Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
60555
Service:
DTV
Call Sign:
WFUT-DT
Channel:
30 (UHF)
File Number:
0000028637
FRN:
0005414917
Date Submitted:
07/08/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

UNIVISION NEW YORK LLC

Doing Business As: UNIVISION NEW YORK LLC

Christopher G. Wood

5999 CENTER DRIVE

LOS ANGELES, CA 90045

United States

+1 (310) 348-3600 CWOOD@UNIVISION.NET Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Theodore Stoner

VP Distribution Technology Strategy

Univision Management Company

Theodore Stoner

9405 NW 41st Street

Miami, FL 33178

United States

+1 (513) 608-0308 tstoner@univision.net

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan See attached explanation

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Retune Existing
Use Primary (Main)
Ownership Owned
Owner N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer Rohde & Schwarz
Model NV8620
Year 2009
Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 16.5 kW

Primary Transmitter

Back to Top

Retuning Transmitter Costs

Section Question Response
New IOT Tubes Number of Tubes (including accessories) needed N/A
New Mask Filter
Power 30 kW
Other Power N/A
New Exciter Is a new exciter needed? No

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 2600.0
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Auxiliary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Retune Existing
Use Auxiliary (Backup)
Ownership Owned
Owner N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer Rohde & Schwarz
Model NV8608
Year 2009
Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 7 kW

Auxiliary Transmitter

Back to Top

Retuning Transmitter Costs

Section Question Response
New IOT Tubes Number of Tubes (including accessories) needed N/A
New Mask Filter
Power 7 kW
Other Power N/A
New Exciter Is a new exciter needed? No

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Auxiliary (Backup)
Description of Use Emergency, maintenance, and temporary
Ownership Leased
Owner 4TS LLC
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Middle
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 2
Number of Panels 64
Design power capacity in use 25.0 %
Lower Limit 530.00 MHz
Upper Limit 674.00 MHz
Other Antenna Type N/A
ERP: 80.0 kW
Manufacturer Dielectric
Model TUA-08-8/64U-2-B
Year 2003

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
6048 WNYE-TV

Auxiliary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? No

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type Additional Module
Number of channels supported 2
Frequencies of channels supported RF channel
Frequency N/A

Enter a list of RF channel numbers.

RF Channel Number
24
26

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 200.0 kW
Manufacturer
Model AL12-30-PM
Year 2008

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 155.0 kW
Manufacturer
Model TFU-16JSC/VP-R CT150
Year 2018
Justification for New Antenna Existing single-channel antenna incapable of operation on newly assigned channel.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Rent Temporary
Ownership Leased
Owner Empire State Realty Trust
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Broadband Panel
Number of Stations Supported 4
Number of Panels/Bays 32
Lower Limit 488.00 MHz
Upper Limit 758.00 MHz
Design power capacity in use 50.0 %
Other Antenna Type N/A
ERP: 90.0 kW
Manufacturer
Model ESBTUF80
Year 2008
Justification for New Antenna Maintain continuity of operation while upper tower is reconfigured, which requires removal of existing WFUT-DT antenna

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type Additional Module
Number of channels supported 4
Frequencies of channels supported RF channel
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Enter a list of RF channel numbers.

RF Channel Number
38
28
30
33

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Auxiliary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Auxiliary (Backup)
Description of Use Emergency, maintenance, and temporary
Ownership Leased
Owner 4TS LLC
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 380 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
6048 WNYE-TV

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 4 1/16 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 340 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 340 feet per run
Justification for New Transmission Line Existing line has excessive loss for dual-channel operation.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 6 1/8 inches
Segment Length 19 ½ '
Other Segment Length
Number of parallel runs 1
Length 250 feet per run
Justification for New Transmission Line Connect 79th floor transmitter to combiner system on 85th floor to maintain continuity of operation during antenna change.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Auxiliary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Move Equipment
Tower Use Auxiliary (Backup)
Description of Use Emergency, maintenance, and temporary
Ownership Leased
Is this tower consider Complex? Located on Building
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1238745
Coordinates (NAD83) Latitude (NAD83) 40° 45' 22.4" N-
Longitude (NAD83) 073° 59' 10.5" W-
Overall Structure Height 1147.30 feet
Support Structure Height 1076.76 feet
Ground Elevation Above Mean Sea Level (AMSL) 49.87 feet
Structure Type BTWR - Building with Tower
Tower Owner 4 TS II LLC
Date Constructed 10/01/2014

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
59953 WHTZ FM
6373 WWPR-FM FM
86537 WJLP DTV
74215 WXTV-DT DTV
46978 WQXR-FM FM
6048 WNYE-TV DTV
3539 WNYE FM
61641 WSKQ-FM FM
48699 WBGO FM
6595 WKTU FM
29022 WXNY-FM FM
23004 WAXQ FM
1328 WABC-TV DTV
51663 WPAT-FM FM
68270 WKCR-FM FM
56571 WLTW FM
73355 WNYC-FM FM

Other Types of Users

Users
WASA-LD
W292DV
W220EJ
WFMU-FM1

Auxiliary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Located on Building
Helicopter Services Required Are helicopter services required? No

Auxiliary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? Located on Building
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1007048
Coordinates (NAD83) Latitude (NAD83) 40° 44' 54.0" N-
Longitude (NAD83) 073° 59' 09.0" W-
Overall Structure Height 1453.39 feet
Support Structure Height 1249.98 feet
Ground Elevation Above Mean Sea Level (AMSL) 50.85 feet
Structure Type B - Building
Tower Owner EMPIRE STATE BUILDING COMPANY
Date Constructed 01/01/1931

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
43952 WMBC-TV DTV
46978 WQXR-FM FM
74215 WXTV-DT DTV
1328 WABC-TV DTV
28203 WBLS FM
6373 WWPR-FM FM
56571 WLTW FM
67866 WEBR-CD DTV
18795 WNET DTV
9610 WCBS-TV DTV
23004 WAXQ FM
47535 WNBC DTV
63781 WEPN-FM FM
73356 WPXN-TV DTV
6595 WKTU FM
61641 WSKQ-FM FM
73333 WNJU DTV
74197 WWOR-TV DTV
67846 WFAN-FM FM
58579 WBMP FM
168834 WDVB-CD DTV
29022 WXNY-FM FM
25442 WNEW-FM FM
73887 WPLJ FM
19615 WQHT FM
59953 WHTZ FM
73881 WPIX DTV
9611 WCBS-FM FM
73355 WNYC-FM FM
51249 WBAI FM
22206 WNYW DTV

Other Types of Users

Users
WPXO-LD

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Located on Building
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Site Safety

Safety inspector, engineering, RF safety, security guards, elevator operator

ESRT TRP tower modification Part 1

Half of ESRT actual costs shown on line 29 of attached list

ESRT TRP tower modification Part 2

Half of ESRT actual costs shown on line 29 of attached list

Sidewalk Sheds, General Construction

General contractor, laborers, sidewalk sheds, temporary protection

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 1286
Explanation Antenna project conducted and managed by ESRT, price noted separately; hours noted are for management of transmitter and interior transmission line installation; station is staffed to handle routine operation & maintenance only, not construction.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers No
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? No
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? No
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? No
Does this relocation require MVPD Notification of a Channel Change? No

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

FM Aux Antenna Installation

Installation of FM auxiliary antenna and combiner system for continuity of FM station operation during TV antenna replacements

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $391,710.00 $293,150.00 N/A $625.00 N/A
Total for all systems $37,829,215.00 $45,076,360.50 N/A $14,157,397.21 N/A
Primary Transmitter NV8620 $280,300.00 $241,000.00 $625.00
Other -- Building Addition Size: 2600.0 $142,500.00 $142,500.00 Combiner room supporting facilities modification costs per attached ESRT June cost estimate spreadsheet, $570,000 sum of lines 13, 15, and 18, divided by 4 (one station instead of the 4 assumed in June) $625.00 N/A
30 kW mask filter $32,600.00 $31,000.00 N/A N/A N/A
UHF and VHF - minor banding issues $105,200.00 $67,500.00 N/A N/A N/A
Auxiliary Transmitter NV8608 $111,410.00 $52,150.00 $0.00
UHF and VHF - minor banding issues $105,200.00 $32,000.00 N/A N/A N/A
7 kW mask filter $6,210.00 $20,150.00 See attached RFS quote for 7.5 kW filter for sister station KFTV-DT N/A N/A

Components

Actual Information Description File Name
Other -- Building Addition Size: 2600.0

Component Description:
1st Primary Transmitter - Building Addition, 2600 Sq. Ft.
Amount:
$625.00
30 kW mask filter Information not provided.
UHF and VHF - minor banding issues Information not provided.
UHF and VHF - minor banding issues Information not provided.
7 kW mask filter Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,284,400.00 $609,274.00 N/A $97,553.60 N/A
Total for all systems $37,829,215.00 $45,076,360.50 N/A $14,157,397.21 N/A
Interim Antenna ESBTUF80 $206,430.00 $196,400.00 $34,303.60
UHF - High Power, Side Mount, broadband panel, 32 bay,, 90 kW input, elliptically or circularly polarized $0.00 $0.00 No changes to existing antenna N/A N/A
Adding a module to existing combiner (without antenna) $84,200.00 $80,000.00 N/A $29,933.60 N/A
Interim antenna rental and installation - Cost will depend on antenna size and height and/or complexity of tower. $115,500.00 $110,000.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $4,370.00 N/A
Primary Antenna TFU-16JSC/VP-R CT150 $440,040.00 $326,474.00 $63,250.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,250.00 per Dielectric Quote 700444CMZ $5,250.00 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $20,320.00 Dielectric Quote 900046CMZ N/A N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $11,424.00 Dielectric Quote 900046CMZ N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A
UHF - Lower Power Side Mount, One Station antenna . medium power (50-200 kW), elliptically or circularly polarized $103,100.00 $240,080.00 Dielectric Quote 900046CMZ $15,000.00 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $43,000.00 ***System Notice: Estimate adjusted and locked because line has been superseded.***Horizontally-polarized, medium power antenna from Catalog of Costs, based on ERP and existing antenna power rating $43,000.00 x
Auxiliary Antenna TUA-08-8/64U-2-B $637,930.00 $86,400.00 $0.00
Adding a module to existing combiner (without antenna) $84,200.00 $80,000.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, horizontally polarized $547,000.00 $0.00 No antenna changes N/A N/A

Components

Actual Information Description File Name
UHF - High Power, Side Mount, broadband panel, 32 bay,, 90 kW input, elliptically or circularly polarized Information not provided.
Adding a module to existing combiner (without antenna)

Component Description:
Initial payment - 20% start-up WFUT-UHF combiner installation - Empire State Building Facility
Amount:
$29,933.60
Interim antenna rental and installation - Cost will depend on antenna size and height and/or complexity of tower. Information not provided.
Sweep test of existing antenna

Component Description:
Professional service to support RF Sweep Testing/Tuning for WFUT on 84th Fl.
Amount:
$2,180.00

Component Description:
Furnished Labor and materials to assist Univision Representative(s) with the RF Sweep and Testing of Existing Transmission Lines
Amount:
$2,190.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost)

Component Description:
ANTENNA - SCATTER STUDY
Amount:
$5,250.00
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) Information not provided.
Sweep test of existing antenna Information not provided.
UHF - Lower Power Side Mount, One Station antenna . medium power (50-200 kW), elliptically or circularly polarized

Component Description:
Top Mount, Side Mount
Amount:
$15,000.00
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
Top mount and Side Mount
Amount:
$15,750.00

Component Description:
Top mount and side mount
Amount:
$11,250.00

Component Description:
Top mount and Side mount
Amount:
$16,000.00
Adding a module to existing combiner (without antenna) Information not provided.
Sweep test of existing antenna Information not provided.
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, horizontally polarized Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $129,380.00 $123,140.00 N/A $22,670.00 N/A
Total for all systems $37,829,215.00 $45,076,360.50 N/A $14,157,397.21 N/A
Interim Transmission Line $50,500.00 $48,000.00 $22,670.00
Rigid Transmission Line - copper, 6 1/8" $50,500.00 $48,000.00 N/A $22,670.00 N/A
Primary Transmission Line $78,880.00 $75,140.00 $0.00
Rigid Transmission Line - copper, 6 1/8" broadband $78,880.00 $75,140.00 N/A N/A N/A
Auxiliary Transmission Line $0.00 $0.00 $0.00

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 6 1/8"

Component Description:
REDUCER STEP TYPE, TRANSFORMER ASSY.
Amount:
$9,480.00

Component Description:
Engineering Services; Transmission line sweep analysis for FCC repack.
Amount:
$4,610.00

Component Description:
Interim Transmission Line
Amount:
$8,580.00
Rigid Transmission Line - copper, 6 1/8" broadband Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $26,420,383.00 $33,014,957.00 N/A $13,748,006.70 N/A
Total for all systems $37,829,215.00 $45,076,360.50 N/A $14,157,397.21 N/A
Auxiliary Tower BTWR $421,000.00 $0.00 $0.00
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $0.00 No tower modification required N/A N/A
Primary Tower B $25,999,383.00 $33,014,957.00 $13,748,006.70
Serious tower reinforcement/modifications $1,052,000.00 $4,338,521.00 ESRT TRP actual cost $307,750 per line 24 of attached cost list, plus 1/3 of difference between attached ESRT June estimate ($29,314,366, lines 69,72,73,77&78) and TRP actual costs of $17,222,054 (1 antenna instead of the 3 assumed in the estimate) $3,491,169.27 N/A
ESRT TRP tower modification Part 1 $8,457,152.00 $8,457,152.00 Half of line 29 of attached ESRT cost list, for structural analysis and building/tower reinforcement (due to $10M/line limit) $5,403,699.57 N/A
Structural engineering tower load study for well documented tower $12,600.00 $829,320.00 ESRT TRP actual costs $739,320 per lines 12-15 & 23 of attached cost list, plus $65,000 attached Univision purchase order for WFUT structural analysis work presently underway and $25,000 per attached RWDI proposal for wind study. $310,202.30 N/A
Sidewalk Sheds, General Construction $6,811,357.00 $6,811,357.00 ESRT TRP actual costs $2,887,892 per lines 22, 28, & 30 of attached cost list, plus 1/3 of difference between ESRT June estimate ($14,658,286, lines 65-68,70,71) and TRP actual costs (1 antenna instead of the 3 assumed in the estimate) $1,326.76 N/A
ESRT TRP tower modification Part 2 $8,457,152.00 $8,457,152.00 Half of line 29 of attached ESRT cost list, for structural analysis and building/tower reinforcement (due to $10M/line limit) $4,536,483.80 N/A
Site Safety $788,122.00 $788,122.00 ESRT TRP actual costs $591,430 per lines 25-27 of attached cost list, plus 1/3 of difference between ESRT June estimate ($1,181,505, lines 74-76 & 79) and TRP actual costs (1 antenna instead of the 3 assumed in the estimate) $0.00 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $3,333,333.00 1/3 of $10,000,000 from line 90 of attached ESRT June cost estimate spreadsheet, due to 1 antenna being installed instead of the 3 assumed in the estimate. $5,125.00 N/A

Components

Actual Information Description File Name
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) Information not provided.
Serious tower reinforcement/modifications

Component Description:
Broadcasting - TRP
Amount:
$1,197.62

Component Description:
TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
Amount:
$1,126,291.37

Component Description:
TRP Phase 1B, Flagg Waterproofing and Restoration to perform water proofing work
Amount:
$63,774.00

Component Description:
TRP Phase 1
Amount:
$5,370.00

Component Description:
Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2. Mancini shall provide construction administration for the build out of the combiner room on 85.
Amount:
$570.49

Component Description:
TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
Amount:
$601,201.30

Component Description:
ACM Investigator Service of a New York City Certified Asbestos Investigator to perform an inspection related to structural work
Amount:
$375.00

Component Description:
ESB TRP Phase 1 Final Structural Design Services
Amount:
$22,000.01

Component Description:
ESP TRP Phase 1 Construction Support
Amount:
$24,306.25

Component Description:
Broadcast tower and 85th floor, FGE to furnish all labor and material to complete electrical work.
Amount:
$5,966.35

Component Description:
Tower Reconfiguration
Amount:
$4,542.07

Component Description:
Tower reconfiguration
Amount:
$10,036.81

Component Description:
MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work.
Amount:
$1,970.89

Component Description:
ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
Amount:
$4,253.61

Component Description:
ESB Tower Reconfiguration- revision of construction documents
Amount:
$12,000.00

Component Description:
TRP Phase 1
Amount:
$20,000.00

Component Description:
Preparation and filing of forms and structural letter of completion
Amount:
$1,526.00

Component Description:
TRP Phase 1b - FM Aux, Electronics Research Inc. (ERI) will furnish and install a complete FM Aux system
Amount:
$1,445,945.00

Component Description:
MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work
Amount:
$450.44

Component Description:
TRP Phase 1
Amount:
$11,627.50

Component Description:
Tower reconfiguration
Amount:
$40,766.31

Component Description:
TRP Phase 1
Amount:
$24,788.39

Component Description:
Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2. Mancini shall provide construction administration for the build out of the combiner room on 85.
Amount:
$1,755.45

Component Description:
Mancini Duffy shall prepare filing documents for Phase 1 and Phase 2. Mancini shall provide construction administration for the build out of the combiner room on 85.
Amount:
$1,891.36

Component Description:
ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
Amount:
$4,250.00

Component Description:
TRP Phase 1
Amount:
$8,988.95

Component Description:
ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
Amount:
$3,574.95

Component Description:
ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
Amount:
$4,515.00

Component Description:
Duggal to create replacement banner for State Bar and Grill to be attached on the new 33rd street side walk shed.
Amount:
$4,904.82

Component Description:
TRP Phase 1B, Flagg Waterproofing and Restoration to perform water proofing work in accordance with CRS documents SK-A
Amount:
$88,330.00

Component Description:
TRP Phase 1, EverGreene Architectural Arts shall furnish and install the current murals
Amount:
$12,286.54

Component Description:
Expedited filing services for the structural work
Amount:
$3,365.00

Component Description:
ESB Tower Reconfiguration - professional architectural and interior design services for the revision of construction documents
Amount:
$6,674.34

Component Description:
TRP Phase 1, TRP Phase 1
Amount:
$12,286.54
ESRT TRP tower modification Part 1

Component Description:
Fred Geller Electrical, Inc to perform electrical work per attached proposal
Amount:
$74,933.00

Component Description:
Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
Amount:
$1,732,219.59

Component Description:
Filing forms and structural letter of completion; inspection fee
Amount:
$2,500.00

Component Description:
PAL to conduct removal and disposal of ACPI on the 85th floor corridor.
Amount:
$3,048.50

Component Description:
Review of FM Aux antenna mounting design and details submitted by antenna manufacturer.
Amount:
$8,215.00

Component Description:
Review of FM Aux antenna mounting design and details submitted by antenna manufacturer
Amount:
$9,677.50

Component Description:
ESB TRP Phase 1 Construction Support
Amount:
$2,157.50

Component Description:
Tower Reconfiguration - Structural Design
Amount:
$77,400.00

Component Description:
Review of FM Aux antenna mounting design & details submitted by antenna manufacturer
Amount:
$4,900.00

Component Description:
Consultation re: filing
Amount:
$675.00

Component Description:
ESB TRP Phase 1 Construction Support
Amount:
$771.25

Component Description:
Review of FM Aux antenna mounting design; Combiner and AC equipment
Amount:
$4,410.00

Component Description:
TRP Logistics Planning - Thornton Tomaseti is engaged to provide construction logistics, phased engineering support, review applicable building codes as it relates to broadcast tower (222-F vs 222-G)
Amount:
$76.02

Component Description:
TRP Phase 1 , EBS shall provide testing services to determine the existence of ACM in the work areas identified by the construction documents.
Amount:
$6,635.60

Component Description:
ESB TRP2 Additional Engineering Services
Amount:
$7,499.97

Component Description:
ESB TRP2 Additional Engineering Services
Amount:
$13,500.02

Component Description:
ESB TRP Phase 1 Final Structural Design Services
Amount:
$20,499.97

Component Description:
Services as part of the FM Aux Combiner Room build out; structural analysis of ERI's FM System.
Amount:
$3,499.00

Component Description:
Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
Amount:
$1,379,584.86

Component Description:
Review of FM Aux antenna mounting design; Aux Combiner and AC equipment
Amount:
$9,807.50

Component Description:
Tower Reconfiguration - Structural Design
Amount:
$7,740.00

Component Description:
Tower Reconfiguration - Structural Design
Amount:
$77,400.00

Component Description:
TRP Phase 1a - Abatement Scaffold Engineering Filing-Updated
Amount:
$225.00

Component Description:
Broadcasting-TRP Phase 1
Amount:
$2,835.00

Component Description:
TRP Phase 1
Amount:
$51,971.25

Component Description:
Skanska shall provide structural reinforcement services as indicated by the Phase 1 structural drawings.
Amount:
$1,461,587.27

Component Description:
RF safety services
Amount:
$1,200.00

Component Description:
TT will provide construction administration services for Phase 1B of the TRP on a Not-to-Exceed basis.
Amount:
$5,467.50

Component Description:
TRP Phase 1b
Amount:
$500.00

Component Description:
TT will provide construction administration services for Phase 1B of the TRP on a Not-to-Exceed basis.
Amount:
$4,915.00

Component Description:
TRP Phase 1
Amount:
$1,665.00

Component Description:
TRP Phase 1
Amount:
$11,040.00

Component Description:
Broadcasting - TRP Phase 1, Dielectric shall provide consulting services to support the TRP project, design/develop temporary antennas.
Amount:
$9,640.00

Component Description:
RF safety services
Amount:
$1,745.81

Component Description:
A new chiller will be installed on the 81st Floor (east) setback roof.
Amount:
$12,000.00

Component Description:
TRP Phase 1
Amount:
$2,160.00

Component Description:
TRP Phase 1a
Amount:
$67,407.00

Component Description:
Consulting
Amount:
$112.50

Component Description:
"TRP Phase 1a - Abatement Scaffold Engineering Filing-Updated"
Amount:
$350.00

Component Description:
Tower Reconfiguration - Structural Design
Amount:
$9,675.00

Component Description:
TT shall provide construction admin services for phase 1 for 12 months.
Amount:
$105.27

Component Description:
Filing fee
Amount:
$102.49

Component Description:
ESB TRP2 Construction Logistics/Phasing
Amount:
$25,000.00

Component Description:
ESB TRP Phase 1 CA Service
Amount:
$811.25

Component Description:
TRP Logistics Planning
Amount:
$20,000.01

Component Description:
TT shall provide construction admin services for phase 1 for 12 months. TT services shall include submittal review, construction meetings and site visits
Amount:
$4,500.00

Component Description:
Engineering services - 50% Deposit with order
Amount:
$5,125.00

Component Description:
Code review and form filing
Amount:
$4,076.00

Component Description:
ESB TRP Phase 1 CA Services
Amount:
$22,226.25

Component Description:
Review of FM Aux antenna mounting design and details submitted by antenna manufacturer.
Amount:
$12,305.00

Component Description:
Filing fee
Amount:
$100.00

Component Description:
TRP Phase 1a - Abatement Scaffold Engineering Filing Updated
Amount:
$1,200.00

Component Description:
Review of FM Aux antenna mounting design and details submitted by antenna manufacturer.
Amount:
$4,410.00

Component Description:
TRP Phase 1b, New PO to account for ERI's new invoice
Amount:
$26,275.00

Component Description:
TRP Phase 1
Amount:
$6,240.00

Component Description:
Review of FM Aux antenna mounting design and details submitted by antenna manufacturer
Amount:
$2,450.00

Component Description:
on-site technical advisory services
Amount:
$43,890.00

Component Description:
ESB TRP Phase 1 Construction Support
Amount:
$10,108.75

Component Description:
Broadcasting-TRP Phase 1
Amount:
$1,161.00

Component Description:
A new chiller will be installed on the 81st Floor (east) setback roof.
Amount:
$4,000.00

Component Description:
Consulting re: filing status
Amount:
$112.50

Component Description:
ESB TRP Phase 1 CA Service
Amount:
$42,256.25

Component Description:
Fred Geller Electrical will be supplying a site safety officer for ERI and Skanska's wor1c on TRP lb.
Amount:
$4,600.00

Component Description:
Review of FM Aux antenna mounting design and details submitted by antenna manufacturer
Amount:
$6,220.00

Component Description:
TT shall provide construction admin services for phase 1 for 12 months.
Amount:
$35.09

Component Description:
Broadcasting-TRP Phase 1
Amount:
$2,351.00

Component Description:
Consultation re: filing status
Amount:
$900.00

Component Description:
TT shall provide construction admin services for phase 1 for 12 months. TT services shall include submittal review, construction meetings and site visits
Amount:
$16,159.28

Component Description:
TRP - Phase 1B FM Aux/Broadcast Equipment
Amount:
$3,920.00

Component Description:
construction admini services for Phase 1B, FM Aux antenna mounting design,structural support on the new FM Aux Combiner & AC equipment on 85th fl., new chillers on 81st fl. setback
Amount:
$5,932.50

Component Description:
Tower Reconfiguration - Structural Design
Amount:
$11,610.00

Component Description:
MDB to maintain sidewalk sheds as part of the TRP Phase 1b installation work
Amount:
$5,044.32

Component Description:
Abatement Scaffold Engineering Filing-Updated
Amount:
$18,826.00
Structural engineering tower load study for well documented tower

Component Description:
Structural study
Amount:
$20,000.00

Component Description:
ESB TRP2 Additional Engineering Services
Amount:
$38.23

Component Description:
services to do a full-scale windload testing of the Temporary enclosure material
Amount:
$19,600.00

Component Description:
TRP Phase 1
Amount:
$82.91

Component Description:
TT shall provide construction admin services for phase 1 for 12 months. TT services shall include submittal review, construction meetings and site visits
Amount:
$12,416.30

Component Description:
Aerodynamic Assessment of Antenna, Additional Iteration, Attendance at a Meeting in New York
Amount:
$2,700.00

Component Description:
Aerodynamic Assessment of Antenna, Additional Iteration, Additional Iteration
Amount:
$10,800.00

Component Description:
Structural Engineering Tower load study
Amount:
$19,998.00

Component Description:
TRP Phase 1
Amount:
$164.36

Component Description:
Initial Structural Design Services
Amount:
$50.33

Component Description:
Please deny this invoice
Amount:
N/A

Component Description:
Services to do a full-scale windload testing o
Amount:
$8,850.00

Component Description:
Please Deny this invoice.
Amount:
N/A

Component Description:
TRP Phase 1
Amount:
$44.63

Component Description:
TRP Phase 1
Amount:
$21,697.79

Component Description:
TRP Phase 1
Amount:
$25,384.41

Component Description:
Tower Reconfiguration
Amount:
$24,950.00

Component Description:
TRP Logistic Planning, Tom Silliman of ERI will attend a three day walk thru and meetings at ESB from 8/20 to 8/22.
Amount:
$9,038.00

Component Description:
Please deny this invoice.
Amount:
N/A

Component Description:
TRP Phase 1
Amount:
$19.37

Component Description:
structural review and analysis services
Amount:
$2,500.02

Component Description:
Univision Antenna Installation
Amount:
$14,999.98

Component Description:
TT to provide additional structural engineering services as part of the TRP Phase 1B project.
Amount:
$7,500.00

Component Description:
Please Deny this invoice.
Amount:
N/A

Component Description:
TRP Phase 1
Amount:
$2,640.00

Component Description:
Tower Reconfiguration
Amount:
$114,700.00

Component Description:
TRP Phase 1
Amount:
$7,300.00

Component Description:
Tower Reconfiguration - Structural Design
Amount:
$9,677.97
Sidewalk Sheds, General Construction

Component Description:
Existing Primary Tower - Sidewalk Sheds, General Construction
Amount:
$1,326.76
ESRT TRP tower modification Part 2

Component Description:
TRP Phase 2&3
Amount:
$2,730.00

Component Description:
TPR Phase 2&3
Amount:
$630.00

Component Description:
TRP Phase 2&3
Amount:
$1,200.00

Component Description:
Structural reinforcement services
Amount:
$4,533,753.80
Site Safety Information not provided.
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
Engineering Services
Amount:
$5,125.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $264,423.00 $1,697,485.50 N/A $283,291.91 N/A
Total for all systems $37,829,215.00 $45,076,360.50 N/A $14,157,397.21 N/A
Outside Professional Services $264,423.00 $1,697,485.50 $283,291.91
Perform engineering study for new channel assignment and antenna development $7,360.00 $437.50 Please see the attached invoice from dru Treil, Lundin & Rackley, Inc. # 240776, Broadcast Transmission Services, LLC 018I $312.50 N/A
Project management of the transition $203,188.00 $1,631,875.00 Predetermined cost (Univision direct cost) plus ESRT TRP actual costs $1,585,075 per lines 79-82 of attached cost list $278,891.91 N/A
RF Exposure Measurements $21,050.00 $38,548.00 Attached ESRT TRP cost line 92, for Auxiliary FM Master Antenna, previously installed, plus predetermined $20,000 for WFUT antenna N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $4,000.00 N/A $712.50 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $2,000.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $2,500.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,375.00 See invoice du Treil, Lundin & Rackley, Inc #240621 $3,375.00 s

Components

Actual Information Description File Name
Perform engineering study for new channel assignment and antenna development

Component Description:
K. Lahm - Temporary transmission line planning
Amount:
$125.00

Component Description:
K. Lahm - Temporary transmission line planning
Amount:
$187.50
Project management of the transition

Component Description:
Cost Reconciliation
Amount:
$64,842.70

Component Description:
Project management Services
Amount:
$3,605.00

Component Description:
Project Management
Amount:
$35,904.35

Component Description:
Project Management
Amount:
$42,652.10

Component Description:
Antenna Upgrade, Management Fees
Amount:
$5,435.00

Component Description:
Antenna Upgrade Management Fees
Amount:
$5,435.00

Component Description:
Antenna Upgrade Management Fees
Amount:
$5,435.00

Component Description:
Project Management
Amount:
$17,697.80

Component Description:
Project management Services
Amount:
$116.35

Component Description:
Antenna Upgrade Management Fees
Amount:
$5,435.00

Component Description:
Antenna Upgrade Project management
Amount:
$5,435.00

Component Description:
Project Management and Repack Implementation Engineering Services
Amount:
$6,712.50

Component Description:
Project Management and Repack Implementation Engineering Services
Amount:
$2,938.46

Component Description:
Antenna Upgrade Management Fees
Amount:
$10,870.00

Component Description:
Project Management
Amount:
$2,021.05

Component Description:
Antenna Upgrade Management Fees
Amount:
$5,435.00

Component Description:
Antenna Upgrade Management Fees
Amount:
$5,435.00

Component Description:
Project Management
Amount:
$30,734.55

Component Description:
Project Management
Amount:
$2,199.85

Component Description:
Antenna Upgrade Management Fees
Amount:
$5,435.00

Component Description:
Travel time to/from field engineering work. On-site retuning of former WXTV channel 40/41 transmission line to channel 30 for use by WFUT.
Amount:
$4,872.69

Component Description:
Antenna Upgrade Management Fees
Amount:
$5,435.00

Component Description:
Project Management
Amount:
$37.50

Component Description:
Project Management and Repack Implementation Engineering Services
Amount:
$4,717.40

Component Description:
Project Management and Repack Implementation Engineering Services
Amount:
$1,987.50

Component Description:
Project Management
Amount:
$3,525.05

Component Description:
Project management Services
Amount:
$286.00

Component Description:
Project Management
Amount:
$24,589.65

Component Description:
Project Management
Amount:
$8,541.90
RF Exposure Measurements Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations

Component Description:
K. Lahm - Support of legal analysis of ESRT reimbursement claim, CBS combiner measurement planning
Amount:
$712.50
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application Information not provided.
Prepare and or review reimbursement form Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Preparation of the engineering section of FCC Form 2100.
Amount:
$2,000.00

Component Description:
Engineering study.Preparation of the engineering section of FCC Form 2100. Professional Services
Amount:
$250.00

Component Description:
Comparison of DA & omni antennas & service, Master antenna waveguide size review
Amount:
$1,125.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $9,338,919.00 $9,338,354.00 N/A $5,250.00 N/A
Total for all systems $37,829,215.00 $45,076,360.50 N/A $14,157,397.21 N/A
Other Expenses $9,338,919.00 $9,338,354.00 $5,250.00
FM Aux Antenna Installation $9,118,509.00 $9,118,509.00 Line 58 of attached ESRT TRP cost list N/A N/A
Non-zoning permits $208,330.00 $208,330.00 ESRT TRP actual costs $149,165 per lines 44-46 of attached cost list for FM and tower work completed to date, plus repeat of lines 44 & 45 ($59,165), estimated cost of permits for WFUT antenna & tower work going forward N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $5,250.00 N/A

Components

Actual Information Description File Name
FM Aux Antenna Installation Information not provided.
Non-zoning permits Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
DTV Medical Facility Notification

Component Description:
Medical Notification Mailing Complete per FCC Repack
Amount:
$5,250.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $37,829,215.00 $45,076,360.50 $14,157,397.21

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Marcello Enriquez

Senior Finance Analyst


07/08/2019

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Marcello Enriquez

Senior Finance Analyst


07/08/2019

Attachments

Back to Top