FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
74422
Service:
DTV
Call Sign:
WTEN
Channel:
24 (UHF)
File Number:
0000028761
FRN:
0009961889
Date Submitted:
08/15/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

NEXSTAR BROADCASTING , INC.

Elizabeth Ryder

545 E. John Carpenter Freeway

Suite 700

Irving, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Elizabeth Ryder

General Counsel

Nexstar Broadcasting, Inc.

Elizabeth Ryder

545 E. John Carpenter Freeway

Suite 700

Irving, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan Replace transmitter and transmission line using existing antenna (see attached sweep for main transmission line replacement justification).

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Sigma
Year 2007
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 42 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model THU9EVO-30
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 46 kW
Justification for New Transmitter The manufacturer of the existing IOT transmitter advises that the transmitter cannot be re-tuned to the assigned channel. A new Comark Paragon MSDC IOT transmitter is the price used for a replacement. See attachment.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 100.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 15 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Additional Interior RF System

Interior RF System Existing Transmitter to Interim Transmission line

Mezzanine Construction for Ancillary Equipment and Combiners

There is not enough floor space in the Transmitter area to house ancillary equipment and floor mounted combiners.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 2
Number of Panels 60
Design power capacity in use 100.0 %
Lower Limit 470.00 MHz
Upper Limit 692.00 MHz
Other Antenna Type N/A
ERP: 700.0 kW
Manufacturer Dielectric
Model TUD-05-12/60H-1-B
Year 2007

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
73263 WMHT

Primary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? Yes

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 3
Frequencies of channels supported RF channel
Frequency N/A

Enter a list of RF channel numbers.

RF Channel Number
22
24
25

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Rigging

Rigging to replace elbow complex; assist with tuning; replace main transmission line; install interim antenna and interim transmission line.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 700.0 kW
Manufacturer
Model TFU-24WB C160
Year 2018
Justification for New Antenna New full-power interim antenna and interim transmission line is required while new transmission line is replaced and new elbow complex installed and tuned for main antenna.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? S
Feed Line Size 6 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 500 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
73263 WMHT

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 500 feet per run
Justification for New Transmission Line See attached sweep test. Main transmission line measures well on pre-auction channel but does not measure well on post-auction channel.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 6 1/8 inches
Segment Length 20'
Other Segment Length
Number of parallel runs 1
Length 395 feet per run
Justification for New Transmission Line Interim transmission line required for interim operation while main transmission line is replaced and elbow complex is replaced and tuned.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) No
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? No
ASR Number
Coordinates (NAD83) Latitude (NAD83) 42° 37' 31.3" N-
Longitude (NAD83) 074° 00' 36.7" W-
Overall Structure Height 499.01 feet
Support Structure Height 495.07 feet
Ground Elevation Above Mean Sea Level (AMSL) 1780.82 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner Capital Region Broadcasters, LLC
Date Constructed 05/31/2002


Other Types of Users

Users
WNYT
WCWN
WMHT
WXXA

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 300
Explanation Schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399. Station does not have available personnel or personnel trained in project management for such complex projects. Internal accounting and Project management.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service Yes
Number of Days 9
Justification It will be necessary to survey the site, plan the equipment, develop specifications for purchasing, and oversee multiple vendor RF projects. Station does not have available personnel or personnel trained in such services.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,771,000.00 $1,081,320.00 N/A $991,240.00 N/A
Total for all systems $2,771,625.00 $1,712,605.00 N/A $1,246,241.08 N/A
Primary Transmitter THU9EVO-30 $1,771,000.00 $1,081,320.00 $991,240.00
Mezzanine Construction for Ancillary Equipment and Combiners $22,000.00 $22,000.00 N/A N/A N/A
Additional Interior RF System $140,000.00 $140,000.00 N/A $94,490.00 N/A
15 Ton system $55,800.00 $17,670.00 Catalog cost for 15 ton HVAC system is $53,000. Cost shall be divided by 3 between the following 3 stations that share the main antenna and line: WTEN, WMHT and WCWN. N/A N/A
3" Rigid Conduit and Wiring (Cost per foot) $5,200.00 $4,900.00 N/A N/A N/A
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW $1,473,000.00 $825,450.00 Maximum reimbursement is based on the price of a 2 tube IOT since the catalog price is greater than the IOT price. Cost reduced to $825,450 per Rohde & Schwarz quote 143942.2. $825,450.00 N/A
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A $36,300.00 N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $35,000.00 N/A $35,000.00 N/A

Components

Actual Information Description File Name
Mezzanine Construction for Ancillary Equipment and Combiners Information not provided.
Additional Interior RF System

Component Description:
Electrical services and transmitter installation, installment #1
Amount:
$47,245.00

Component Description:
Electrical services and transmitter installation, installment #2
Amount:
$47,245.00
15 Ton system Information not provided.
3" Rigid Conduit and Wiring (Cost per foot) Information not provided.
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW

Component Description:
Transmitter, installment #1, less upgrade cost
Amount:
$206,362.50

Component Description:
Transmitter, installment #2, less upgrade cost
Amount:
$536,542.50

Component Description:
Transmitter, installment #3, less upgrade cost
Amount:
$82,545.00
Switchgear - industrial 800 amp

Component Description:
Electrical services and transmitter installation, installment #1
Amount:
$18,150.00

Component Description:
Electrical services and antenna installation, installment #2
Amount:
$18,150.00
Transformer 3 phase/480v - 300 KVA

Component Description:
Electrical services and transmitter installation, installment #1
Amount:
$17,500.00

Component Description:
Electrical services and transmitter installation, installment #2
Amount:
$17,500.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $321,105.00 $270,355.00 N/A $153,180.00 N/A
Total for all systems $2,771,625.00 $1,712,605.00 N/A $1,246,241.08 N/A
Interim Antenna TFU-24WB C160 $197,890.00 $195,550.00 $153,180.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,000.00 N/A $17,775.00 N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $11,700.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A
UHF - High Power, Side Mount, basic slot antenna, 700 kW input, directional,, horizontally polarized $150,450.00 $150,450.00 Initial cost revised down from 235000 to 150450 based on Dielectric quote 800053CMZ-2 attached. $135,405.00 N/A
Primary Antenna TUD-05-12/60H-1-B $123,215.00 $74,805.00 $0.00
Rigging $13,335.00 $13,335.00 Catalog cost for rigging is $40,000. Cost shall be divided by 3 between the following three stations that share the main top-mount antenna: WTEN, WMHT and WCWN. N/A N/A
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) $18,950.00 $6,000.00 Catalog cost for elbow complex is $18,000. Cost shall be divided by 3 between the following three stations that share the main top-mount antenna: WTEN, WMHT and WCWN. N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $53,335.00 Catalog cost for one combiner is $80,000. Two combiners are required due to 1st adjacent channels. Cost shall be divided by 3 between the following 3 stations that share the main antenna and line: WTEN, WMHT and WCWN. $0.00 N/A
Sweep test of existing antenna $6,730.00 $2,135.00 Catalog cost for sweep test is $6,400. Cost shall be divided by 3 between the following three stations that share the main top-mount antenna and line: WTEN, WMHT and WCWN. N/A N/A

Components

Actual Information Description File Name
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
Mounting bracket, line 2 of invoice, installment #1
Amount:
$8,887.50

Component Description:
Mounting bracket, installment #2, line 2 of invoice
Amount:
$8,887.50
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) Information not provided.
Sweep test of existing antenna Information not provided.
UHF - High Power, Side Mount, basic slot antenna, 700 kW input, directional,, horizontally polarized

Component Description:
Aux antenna, installment #2, line 1 of invoice
Amount:
$67,702.50

Component Description:
Antenna component, line 1 of invoice, installment #1
Amount:
$67,702.50
Rigging Information not provided.
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) Information not provided.
New combiner, cost per channel (without antenna) Information not provided.
Sweep test of existing antenna Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $279,290.00 $139,010.00 N/A $60,086.88 N/A
Total for all systems $2,771,625.00 $1,712,605.00 N/A $1,246,241.08 N/A
Interim Transmission Line $79,790.00 $75,840.00 $60,086.88
Rigid Transmission Line - copper, 6 1/8" $79,790.00 $75,840.00 N/A $60,086.88 N/A
Primary Transmission Line $199,500.00 $63,170.00 $0.00
Rigid Transmission Line - copper, 8 3/16" broadband $199,500.00 $63,170.00 Catalog cost for main transmission line is $189,500. Cost shall be divided by 3 between the following 3 stations that share the main antenna and line: WTEN, WMHT and WCWN. N/A N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Transmission line, installment #2, line 3 of invoice
Amount:
$26,950.14

Component Description:
Other transmission line component, line 7 of invoice, installment #1
Amount:
$3,093.30

Component Description:
Rigid transmission line, line 3 of invoice, installment #1
Amount:
$26,950.14

Component Description:
Other T/L, installment #2, line 7 of invoice
Amount:
$3,093.30
Rigid Transmission Line - copper, 8 3/16" broadband Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $254,800.00 $80,670.00 N/A $0.00 N/A
Total for all systems $2,771,625.00 $1,712,605.00 N/A $1,246,241.08 N/A
Primary Tower GTOWER $254,800.00 $80,670.00 $0.00
Structural engineering tower load study for well documented tower $12,600.00 $4,000.00 Catalog cost for Structural engineering tower load study for a well documented tower is $12,000. Cost shall be divided by 3 between the following 3 stations that share the main antenna and line: WTEN, WMHT and WCWN. All Phase 4 stations. N/A N/A
Short Tower (less than 500') $84,200.00 $26,670.00 Catalog cost for tower equipment and rigging for a tower less than 500 feet s $80,000. Cost shall be divided by 3 between the following 3 stations that share the main antenna and line: WTEN, WMHT and WCWN. All Phase 4 stations. N/A N/A
Minor tower reinforcement/modifications $158,000.00 $50,000.00 Catalog cost for Minor tower reinforcement and modifications is $150,000. Cost shall be divided by 3 between the following 3 stations that share the main antenna and line: WTEN, WMHT and WCWN. All Phase 4 stations. N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $90,380.00 $86,750.00 N/A $41,734.20 N/A
Total for all systems $2,771,625.00 $1,712,605.00 N/A $1,246,241.08 N/A
Outside Professional Services $90,380.00 $86,750.00 $41,734.20
Additional Field Engineering Service, 9 Days $18,000.00 $18,000.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $3,000.00 N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $2,500.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $7,000.00 N/A
Project management of the transition $47,400.00 $45,000.00 N/A $29,234.20 N/A

Components

Actual Information Description File Name
Additional Field Engineering Service, 9 Days Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Prepare engineering section, item 4 from invoice summary
Amount:
$3,000.00
Prepare and or review reimbursement form

Component Description:
Prepare reimbursement form, item 2 from invoice summary
Amount:
$2,500.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Perform engineering study for new channel assignment and antenna development

Component Description:
Perform engineering study, item 3 from invoice summary
Amount:
$7,000.00
Project management of the transition

Component Description:
Project management services March 2019
Amount:
$113.75

Component Description:
Project management services May 2019
Amount:
$200.00

Component Description:
Project management services Jan 2019
Amount:
$180.00

Component Description:
Project management services February 2019
Amount:
$84.50

Component Description:
Osborn time for project management and consultant fee reimbursement (for Kessler & Gehman Associates, their related invoice to Osborn attached)
Amount:
$2,100.00

Component Description:
Project management services January 2019
Amount:
$65.00

Component Description:
Project management services 5.26.18 through 6.29.18
Amount:
$750.00

Component Description:
Project management services 2.1.19 through 3.1.19
Amount:
$450.00

Component Description:
Project management services 1.1.19 through 1.31.19
Amount:
$1,725.00

Component Description:
Project management services 7.28.18 through 9.28.18
Amount:
$525.00

Component Description:
Project management services 6.1.19 through 6.28.19
Amount:
$5,262.55

Component Description:
Project management services 3.30.19 to 4.26.19
Amount:
$1,275.00

Component Description:
Project management services 4.27.19 through 5.31.19
Amount:
$2,625.40

Component Description:
Project management services 12.1.18 through 12.31.18
Amount:
$525.00

Component Description:
Prepare FCC Schedule 387, item 6 from invoice summary
Amount:
$150.00

Component Description:
Vendor has issued a revised invoice
Amount:
($13,500.00)

Component Description:
Project management services 5/27/17 to 6/30/17 including consultant Kessler & Gehman Associates with their invoice attached.
Amount:
$13,500.00

Component Description:
Project management services 1/1/18 to 1/26/18
Amount:
$525.00

Component Description:
Project management services 10/27/17 to 12/31/17
Amount:
$1,650.00

Component Description:
Project management, item 1 from invoice summary
Amount:
$4,725.00

Component Description:
Project management services 3.2.19 through 3.29.19
Amount:
$450.00

Component Description:
Project management services 9.29.18 through 10.26.18
Amount:
$450.00

Component Description:
Project Management Services Aug 2018
Amount:
$75.00

Component Description:
Project management services 6.30.18 through 7.27.18
Amount:
$675.00

Component Description:
Project management services, item 7 from invoice summary
Amount:
$2,403.00

Component Description:
Project management services Dec 2018
Amount:
$75.00

Component Description:
Project management services 10.27.18 through 11.30.18
Amount:
$1,875.00

Component Description:
Prepare FCC Schedule 387, item 5 from invoice summary
Amount:
$300.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $55,050.00 $54,500.00 N/A $0.00 N/A
Total for all systems $2,771,625.00 $1,712,605.00 N/A $1,246,241.08 N/A
Other Expenses $55,050.00 $54,500.00 $0.00
Develop and air announcement of upcoming channel change $3,500.00 $3,500.00 N/A N/A N/A
Equipment Storage $9,000.00 $9,000.00 N/A N/A N/A
Equipment Delivery and Handling Charges $10,000.00 $10,000.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $9,000.00 $9,000.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A N/A N/A
Non-zoning permits $10,000.00 $10,000.00 N/A N/A N/A
MVPD Notification of Channel Change $2,000.00 $2,000.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,771,625.00 $1,712,605.00 $1,246,241.08

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


08/15/2019

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


08/15/2019

Attachments