Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
HOLSTON VALLEY BROADCASTING CORPORATION Doing Business As: HOLSTON VALLEY BROADCASTING CORPORATION |
Nathan D. Widener 222 COMMERCE ST KINGSPORT, TN 37660 United States |
+1 (423) 723-6134 | davidw@wtfm.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | tower and building is shared with these stations |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | Yes | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TAU 2-5K00AA | |
Year | 2003 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Facility ID | Call Sign |
---|---|
27504 | WKPT-TV |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | EC702HP-BB | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.5 kW | |
Justification for New Transmitter | We need to keep our existing channel 36 signal on the air while we build out our new assigned channel 16. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Burk Arc Plus Touch V5 |
Upgrade of remote control system to be compatible with the new Comark transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Horizontal | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | 6 Parapanels | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | SCA-4DR4S | |
Year | 2003 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Horizontal | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | Parapanel | |
ERP: | 9.63 kW | |
Manufacturer | ||
Model | PSILP8-16 | |
Year | 2018 | |
Justification for New Antenna | We need a new antenna because they are channel specific and we are moving from 36 to 16. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 185 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 150 feet per run | |
Justification for New Transmission Line | We have to have a new antenna so we will need additional transmission line to keep both channels on air. The new location of the antenna and the transmitter will require additional length of line. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Segment Length | N/A | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 310 feet per run | |
Justification for New Transmission Line | To serve the existing primary antenna when it is moved to a nearby rental tower for interim operation through the transition |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Terrain Constrained | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1042697 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 25' 54.7" N- |
Longitude (NAD83) | 082° 08' 15.2" W- | |
Overall Structure Height | 228.02 feet | |
Support Structure Height | 174.21 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 4159.07 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | Nexstar Broadcasting, Inc. | |
Date Constructed | 02/26/2015 |
Facility ID | Call Sign | Service |
---|---|---|
57826 | WJHL-TV | DTV |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Pipe to pipe clamps |
Clamps to mount existing antenna on Interim tower |
Tower Lease |
Rent for 7 months use of tower for WAPK interim antenna |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | Terrain Constrained | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1054538 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 25' 53.0" N- |
Longitude (NAD83) | 082° 08' 15.0" W- | |
Overall Structure Height | 225.72 feet | |
Support Structure Height | 169.29 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 4172.85 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | HOLSTON VALLEY BROADCASTING CORPORATION | |
Date Constructed | 10/01/1994 |
Facility ID | Call Sign | Service |
---|---|---|
27490 | WOPI-CD | DTV |
27504 | WKPT-TV | DTV |
77676 | WAPW-CD | DTV |
27489 | WTFM | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Serious Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 8 | |
Explanation | To prepare and submit quarterly reports and special progress reports near the end of the phase | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Other Engineering Services |
Engineering services not included in any other Form 399 OPS section |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
FCC License to Cover Filing Fee |
FCC License to Cover Filing Fee |
Electrical |
Electrical |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $205,487.26 | $83,828.13 | N/A | $83,828.12 | N/A |
Total for all systems | $2,237,136.63 | $447,644.12 | N/A | $394,528.34 | N/A |
Primary Transmitter EC702HP-BB | $205,487.26 | $83,828.13 | $83,828.12 | ||
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $4,340.87 | Transmitter and Electrical Supplies | $4,340.87 | x |
Burk Arc Plus Touch V5 | $160.05 | $160.05 | The prior entry for remote control is locked. Adding this item to reflect the difference. The total amount for 50% of the remote control (shared between WAPK and WKPT) will total $3,201.02 by adding this amount of $160.05. | $160.04 | N/A |
Remote Control Upgrade | $3,040.97 | $3,040.97 | ***System Notice: Estimate adjusted and locked because line has been superseded.***50 pct of the cost to upgrade the Burk remote control to be compatible with the new Comark transmitters. Increased to include shipping. See Invoice S10288-1. | $3,040.97 | The sub-total is equal to the Estimated Cost. |
UHF - Air Cooled Solid State Transmitter 0.85 kW | $76,286.24 | $76,286.24 | ***System Notice: Estimate adjusted and locked because line has been superseded.***new Comark quote for one-step up transmitter because the existing transmitter has more than 10 pct headroom. Increased estimate 11/22/18 to include sales tax | $76,286.24 | Sales Tax was added after the quote was accepted for the transmitter sale |
Actual Information Description | File Name |
---|---|
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Burk Arc Plus Touch V5 | |
Remote Control Upgrade | |
UHF - Air Cooled Solid State Transmitter 0.85 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $33,030.00 | $13,820.82 | N/A | $7,420.82 | N/A |
Total for all systems | $2,237,136.63 | $447,644.12 | N/A | $394,528.34 | N/A |
Primary Antenna PSILP8-16 | $33,030.00 | $13,820.82 | $7,420.82 | ||
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | $26,300.00 | $7,420.82 | revised quote from PSI for new LP8 antenna. Price includes deliver. 3-14-19 added elbow for antenna connection. | $7,420.82 | Please note that the antenna make and model are the same on the quote and invoice (second line under description). |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | |
Sweep test of existing antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $11,040.00 | $9,313.48 | N/A | $9,313.48 | N/A |
Total for all systems | $2,237,136.63 | $447,644.12 | N/A | $394,528.34 | N/A |
Interim Transmission Line | $7,440.00 | $5,667.34 | $5,667.34 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $7,440.00 | $5,667.34 | N/A | $5,667.34 | x |
Primary Transmission Line | $3,600.00 | $3,646.14 | $3,646.14 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $3,600.00 | $3,646.14 | Total cost of TL includes $414.34 delivery, which will not be entered into the Other Expenses category. This has caused the total to slightly exceed the Predetermined Cost. | $3,646.14 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" | |
Flexible Foam Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,923,611.60 | $297,261.42 | N/A | $258,368.77 | N/A |
Total for all systems | $2,237,136.63 | $447,644.12 | N/A | $394,528.34 | N/A |
Primary Tower TOWER | $1,485,600.00 | $273,353.50 | $242,683.10 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $37,935.50 | N/A | $27,531.90 | N/A |
Serious tower reinforcement/modifications | $1,052,000.00 | $232,668.00 | N/A | $212,401.20 | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $2,750.00 | SA for Interim Leased Tower shared between WAPK and WKPT | $2,750.00 | N/A |
Primary Tower GTOWER | $438,011.60 | $23,907.92 | $15,685.67 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $6,896.32 | The Invoice herein and Quote is for hanging and then removing the WKPT, WAPK and WTFM temporary antennas on the WJHL adjacent tower to the permanent WKPT / WAPK / WTFM tower | $6,896.32 | N/A |
Tower Lease | $16,666.66 | $16,666.66 | Rent for 7 months through Phase 2 for WAPK interim antenna | $8,444.41 | N/A |
Pipe to pipe clamps | $344.94 | $344.94 | N/A | $344.94 | N/A |
Actual Information Description | File Name |
---|---|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Serious tower reinforcement/modifications | |
Structural engineering tower load study for well documented tower | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Tower Lease | |
Pipe to pipe clamps |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $43,294.00 | $31,046.50 | N/A | $23,937.83 | N/A |
Total for all systems | $2,237,136.63 | $447,644.12 | N/A | $394,528.34 | N/A |
Outside Professional Services | $43,294.00 | $31,046.50 | $23,937.83 | ||
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $1,000.00 | N/A | $350.00 | N/A |
Other Engineering Services | $11,790.00 | $11,790.00 | Engineering services not included in any other OPS section | $11,790.00 | add |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,000.00 | N/A | $300.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $2,000.00 | N/A | $1,950.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $3,750.00 | See attached invoices and quotes (if applicable). | $3,150.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $4,914.50 | See attached invoices. | $4,914.50 | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $275.00 | N/A | $183.33 | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $1,500.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,585.00 | N/A | $550.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $0.00 | included in CP application costs | N/A | N/A |
Project management of the transition | $1,264.00 | $1,232.00 | N/A | $750.00 | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Other Engineering Services | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare and or review reimbursement form | |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | |
ASR modification (prepare FCC Form 854) | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $20,673.77 | $12,373.77 | N/A | $11,659.32 | N/A |
Total for all systems | $2,237,136.63 | $447,644.12 | N/A | $394,528.34 | N/A |
Other Expenses | $20,673.77 | $12,373.77 | $11,659.32 | ||
Electrical | $5,098.77 | $5,098.77 | This expense is for electrical work. | $5,098.77 | N/A |
FCC License to Cover Filing Fee | $335.00 | $335.00 | FCC License to Cover Filing Fee | $335.00 | N/A |
MVPD Notification of Channel Change | $2,190.00 | $2,190.00 | The station needed to re-send its MVPD notifications to specify the actual Transition date instead of just "Phase 2". | $2,190.00 | N/A |
Develop and air announcement of upcoming channel change | $0.00 | $0.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $1,000.00 | $1,000.00 | N/A | $823.83 | N/A |
DTV Medical Facility Notification | $11,550.00 | $3,250.00 | N/A | $3,080.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $500.00 | $500.00 | Estimate is to cover rental truck, rental truck fuel and landfill fee for disposal of old station equipment replaced by new Repack equipment. | $131.72 | N/A |
Actual Information Description | File Name |
---|---|
Electrical | |
FCC License to Cover Filing Fee | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Delivery and Handling Charges | |
DTV Medical Facility Notification | |
Disposal Costs (for equipment and other waste, net of any salvage value) |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,237,136.63 | $447,644.12 | $394,528.34 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 05/13/2019 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 05/13/2019 |