Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
27504
Service:
DTV
Call Sign:
WKPT-TV
Channel:
32 (UHF)
File Number:
0000026143
FRN:
0001770163
Date Submitted:
06/10/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

HOLSTON VALLEY BROADCASTING CORPORATION

Doing Business As: HOLSTON VALLEY BROADCASTING CORPORATION

Nathan D. Widener

222 COMMERCE STREET

KINGSPORT, TN 37660

United States

+1 (423) 723-6134 davidw@wtfm.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan To keep our current channels on the air while we build our new assigned channels we will have to remove the old 65.5 foot UHF analog antenna replacing it with a 65.5 pole to have room for the new antennas for channel 16 & 36, since our tower is full.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? Yes
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model TAU 2-5K00AA
Year 2003
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 4 kW

Facility ID's and Call Signs of all stations with whom the transmitter is shared.

Facility ID Call Sign
77677 WAPK-CD

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model EC708HP-BB
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 7 kW
Justification for New Transmitter We need to keep our existing channel 27 operation on the air while we build our new channel 32 facility. Our existing transmitter will not produce the power needed to feed our new channel 32 antenna system. It will only produce 4kW of digital power.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Remote Control Upgrade

Upgrade Burk remote control to be compatible with new Comark transmitter

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Add Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Auxiliary (Backup)
Description of Use Emergency backup low power Antenna
Ownership Owned
Owner N/A
Site N/A
Is this antenna currently shared with any other stations? No
Is this antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Middle
Polarization Horizontal
Type Other
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type Para-slot
ERP: 13.8 kW
Manufacturer
Model SCA-SL8CH27
Year 2000

Auxiliary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Auxiliary (Backup)
Description of Use Emergency low power backup antenna
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Bottom
Polarization Circular
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 13.8 kW
Manufacturer
Model SCA-SL8CH32
Year 2017
Justification for New Antenna It is a channel specific antenna and our current emergency backup antenna will not work on our new assigned channel,

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Primary Antenna

Back to Top

Add Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this antenna currently shared with any other stations? No
Is this antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Middle
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 1
Number of Panels 16
Design power capacity in use 100.0 %
Lower Limit 548.00 MHz
Upper Limit 554.00 MHz
Other Antenna Type N/A
ERP: 200.0 kW
Manufacturer
Model TLP-16E
Year 2005

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Top
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 1
Number of Panels/Bays 16
Lower Limit 578.00 MHz
Upper Limit 584.00 MHz
Design power capacity in use 100.0 %
Other Antenna Type N/A
ERP: 222.0 kW
Manufacturer
Model TLP-16E
Year 2017
Justification for New Antenna Our new assigned channel is 32. We need a new antenna because our existing antenna is not multiple channel, plus we need to keep channel 27 on the air while we build channel 32.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Auxiliary Transmission Line

Back to Top

Add Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Auxiliary (Backup)
Description of Use Backup
Ownership Owned
Owner N/A
Site N/A
Is this transmission currently shared with any other stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Unknown
Type Flexible Foam
Diameter 1 5/8 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 158 feet per run

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Air
Diameter 3 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 150 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Flexible Air
Diameter 3 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 250 feet per run
Justification for New Transmission Line We need a new antenna installed and operating while our existing station is on the air. The mounting position of the new antenna and the proximity of the new transmitter requires additional length of transmission line.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Flexible Air
Diameter 3 inches
Segment Length N/A
Other Segment Length
Number of parallel runs 1
Length 275 feet per run
Justification for New Transmission Line Needed for interim operation on pre-transition channel on nearby rental tower using existing primary antenna

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Add Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? Terrain Constrained
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1054538
Coordinates (NAD83) Latitude (NAD83) 36° 25' 53.0" N-
Longitude (NAD83) 082° 08' 15.0" W-
Overall Structure Height 225.72 feet
Support Structure Height 169.29 feet
Ground Elevation Above Mean Sea Level (AMSL) 4172.85 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner HOLSTON VALLEY BROADCASTING CORPORATION
Date Constructed 10/01/1994

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
27490 WOPI-CD DTV
77677 WAPK-CD DTV
27489 WTFM FM

Other Types of Users

Users
2 ghz receive
7ghz receive
FM translator
FM Translator
7 ghz transmit
950 mhz STL

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Terrain constrained
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Interim Tower

Back to Top

Tower Construction Costs

Section Question Response
Construct New Tower Use Interim
Description of Use N/A
Height 228.00 feet
Justification for New Tower Rental for 7 months

Interim Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Terrain constrained
Helicopter Services Required Are helicopter services required? No

Interim Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Interim Tower Analysis

Structural analysis for use of existing tower owned by WJHL-TV for a period of 7 months while licensee's tower is modified.

Tower Lease

Rent for Interim operation of WKPT-TV

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 8
Explanation We have received a quote from Stainless, Inc. of Cedar Hill, Texas for a package including (a) the tower engineering study; (b) replacing the top 65 feet of the tower; (c) tower rigging; and (d) remove replace existing antennas and transmission lines
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers No
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Other Engineering Services

Engineering services not included in any other 399 section

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Electrical

Electrical

FCC License to Cover Filing Fee

FCC License to Cover Filing Fee

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $477,820.15 $467,943.37 N/A $241,730.19 N/A
Total for all systems $2,738,624.64 $1,057,402.49 N/A $604,259.19 N/A
Primary Transmitter EC708HP-BB $477,820.15 $467,943.37 $241,730.19
Remote Control Upgrade $3,201.03 $3,201.03 50 percent split with WAPK for Burk remote control upgrade. Increased to include shipping. See Invoice 10288-1. $3,201.02 x
UHF - Air Cooled Solid State Transmitter 7 kW $238,119.12 $238,119.12 See WKPT Transmitter Quote EC708HP-BB. Also see WKPT TRANSMITTER JUSTIFICATION. $11,905.95 N/A
UHF - Air Cooled Solid State Transmitter 4 - 6 kW $236,500.00 $226,623.22 ***System Notice: Estimate adjusted and locked because line has been superseded.***New quote from Comark for one step up based on headroom greater than 10 percent, Includes Sales Tax $226,623.22 Sales Tax was added after the quote was accepted.

Components

Actual Information Description File Name
Remote Control Upgrade

Component Description:
Final payment for remote control upgrade
Amount:
$160.04

Component Description:
WKPT Share of 50 pct down payment. See cover letter for rounding and splitting calculations
Amount:
$1,600.52

Component Description:
WKPT 50% share of 45% progress payment for shared remote control system
Amount:
$1,440.46
UHF - Air Cooled Solid State Transmitter 7 kW

Component Description:
Final payment for transmitter
Amount:
$11,905.95
UHF - Air Cooled Solid State Transmitter 4 - 6 kW

Component Description:
45% Progress Payment for new transmitter
Amount:
$107,153.60

Component Description:
Transmitter installation electrical supplies
Amount:
$264.02

Component Description:
Transmitter installation electrical supplies
Amount:
$3.40

Component Description:
50 pct down payment for new transmitter for WKPT
Amount:
$119,059.56

Component Description:
Transmitter installation electrical supplies
Amount:
$84.21

Component Description:
Transmitter installation electrical supplies
Amount:
$58.43

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $231,469.81 $48,631.81 N/A $42,231.81 N/A
Total for all systems $2,738,624.64 $1,057,402.49 N/A $604,259.19 N/A
Primary Antenna TLP-16E $219,380.00 $36,872.00 $36,872.00
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized $189,500.00 $21,292.00 Dielectric quote $21,292.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $9,180.00 Dielectric quote $9,180.00 N/A
Auxiliary Antenna SCA-SL8CH32 $12,089.81 $11,759.81 $5,359.81
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A
UHF - High Power, Side Mount, basic slot antenna, 14 kW input, elliptically or circularly polarized $5,359.81 $5,359.81 We currently have an emergency backup antenna and they are channel specific so we will need one for our new assigned channel 32. Katrein Scala SL8 quote $5,359.81 N/A

Components

Actual Information Description File Name
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized

Component Description:
TLP-16E primary antenna
Amount:
$21,292.00
Sweep test of existing antenna

Component Description:
Sweep of the antenna
Amount:
$6,400.00
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
Custom Mounting brackets for the antenna
Amount:
$9,180.00
Sweep test of existing antenna Information not provided.
UHF - High Power, Side Mount, basic slot antenna, 14 kW input, elliptically or circularly polarized

Component Description:
WKPT Auxiliary Antenna
Amount:
$5,339.25

Component Description:
Fastenal TNKIN220062 v190514pmv1
Amount:
$20.56

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $30,975.00 $18,593.53 N/A $18,542.97 N/A
Total for all systems $2,738,624.64 $1,057,402.49 N/A $604,259.19 N/A
Interim Transmission Line $16,225.00 $9,665.09 $9,614.53
Flexible Air Transmission Line - dielectric, 3" $16,225.00 $9,665.09 N/A $9,614.53 x
Primary Transmission Line $14,750.00 $8,928.44 $8,928.44
Flexible Air Transmission Line - dielectric, 3" $14,750.00 $8,928.44 N/A $8,928.44 N/A
Auxiliary Transmission Line $0.00 $0.00 $0.00

Components

Actual Information Description File Name
Flexible Air Transmission Line - dielectric, 3"

Component Description:
items to clean, prepare and install brass ends on transmission lines
Amount:
$48.30

Component Description:
items to clean, prepare and install brass ends on transmission lines
Amount:
$50.56

Component Description:
Clamps to hang Transmission line on tower
Amount:
$109.66

Component Description:
items to clean, prepare and install brass ends on transmission lines
Amount:
$23.36

Component Description:
Components to clean, prep, install Line ends split 50/50 with WAPK
Amount:
$50.56

Component Description:
items to clean, prepare and install brass ends on transmission lines
Amount:
$28.02

Component Description:
Interim Transmission Line. See attached Quote for WKPT
Amount:
$9,344.31

Component Description:
items to clean, prepare and install brass ends on transmission lines
Amount:
$10.32
Flexible Air Transmission Line - dielectric, 3"

Component Description:
Primary Transmission Line. See attached Quote for WKPT
Amount:
$8,838.04

Component Description:
Fastenal TNKIN221074 v190514pmv1
Amount:
$18.07

Component Description:
Fastenal TNKIN220902 v190514pmv1
Amount:
$72.33

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,929,766.66 $473,326.76 N/A $258,154.34 N/A
Total for all systems $2,738,624.64 $1,057,402.49 N/A $604,259.19 N/A
Interim Tower $444,166.66 $37,855.66 $16,090.73
Tower Lease $16,666.66 $16,666.66 Rent for the period of 7 months through the Phase 2 transition $8,444.41 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $14,689.00 Stainless quote $4,896.32 N/A
Interim Tower Analysis $6,500.00 $6,500.00 Stainless quote $2,750.00 N/A
New tower $0.00 $0.00 Existing tower is being rented for 7 months. N/A N/A
Primary Tower TOWER $1,485,600.00 $435,471.10 $242,063.61
Serious tower reinforcement/modifications $1,052,000.00 $395,535.60 WKPT-TV Tower Modifications partially shared with co-owned repack station WAPK-CD $212,531.71 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $37,935.50 See estimates from Stainless, Inc. for installing antennas and line on primary and nearby rental tower for interim operation $27,531.90 N/A
Structural engineering tower load study for well documented tower $12,600.00 $2,000.00 see attached estimate from Stainless, inc. 50 percent of cost split with WAPK $2,000.00 N/A

Components

Actual Information Description File Name
Tower Lease

Component Description:
Rent Payment Month 3 January 2018
Amount:
$1,666.66

Component Description:
Share of interim tower rent
Amount:
$1,666.66

Component Description:
Tower Rent for Interim antenna
Amount:
$1,666.66

Component Description:
Tower rent for WKPT Interim antenna
Amount:
$1,666.66

Component Description:
Lease payment for tower space for interim antennas
Amount:
$1,666.66

Component Description:
WJHL inv #6 Share of Interim Tower rent pmt 6 UL20190424jgv1
Amount:
$111.11
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
FDH inv #E-184004 Install and remove temp ants on WJHL tower pmt 2 UL20190424jgv1
Amount:
$2,448.16

Component Description:
FDH inv #E-177456 Install and remove temp ants on WJHL tower pmt 1 UL20190424jgv1
Amount:
$2,448.16
Interim Tower Analysis

Component Description:
50 pct final payment for structural analysis of interim rental tower. Services have been completed.
Amount:
$1,375.00

Component Description:
50 pct down payment for structural analysis of interim rental tower. Services have been completed.
Amount:
$1,375.00
New tower Information not provided.
Serious tower reinforcement/modifications

Component Description:
Kendall S107883800.001 v190514pmv1
Amount:
$57.04

Component Description:
Kendall S107865256.001 v190514pmv1
Amount:
$73.47

Component Description:
30 pct down payment for 50% of the total cost of tower reinforcement modifications
Amount:
$69,800.40

Component Description:
Dug 110 ft ditch to bury overhead electrical lines
Amount:
$3,000.00

Component Description:
Construction services 60% Progress payment for Tower modifications and Rigging
Amount:
$139,600.80
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
60% Progress payment for Tower modifications and Rigging
Amount:
$18,354.60

Component Description:
30 pct down payment of 50 pct of the total rigging and antenna and line installation cost, shared with WAPK
Amount:
$9,177.30

Component Description:
Complex Tower Rigging antenna installation
Amount:
$18,354.60
Structural engineering tower load study for well documented tower

Component Description:
One half balance due for tower Structural analysis for WKPT
Amount:
$1,000.00

Component Description:
One half down payment for tower structural analysis for WKPT
Amount:
$1,000.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $44,024.25 $32,638.25 N/A $27,611.58 N/A
Total for all systems $2,738,624.64 $1,057,402.49 N/A $604,259.19 N/A
Outside Professional Services $44,024.25 $32,638.25 $27,611.58
Other Engineering Services $14,150.25 $14,150.25 Engineering services not included in any other 399 section $14,150.25 add
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $275.00 N/A $183.33 N/A
ASR modification (prepare FCC Form 854) $2,105.00 $1,500.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,000.00 N/A $350.00 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $3,150.00 See attached invoices and quotes (if applicable). $3,150.00 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,535.00 N/A $900.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,000.00 N/A $300.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $2,300.00 Invoice for engineering CP application was greater than estimated $2,300.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $0.00 Included in CP application charges N/A N/A
Prepare and or review reimbursement form $2,630.00 $5,528.00 The Estimated Cost shown is to cover the expense of having Actual Cost invoices prepared and submitted into this 399 Reimbursement Form. $5,528.00 N/A
Project management of the transition $1,264.00 $1,200.00 N/A $750.00 N/A

Components

Actual Information Description File Name
Other Engineering Services

Component Description:
Delawder 5273 v190521jgv2
Amount:
$600.00

Component Description:
OPS OES actual cost invoices for WKPT
Amount:
$2,862.00

Component Description:
FCC application for STA to operate on Interim tower
Amount:
$1,535.00

Component Description:
Prepare and submit Actual Cost Invoices
Amount:
$2,125.00

Component Description:
OPS OES amended 399 for WKPT
Amount:
$265.00

Component Description:
RF Design for revised transition plan and 399 amendment for WKPT
Amount:
$3,437.50

Component Description:
Design, RF calculations and amendment of 399
Amount:
$2,716.25

Component Description:
OPS OES related to repack for WKPT
Amount:
$609.50
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase

Component Description:
Prep and submit FAA 7460-1; cost split between WKPT WAPK WOPI
Amount:
$183.33
ASR modification (prepare FCC Form 854) Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
DJK 831 v190513pmv1
Amount:
$350.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Reimbursement for part of invoice covering initial CP application July 6 Form 2100
Amount:
$2,800.00

Component Description:
DJK 831 v190513pmv1
Amount:
$350.00
Prepare request for Special Temporary Authorization

Component Description:
STA for repack Interim operation of WKPT
Amount:
$550.00

Component Description:
DJK 831 v190513pmv1
Amount:
$350.00

Component Description:
Prepare technical portion of STA for interim operation
Amount:
$1,535.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Delawder 5273 v190521jgv2
Amount:
$300.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Engineering for CP Application for WKPT
Amount:
$2,300.00
Perform engineering study for new channel assignment and antenna development Information not provided.
Prepare and or review reimbursement form

Component Description:
KGA inv #964-43 Amend 399 RG Feb 2019 UL20190422jgv1
Amount:
$400.00

Component Description:
KGA inv #964-45 AC invs JG Mar 2019 UL20190422jgv1
Amount:
$125.00

Component Description:
KGA 964-64 v190610pmv1
Amount:
$1,272.50

Component Description:
KGA inv #964-55 AC invs RG Mar 2019 UL20190422jgv1
Amount:
$525.00

Component Description:
KGA inv #964-42 AC invs RG Feb 2019 UL20190422jgv1
Amount:
$1,375.00

Component Description:
KGA inv #964-48 AC invs JG Nov 2018 UL20190422jgv1
Amount:
$75.00

Component Description:
KGA 964-59 v190513pmv1
Amount:
$1,755.50
Project management of the transition

Component Description:
Prog Rept 387 3Q2018
Amount:
$150.00

Component Description:
Progress Report 4Q18
Amount:
$150.00

Component Description:
Prep and submit Form 387 for 10 weeks prior to transition
Amount:
$150.00

Component Description:
KGA inv #964-51 Form 387 2019 Q1 UL20190429jgv1
Amount:
$150.00

Component Description:
FCC 387 progress report 2Q18 WKPT
Amount:
$150.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $24,568.77 $16,268.77 N/A $15,988.30 N/A
Total for all systems $2,738,624.64 $1,057,402.49 N/A $604,259.19 N/A
Other Expenses $24,568.77 $16,268.77 $15,988.30
DTV Medical Facility Notification $11,550.00 $3,250.00 N/A $3,245.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $500.00 $500.00 Estimate is to cover rental truck, rental truck fuel and landfill fee for disposal of old station equipment replaced by new Repack equipment. $268.45 N/A
Equipment Delivery and Handling Charges $3,500.00 $3,500.00 Increased to cover cost of Primary Antenna delivery $3,456.08 N/A
Develop and air announcement of upcoming channel change $0.00 $0.00 N/A N/A N/A
FCC License to Cover Filing Fee $1,635.00 $1,635.00 FCC License to Cover Filing Fee $1,635.00 N/A
Electrical $5,098.77 $5,098.77 This expense is for electrical work. $5,098.77 N/A
MVPD Notification of Channel Change $2,285.00 $2,285.00 The station needed to re-send its MVPD notifications to specify the actual Transition date instead of just "Phase 2". $2,285.00 N/A

Components

Actual Information Description File Name
DTV Medical Facility Notification

Component Description:
Prepare and mail medical notifications
Amount:
$3,245.00
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Penske inv #68476213 Truck rental for WAPK WKPT disposal v190430jgv1
Amount:
$91.58

Component Description:
Landfill inv #75908 Landfill fee for WAPK WKPT disposed materials v190430jgv1
Amount:
$20.64

Component Description:
Shell inv #9064031 Fuel for rented WAPK WKPT disposal truck v190430jgv1
Amount:
$19.50

Component Description:
Penske 69754331 v190514pmv1
Amount:
$108.49

Component Description:
Kingsport 80754 v190514pmv1
Amount:
$10.24

Component Description:
GasNGo 64592 v190514pmv1
Amount:
$18.00
Equipment Delivery and Handling Charges

Component Description:
50% of fuel for rental truck to deliver repack equipment to the site. Shared with WAPK
Amount:
$28.45

Component Description:
50% share of rental truck to deliver repack equipment to the site shared with WAPK
Amount:
$127.15

Component Description:
Pallet jack to move equipment to be installed and removed.
Amount:
$136.87

Component Description:
Delivery of primary antenna from manufacturer facility
Amount:
$2,632.25

Component Description:
Stone for road bed to enable site access
Amount:
$531.36
Develop and air announcement of upcoming channel change Information not provided.
FCC License to Cover Filing Fee

Component Description:
FCC inv #0000070485 Lic to Cover filing fee WKPT UL20190410jgv1
Amount:
$335.00

Component Description:
FCC 0000068618 v190514pmv1
Amount:
$200.00

Component Description:
FCC 0000068756 v190514pmv1
Amount:
$1,100.00
Electrical

Component Description:
E Electric inv #201904162019 Electrical work UL20190422jgv1
Amount:
$5,098.77
MVPD Notification of Channel Change

Component Description:
KGA inv #964-38 Revised MVPD notifications resent UL20190326jgv1
Amount:
$530.00

Component Description:
Prepare and mail MVPD notices
Amount:
$1,755.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,738,624.64 $1,057,402.49 $604,259.19

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey C Gehman

Engineering Associate


06/10/2019

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey C Gehman

Engineering Associate


06/10/2019

Attachments