost.
Amount:
$150.00

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects public relations costs.
Amount:
$312.50

Component Description:
See Exhibit 27 - Page 8
Amount:
$62.50

Component Description:
See Exhibit 24 Line 57
Amount:
$237.50

Component Description:
See Exhibit 31 Page 13
Amount:
$516.49
Equipment Delivery and Handling Charges

Component Description:
Invoice is for Sutro Tower work through 4/30/2018. This amount reflects shipping delivery and handling cost.
Amount:
$288.45

Component Description:
Invoice is for Sutro Tower work through 6/30/2018. This amount reflects shipping delivery and handling cost.
Amount:
$255.31

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects shipping delivery and handling cost.
Amount:
$676.35
Architectural Plans

Component Description:
Invoice is for Sutro Tower work through 1/31/2018. This amount reflects architectural planning costs.
Amount:
$1,038.80

Component Description:
See Exhibit 30B Page 30. (Corrected $2 Discrepancy in amount May 8, 2019.)(Includes Business Class Airfare Deduction on August 28, 2019)
Amount:
$2,169.97

Component Description:
See Exhibit 29B Page 9.
Amount:
$8,439.89

Component Description:
Invoice is for Sutro Tower work through 4/30/2018. This amount reflects architectural planning costs.
Amount:
$501.17

Component Description:
Invoice is for Sutro Tower work through 3/31/2018. This amount reflects architectural planning costs.
Amount:
$6,107.75

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects architectural planning costs.
Amount:
$612.05

Component Description:
Invoice is for Sutro Tower work through 2/28/2018. This amount reflects architectural planning costs.
Amount:
$854.73

Component Description:
See Exhibit 28 page 8
Amount:
$10,460.43

Component Description:
See Exhibit 31 Page 13.
Amount:
$10,067.49
MVPD Notification of Channel Change Information not provided.
Alternate Site Studies

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects site right of entry costs.
Amount:
$12,916.66

Component Description:
See Exhibit 24 Lines 1, 2, & 4 which total $93,511.11. Subtracted a one-cent compounded rounding error.
Amount:
$93,511.10
KFOG Interim Antenna Information not provided.
Legal Fees Information not provided.
Fork Lift Rental

Component Description:
Invoice is for Sutro Tower work through 6/30/2018. This amount reflects fork lift rental cost.
Amount:
$858.33

Component Description:
Invoice is for Sutro Tower work through 4/30/2018. This amount reflects fork lift rental cost.
Amount:
$858.33

Component Description:
Invoice is for Sutro Tower work through 2/28/2018. This amount reflects fork lift rental cost.
Amount:
$858.33

Component Description:
Invoice is for Sutro Tower work through 3/31/2018. This amount reflects fork lift rental cost.
Amount:
$858.33

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects fork lift rental cost.
Amount:
$858.33
Local Zoning

Component Description:
Invoice is for Sutro Tower work through 1/31/2018. This amount reflects building permits cost.
Amount:
$812.09

Component Description:
Invoice is for Sutro Tower work through 1/31/2018. This amount reflects local zoning cost.
Amount:
$367.17

Component Description:
Invoice is for Sutro Tower work through 2/28/2018. This amount reflects legal fees.
Amount:
$934.48

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects building permit costs.
Amount:
$704.66

Component Description:
Invoice is for Sutro Tower work through 6/30/2018. This amount reflects legal costs.
Amount:
$1,276.56

Component Description:
See Exhibit 30B Page 30
Amount:
$705.37

Component Description:
See Exhibit 30B Page 30
Amount:
$283.49

Component Description:
See Exhibit 29A Page 9
Amount:
$4,666.93

Component Description:
Invoice is for Sutro Tower work through 4/30/2018. This amount reflects legal fees.
Amount:
$238.05

Component Description:
See Exhibit 29B Page 9
Amount:
$2,001.96

Component Description:
Invoice is for Sutro Tower work through 3/31/2018. This amount reflects legal fees.
Amount:
$509.43

Component Description:
Invoice is for Sutro Tower work through 2/28/2018. This amount reflects building permit cost.
Amount:
$67.68

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects legal costs.
Amount:
$274.07

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects building permit costs.
Amount:
$407.31

Component Description:
See Exhibit 24 Lines 56 and 139.
Amount:
$23,130.11

Component Description:
See Exhibit 28 Page 8
Amount:
$2,054.29

Component Description:
See Exhibit 31 Page 13.
Amount:
$100.54

Component Description:
See Exhibit 28 Page 8
Amount:
$537.93

Component Description:
See Exhibit 27 Page 8
Amount:
$2,281.73

Component Description:
See Exhibit 31 Page 13
Amount:
$197.83
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Invoice is for Sutro Tower work through 6/30/2018. This amount reflects disposal, removal, patches, etc. cost.
Amount:
$2,218.66
Equipment Storage Information not provided.
DTV Medical Facility Notification Information not provided.
Sales Tax - Sutro Tower

Component Description:
Invoice is for Sutro Tower work through 4/30/2018. This amount reflects California State Use Tax. See Exhibit 57 page 9.
Amount:
$20,346.97

Component Description:
See Exhibit 31 Page 13
Amount:
$20,346.97
VSWR Monitoring

Component Description:
Invoice is for Sutro Tower work through 6/30/2018. This amount reflects VSWR monitoring system cost.
Amount:
$4,183.54

Component Description:
Invoice is for Sutro Tower work through 4/30/2018. This amount reflects preliminary VSWR monitoring system engineering cost.
Amount:
$1,569.09

Component Description:
Invoice is for Sutro Tower work through 5/31/2018. This amount reflects VSWR monitoring system cost.
Amount:
$2,091.66

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $7,134,640.26 $7,312,113.61 $2,255,942.14

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Andrew J Siegel

Assistant Secretary


08/28/2019

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Andrew J Siegel

Assistant Secretary


08/28/2019

Attachments

Back to Top