Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Station will install interim antenna and line. Station will replace side mounted antenna and line station will replace main transmitter. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | No | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Innovator-HX HU500AD | |
Year | 2007 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-5XU-46D-C | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 5 kW | |
Justification for New Transmitter | The current 5kW Axcera transmitter can't be retuned. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 50.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | Broadband Slot | |
ERP: | 179.0 kW | |
Manufacturer | ||
Model | RD320M-596650H7S07 | |
Year | 2005 |
Facility ID | Call Sign |
---|---|
55031 | KJTV-TV |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | Yes | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 3 | |
Number of Panels/Bays | 16 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 650.00 MHz | |
Design power capacity in use | 75.0 % | |
Other Antenna Type | N/A | |
ERP: | 127.0 kW | |
Manufacturer | ||
Model | PHPR48U3313 | |
Year | 2017 | |
Justification for New Antenna | Existing antenna can not be retuned |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 3 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
43 |
23 |
35 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | Yes | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 29.4 kW | |
Manufacturer | ||
Model | STA16-HP | |
Year | 2017 | |
Justification for New Antenna | Interim Broadcast Facility |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | Yes | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 7 3/16 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
24 |
35 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Segment Length | 20' | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 900 feet per run | |
Justification for New Transmission Line | Line needed for interim broadcast |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1248244 | |
Coordinates (NAD83) | Latitude (NAD83) | 33° 30' 08.3" N- |
Longitude (NAD83) | 101° 52' 21.3" W- | |
Overall Structure Height | 950.12 feet | |
Support Structure Height | 944.87 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 3206.98 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | FLP Ramar, Ltd. | |
Date Constructed | 12/08/2006 |
Facility ID | Call Sign | Service |
---|---|---|
4019 | KXTQ-FM | FM |
168090 | KJTV-CD | DTV |
55031 | KJTV-TV | DTV |
88795 | KLZK-FM | FM |
54684 | KTTU-FM | FM |
55062 | KLBB-FM | FM |
55055 | KXTQ-CD | DTV |
Users |
---|
KLBB-LP |
K226CH |
K245BG |
K249DU |
KLBB-LD |
K264AN |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Serious Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Modifications |
Modification of tower to accommodate antenna installation modification from side mount to top mount. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Number of Hours | N/A | |
Explanation | N/A | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 7 | |
Justification | Field study needed due to tower modification, |
Name | Description |
---|---|
TWR Lighting Inc |
New lighting system for modified tower. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Sweep test-new interim antenna |
Sweep test of the new interim antenna |
Equipment Storage |
Rental of '40 Steel container to be used to store equipment and materials in a dry secure place. Approximate rental period will be eight months. |
Installation-Tower Lighting System |
Installation of new tower lighting system previously not included in tower work by Houston Tower |
Material Handling |
Rental of fork lift in order to organize and store materials for tower work |
Security Fencing |
Chain link fencing with 3 strands of barbed wire to secure transmitter building area to include approximately 100k sq ft (300' x 350'). Area will be used to secure equipment and materials during tower work. |
Sweep test-new primary antenna |
Sweep test of the new primary antenna |
Copper strapping to ground |
4" Copper strapping for grounding of primary transmitter |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $274,600.00 | $186,118.00 | N/A | $149,868.40 | N/A |
Total for all systems | $2,815,532.60 | $2,690,933.10 | N/A | $2,173,397.85 | N/A |
Primary Transmitter TRN-5XU-46D-C | $274,600.00 | $186,118.00 | $149,868.40 | ||
2" Rigid Conduit and Wiring (Cost per foot) | $1,300.00 | $1,250.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 4 - 6 kW | $236,500.00 | $149,868.00 | Existing transmitter can not be retuned. | $149,868.40 | Shipping is included |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $35,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
UHF - Air Cooled Solid State Transmitter 4 - 6 kW | |
Transformer 3 phase/480v - 300 KVA | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $720,922.60 | $645,342.60 | N/A | $445,238.71 | N/A |
Total for all systems | $2,815,532.60 | $2,690,933.10 | N/A | $2,173,397.85 | N/A |
Interim Antenna STA16-HP | $305,840.00 | $235,050.00 | $98,730.56 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $0.00 | N/A | N/A | N/A |
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | $16,850.00 | $16,000.00 | N/A | $7,120.56 | N/A |
Combiner output splitting/switching for dual feed lines, if applicable | $126,000.00 | $120,000.00 | N/A | N/A | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $44,000.00 | N/A | $44,705.00 | RFS estimate one year ago was adjusted to actual with minimal price difference and within allowable cost. |
UHF - High Power, Side Mount, basic slot antenna, 29 kW input, horizontally polarized | $43,650.00 | $43,650.00 | N/A | $43,650.00 | RFS Proposal calls for 4 installment payments. Invoice 27010642 is installment #1 |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $3,255.00 | N/A |
Primary Antenna PHPR48U3313 | $415,082.60 | $410,292.60 | $346,508.15 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $80,000.00 | N/A | $56,018.75 | N/A |
UHF - High Power Top Mount Three Station broadband panel antenna horizontally polarized | $318,892.60 | $318,892.60 | Invoice was split between side-mount antenna and top-mount antenna. Side-mount estimate was reduced and top-mount was increased. Also, it appears the shipping and tax was not considered in the initial estimates. | $290,489.40 | Proposals require 4 installment payments, this request equals the first of 4.The proposals are attached for your review. |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | |
Combiner output splitting/switching for dual feed lines, if applicable | Information not provided. |
New combiner, cost per channel (without antenna) | |
UHF - High Power, Side Mount, basic slot antenna, 29 kW input, horizontally polarized | |
Sweep test of existing antenna | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
New combiner, cost per channel (without antenna) | |
UHF - High Power Top Mount Three Station broadband panel antenna horizontally polarized | |
Sweep test of existing antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $261,000.00 | $395,000.00 | N/A | $383,865.21 | N/A |
Total for all systems | $2,815,532.60 | $2,690,933.10 | N/A | $2,173,397.85 | N/A |
Interim Transmission Line | $261,000.00 | $395,000.00 | $383,865.21 | ||
Rigid Transmission Line - copper, 7 3/16" | $261,000.00 | $395,000.00 | Line needed to accommodate 1000Ft, quote attached Update: Estimate changed to reflect actual costs incurred to complete transmission line assembly. Required parts become very specific and customized in order to finalize the project. | $383,865.21 | Please see attached for MYAT invoice for $295,328 actual cost. |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 7 3/16" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,288,800.00 | $1,210,000.00 | N/A | $1,109,562.70 | N/A |
Total for all systems | $2,815,532.60 | $2,690,933.10 | N/A | $2,173,397.85 | N/A |
Primary Tower TOWER | $1,288,800.00 | $1,210,000.00 | $1,109,562.70 | ||
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $25,000.00 | N/A | $12,500.00 | N/A |
Serious tower reinforcement/modifications | $1,052,000.00 | $985,000.00 | Vendor is Houston's Tower Service. Written justification is attached along with updated PO, estimate and invoice. | $985,000.00 | N/A |
Tower Modifications | $0.00 | $0.00 | N/A | N/A | N/A |
Tall Tower (greater than 500') | $210,500.00 | $200,000.00 | N/A | $112,062.70 | N/A |
Actual Information Description | File Name |
---|---|
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Serious tower reinforcement/modifications | |
Tower Modifications | Information not provided. |
Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $185,065.00 | $178,562.50 | N/A | $35,689.07 | N/A |
Total for all systems | $2,815,532.60 | $2,690,933.10 | N/A | $2,173,397.85 | N/A |
Outside Professional Services | $185,065.00 | $178,562.50 | $35,689.07 | ||
TWR Lighting Inc | $22,000.00 | $22,000.00 | Anticipated costs were higher than previously expected Revised estimate #2 was the result of mounting brackets not included in the original quote-$1,200 | $21,664.07 | N/A |
Additional Field Engineering Service, 7 Days | $15,000.00 | $15,000.00 | N/A | N/A | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,687.50 | Predetermined cost slightly underestimated. Estimated cost = invoice total | $2,000.00 | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,625.00 | Predetermined cost slightly underestimated. Estimated cost = invoice total | $2,000.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $0.00 | Comprehensive legal services regarding form 399 |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | $2,825.00 | Consulting engineer invoiced for both primary and Aux services on one invoice, total services do not exceed allowed amount |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $7,200.00 | Multiple engineering consulting services were required, |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
TWR Lighting Inc | |
Additional Field Engineering Service, 7 Days | Information not provided. |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | |
ASR modification (prepare FCC Form 854) | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $85,145.00 | $75,910.00 | N/A | $49,173.76 | N/A |
Total for all systems | $2,815,532.60 | $2,690,933.10 | N/A | $2,173,397.85 | N/A |
Other Expenses | $85,145.00 | $75,910.00 | $49,173.76 | ||
Copper strapping to ground | $1,600.00 | $1,600.00 | N/A | $1,555.21 | N/A |
Sweep test-new primary antenna | $1,500.00 | $1,500.00 | N/A | N/A | N/A |
Security Fencing | $25,000.00 | $25,000.00 | Approximately 100k sq. ft. of secured space (300' x 350') surrounding the transmitter building to store equipment and materials when delivered. | $24,556.00 | N/A |
Material Handling | $500.00 | $500.00 | Rental of fork lift to move and store material for tower project (invoice attached) | N/A | N/A |
Installation-Tower Lighting System | $17,000.00 | $17,000.00 | Installation of new tower lighting system previously not included in tower work | $16,237.50 | N/A |
Equipment Storage | $2,000.00 | $2,000.00 | 40' steel container to be used to store and secure items during tower work-Estimated 8-10 months | $1,441.05 | N/A |
Sweep test-new interim antenna | $1,300.00 | $1,300.00 | N/A | $1,299.00 | N/A |
MVPD Notification of Channel Change | $2,000.00 | $2,000.00 | N/A | $1,765.00 | N/A |
Develop and air announcement of upcoming channel change | $1,500.00 | $1,500.00 | N/A | N/A | N/A |
Equipment Storage | $2,000.00 | $2,000.00 | N/A | $0.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $2,320.00 | N/A | $2,320.00 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $9,000.00 | $9,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Copper strapping to ground | |
Sweep test-new primary antenna | Information not provided. |
Security Fencing | |
Material Handling | Information not provided. |
Installation-Tower Lighting System | |
Equipment Storage | |
Sweep test-new interim antenna | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
DTV Medical Facility Notification | |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Equipment Delivery and Handling Charges | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,815,532.60 | $2,690,933.10 | $2,173,397.85 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Keith Kerr CFO 07/01/2019 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Keith Kerr CFO 07/01/2019 |