Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
UNIMAS ORLANDO, INC. Doing Business As: UNIMAS ORLANDO, INC. |
Christopher G. Wood 5999 CENTER DRIVE LOS ANGELES, CA 90045 United States |
+1 (310) 348-3600 | CWOOD@UNIVISION.NET | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Theodore Stoner VP Distribution Technology Strategy Univision Communications Inc. |
Theodore Stoner 9405 NW 41st Street Miami, FL 33178 United States |
+1 (513) 608-0308 | tstoner@univision.net |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Commence interim operation on current channel using site lessor's new wideband antenna and channel combiner. Replace existing antenna, transmitter, and mask filter. See attached Implementation Plan for details. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | CD3200CP2 | |
Year | 2002 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 42 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | THU9-24 EVO | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 37 kW | |
Justification for New Transmitter | Existing transmitter incapable of operation below channel 40, see attached IOT Replacement Analysis document |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Installation of 480:400V step-down transformer, secondary distribution, primary AC conduit/wiring to transmitter cabinet, and conduit/wiring to ancillary equipment. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | ATW30HS4-HSCX-43H | |
Year | 2006 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | SAA24-3BP260-J400-ES6R-22 | |
Year | 2018 | |
Justification for New Antenna | Current single frequency antenna incapable of operating on post repack channel. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 8 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Rent Temporary | |
Ownership | Leased | |
Owner | American Tower Corporation | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 24 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 698.00 MHz | |
Design power capacity in use | 80.0 % | |
Other Antenna Type | N/A | |
ERP: | 165.0 kW | |
Manufacturer | ||
Model | TFU-24WB S230 | |
Year | 2018 | |
Justification for New Antenna | Maintain continuity of operation while station's antenna is replaced atop the tower candelabra. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 6 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
43 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Electronics Research Inc |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1840 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Lease New | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Segment Length | Broadband | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1525 feet per run | |
Justification for New Transmission Line | Requires an interim BBA shared side mount antenna to maintain operations while existing single frequency top mount antenna is replaced. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1212124 | |
Coordinates (NAD83) | Latitude (NAD83) | 28° 35' 12.6" N- |
Longitude (NAD83) | 081° 04' 57.5" W- | |
Overall Structure Height | 1682.07 feet | |
Support Structure Height | 1574.13 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 66.93 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Tower, LLC | |
Date Constructed | 03/18/2002 |
Facility ID | Call Sign | Service |
---|---|---|
10549 | WRCF-CD | DTV |
24582 | WHLV-TV | DTV |
60018 | WACX | DTV |
9881 | WTGL | DTV |
41375 | WDYB-CD | DTV |
53465 | WKCF | DTV |
Users |
---|
WOFT-LD |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for tower with candelabra |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower construction PM |
10 hours on Modification project management and 10 hours for RF installation project management for a total of ten 10 days |
Tower Site Coordination |
Site Coordination Meeting |
Ground and Building Drawing Package |
The generation of a permitting drawing package for one (1) broadcasters, customers. |
Tower Permit Drawing Package |
The generation of a permitting drawing package for one (1) broadcasters/customers. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 1115 | |
Explanation | Univision stations are only staffed for daily station operations and minor equipment changes, major projects are contracted out externally. The large volume of work associated with repack schedule requires using external project management resources. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 1 | |
Justification | Testing of multi-channel combiner and BBA for optimization, per line #194 of attached ATC Interim antenna costs. |
Name | Description |
---|---|
American Tower PM |
Project management fee for pre-construction services (including initial antenna placement and RF compatibility review, zoning and permitting requirements review; leasing application services) to support the transition of five (5) broadcasters. |
RF System Test |
Testing of the interim combiner to ensure all two (2) frequencies are tuned for optimal patterns. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | No | |
Does this relocation require MVPD Notification of a Channel Change? | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,531,800.00 | $818,520.00 | N/A | $111,460.45 | N/A |
Total for all systems | $3,547,249.63 | $2,112,749.91 | N/A | $276,644.13 | N/A |
Primary Transmitter THU9-24 EVO | $1,531,800.00 | $818,520.00 | $111,460.45 | ||
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $13,585.00 | 165 KVA per R&S Quote 130695.2 | $1,305.16 | N/A |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | $1,473,000.00 | $782,935.00 | per R&S Quote 130695.2 | $110,155.29 | N/A |
Other Electrical Service: Installation of 480:400V step-down transformer, secondary distribution, primary AC conduit/wiring to transmitter cabinet, and conduit/wiring to ancillary equipment. | $22,000.00 | $22,000.00 | See attached WOTF electrical distribution cost estimate. | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Transformer 3 phase/480v - 300 KVA | |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | |
Other Electrical Service: Installation of 480:400V step-down transformer, secondary distribution, primary AC conduit/wiring to transmitter cabinet, and conduit/wiring to ancillary equipment. | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $512,074.31 | $420,654.59 | N/A | $33,880.90 | N/A |
Total for all systems | $3,547,249.63 | $2,112,749.91 | N/A | $276,644.13 | N/A |
Interim Antenna TFU-24WB S230 | $302,930.00 | $214,000.28 | $33,880.90 | ||
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 165 kW input, directional,, horizontally polarized | $82,800.00 | $82,800.00 | Apportioned Cost for American tower shared antenna, per line 72 of WOTF ATC Interim antenna cost schedule. (shared by two broadcasters) | $15,324.92 | N/A |
Sweep test of existing antenna | $6,730.00 | $4,500.00 | Per line #97 of WOTF ATC interim antenna cost. | $1,195.87 | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $63,700.28 | Please see attached estimate from ATC. Estimate includes installation and sales tax. | $15,925.06 | N/A |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $5,400.00 | Per line #103 of WOTF ATC interim antenna cost. | $1,435.05 | N/A |
Interim antenna rental and installation - Cost will depend on antenna size and height and/or complexity of tower. | $115,500.00 | $57,600.00 | Shared interim antenna and additional tower attachment rental cost per American Tower interim antenna cost estimate, line# 225 | N/A | N/A |
Primary Antenna SAA24-3BP260-J400-ES6R-22 | $209,144.31 | $206,654.31 | $0.00 | ||
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized | $158,754.31 | $158,754.31 | RFS Quotation 20076738 | N/A | N/A |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $22,000.00 | N/A | N/A | N/A |
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) | $15,250.00 | $14,500.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 165 kW input, directional,, horizontally polarized | |
Sweep test of existing antenna | |
New combiner, cost per channel (without antenna) | |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | |
Interim antenna rental and installation - Cost will depend on antenna size and height and/or complexity of tower. | Information not provided. |
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized | Information not provided. |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $608,475.00 | $164,700.00 | N/A | $43,769.02 | N/A |
Total for all systems | $3,547,249.63 | $2,112,749.91 | N/A | $276,644.13 | N/A |
Interim Transmission Line | $608,475.00 | $164,700.00 | $43,769.02 | ||
Rigid Transmission Line - copper, 8 3/16" broadband | $608,475.00 | $164,700.00 | ATC Cost Estimation | $43,769.02 | N/A |
Primary Transmission Line | $0.00 | $0.00 | $0.00 |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 8 3/16" broadband |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $612,117.00 | $444,857.00 | N/A | $43,599.98 | N/A |
Total for all systems | $3,547,249.63 | $2,112,749.91 | N/A | $276,644.13 | N/A |
Primary Tower GTOWER | $612,117.00 | $444,857.00 | $43,599.98 | ||
Tower construction PM | $2,655.00 | $2,655.00 | See American Tower cost estimate line 170; American Tower Invoice #460209591 | $2,655.00 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $400,000.00 | N/A | $13,287.50 | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $18,585.00 | Per ATC Invoice 460209591 | $18,585.00 | N/A |
Structural engineering tower load study for a documented tower with candelabra | $20,000.00 | $13,155.00 | See American Tower Primary Antenna cost estimate lines 148 and 150. | $9,072.48 | N/A |
Tower Site Coordination | $1,062.00 | $1,062.00 | ATC Inovoice 460209591 | N/A | N/A |
Ground and Building Drawing Package | $4,700.00 | $4,700.00 | See American Tower cost estimate line 168. | N/A | N/A |
Tower Permit Drawing Package | $4,700.00 | $4,700.00 | See American Tower primary antenna cost estimate line 167. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Tower construction PM | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Minor tower reinforcement/modifications | |
Structural engineering tower load study for a documented tower with candelabra | |
Tower Site Coordination | Information not provided. |
Ground and Building Drawing Package | Information not provided. |
Tower Permit Drawing Package | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $233,143.32 | $218,783.32 | N/A | $42,737.91 | N/A |
Total for all systems | $3,547,249.63 | $2,112,749.91 | N/A | $276,644.13 | N/A |
Outside Professional Services | $233,143.32 | $218,783.32 | $42,737.91 | ||
Project management of the transition | $176,170.00 | $171,710.00 | N/A | $33,468.84 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $3,500.00 | American Tower tenant coordination fees, see ATC primary antenna cost estimate lines 175, and 192. | $2,655.00 | N/A |
RF System Test | $3,543.32 | $3,543.32 | Please see attached estimates and invoices from ATC. | $885.82 | N/A |
American Tower PM | $9,480.00 | $9,480.00 | See American Tower primary antenna cost estimate line 174. | $1,062.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $5,000.00 | Engineering study for ATC shared interim antenna per line 177 of attached WOTF ATC interim antenna costs. | $2,166.25 | N/A |
Additional Field Engineering Service, 1 Days | $3,300.00 | $3,300.00 | Per line #194 of attached WOTF ATC Interim antenna costs. | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $3,500.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $2,500.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $2,500.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
Address transition timing and coordination issues w/ other stations and wireless | |
RF System Test | |
American Tower PM | |
Perform engineering study for new channel assignment and antenna development | |
Additional Field Engineering Service, 1 Days | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare and or review reimbursement form | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $49,640.00 | $45,235.00 | N/A | $1,195.87 | N/A |
Total for all systems | $3,547,249.63 | $2,112,749.91 | N/A | $276,644.13 | N/A |
Other Expenses | $49,640.00 | $45,235.00 | $1,195.87 | ||
Equipment Delivery and Handling Charges | $4,500.00 | $4,500.00 | Per attached WOTF Interim antenna costs, line# 207 | $1,195.87 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $31,200.00 | $31,200.00 | Quote for removing/recycling identical transmitter at WAMI-DT Hollywood, FL attached for reference. | N/A | N/A |
Non-zoning permits | $750.00 | $750.00 | See American Tower cost estimate line 202. | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $7,200.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Non-zoning permits | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
DTV Medical Facility Notification | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,547,249.63 | $2,112,749.91 | $276,644.13 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Marcello Enriquez Senior Finance Analyst 07/04/2019 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Marcello Enriquez Senior Finance Analyst 07/04/2019 |