Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
TRUSTEES OF INDIANA UNIVERSITY Doing Business As: TRUSTEES OF INDIANA UNIVERSITY |
Deborah A. Lemon, Secretary of the Board of Trustees FRANKLIN HALL 200 601 E. KIRKWOOD AVE. BLOOMINGTON, IN 47405 United States |
+1 (812) 856-3731 | DALEMON@IU.EDU | Private Not-for-Profit Educational Institution |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
George C. Hopstetter Director Operation and Engineering Indiana University |
George C. Hopstetter WTIU, Indiana University 1229 E. 7th Street Bloomington, IN 47405 United States |
+1 (812) 855-3177 | GHOPSTET@INDIANA.EDU |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | WTIU will need to replace the current transmitter, exciter with backup, mask filter, combiner, dehydrator and top mount antenna to re-locate to digital Ch. 33. Current transmission line was sweep to verify acceptable RF/VSWR to operate on Ch.33. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Diamond DHD45P2 | |
Year | 2003 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 10.5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | ULXTE-30 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 19.2 kW | |
Justification for New Transmitter | Existing transmitter can not be re-channeled to meet the new FCC Ch. assignment, mask filter is channel specific and must be replaced to meet the new assignment channel. Uploaded new TPO recalculations for new requested antenna at Ch.33 lower gain 18.9 |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | New electrical breaker panel is required to facilitate Ch. 33 transmitter and supporting equipment. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 32 | |
Design power capacity in use | 35.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 806.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 224.0 kW | |
Manufacturer | ||
Model | TUA-SP4A-8/32H-1-TR | |
Year | 2002 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 384.0 kW | |
Manufacturer | ||
Model | TFU-18GTH/VP-R 6S250 | |
Year | 2019 | |
Justification for New Antenna | Current broadband antenna is not efficient single channel operations and limited capabilities. Antenna sweep indicated that power divider had a high than desired reflection on assigned channel.Initial Report when installed had a higher than desired VSWR |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 16 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 698.00 MHz | |
Design power capacity in use | 95.0 % | |
Other Antenna Type | N/A | |
ERP: | 132.43 kW | |
Manufacturer | ||
Model | i230ECW-16-14/33 | |
Year | 2019 | |
Justification for New Antenna | Interim antenna, side mount broadband operation on Ch. 14 during transition of primary top mount antenna to single CH. 33. Dielectric/ERI does not rent or lease interim antennas or transmission line. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | S | |
Feed Line Size | 6 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 650 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 4 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 0 | |
Length | 500 feet per run | |
Justification for New Transmission Line | Flex 4 inch Andrew HJ11-50 for interim side mount antenna feed. To service while primary top mount antenna is removed and replace by new single Ch. 33 antenna. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1234684 | |
Coordinates (NAD83) | Latitude (NAD83) | 39° 08' 31.0" N- |
Longitude (NAD83) | 086° 29' 42.9" W- | |
Overall Structure Height | 645.99 feet | |
Support Structure Height | 610.23 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 806.09 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | Trustees of Indiana University | |
Date Constructed | 12/28/2015 |
Facility ID | Call Sign | Service |
---|---|---|
68269 | WFIU | FM |
Users |
---|
Sprint |
New Cingular |
T-Mobile |
Verizon |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Interim Antenna installation |
Cost to install Aux antenna and 500ft of 4" transmission line for Ch. 14 while Primary antenna is removed and replaced. |
Antenna replacement |
Costs to remove existing top mounted antenna and install new Ch. 33 top mount antenna |
Lower Guy support upgrade |
Lower Guy supports upgraded to handle the added "AUX" Interim antenna loading on tower |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Number of Hours | N/A | |
Explanation | N/A | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Endeavor Communications |
New Ch. 33 receive element for provided PR-450 receive antenna feed local cable system programming. Change Ch. 14 element to CH. 33 element on Receive tower |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $836,350.00 | $801,701.92 | N/A | $214,217.31 | N/A |
Total for all systems | $1,995,757.00 | $1,600,811.57 | N/A | $220,987.31 | N/A |
Primary Transmitter ULXTE-30 | $836,350.00 | $801,701.92 | $214,217.31 | ||
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $650,351.92 | N/A | $214,217.31 | N/A |
Other Electrical Service: New electrical breaker panel is required to facilitate Ch. 33 transmitter and supporting equipment. | $132,100.00 | $132,100.00 | Requires replacement of Closed Transition Automatic Transfer switch with by-pass isolation ($34,922 additional cost) to wire in new transmitter and addition main breaker and sub panels to connect new transmitter while current transmitter remains on-line. | N/A | N/A |
5 Ton system | $20,250.00 | $19,250.00 | Over estimation on cooling the new liquid cooled transmitter. Upload Technical operating data showing the room heat dissipation of the Gate Air transmitter. New transmitter is to be installed in a separate room with limited HVAC service. Waiting on Quote | N/A | N/A |
Actual Information Description | File Name |
---|---|
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | |
Other Electrical Service: New electrical breaker panel is required to facilitate Ch. 33 transmitter and supporting equipment. | Information not provided. |
5 Ton system | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $430,660.00 | $387,395.00 | N/A | $0.00 | N/A |
Total for all systems | $1,995,757.00 | $1,600,811.57 | N/A | $220,987.31 | N/A |
Interim Antenna i230ECW-16-14/33 | $122,130.00 | $175,981.00 | $0.00 | ||
UHF - Lower Power Side Mount, One Station antenna . medium power (50-200 kW), elliptically or circularly polarized | $103,100.00 | $164,563.00 | Change in interim antenna, ERI does not rent or lease interim antenna. Requires purchase of new interim antenna. Includes side mounts $9,800 | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,250.00 | N/A | N/A | N/A |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $5,168.00 | 6 1/8" 90 degree miter elbow and hardware, | N/A | N/A |
Primary Antenna TFU-18GTH/VP-R 6S250 | $308,530.00 | $211,414.00 | $0.00 | ||
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $6,452.00 | 90 degree miter elbows and hardware | N/A | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $198,712.00 | ERI Cost is Hpol - Vpol cost of $15,500.00 | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,250.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $0.00 | $53,302.65 | N/A | $0.00 | N/A |
Total for all systems | $1,995,757.00 | $1,600,811.57 | N/A | $220,987.31 | N/A |
Primary Transmission Line | $0.00 | $53,302.65 | $0.00 | ||
Flexible Air Transmission Line - dielectric, 4" | $0.00 | $53,302.65 | 4" flexible transmission line to feed Interim side mount antenna. includes mounting and"O"-rings, mounting hardware. Includes RF transmission line sweep of $6,250.00 after installation. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $661,997.00 | $293,497.00 | N/A | $0.00 | N/A |
Total for all systems | $1,995,757.00 | $1,600,811.57 | N/A | $220,987.31 | N/A |
Primary Tower GTOWER | $661,997.00 | $293,497.00 | $0.00 | ||
Lower Guy support upgrade | $63,332.00 | $63,332.00 | Structural Analysis shows lower guy over stressed with "AUX" Interim antenna added to tower, manufacture recommends lower guy supports be upgraded to elevate over stress points on the lower guy. | N/A | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $0.00 | N/A | N/A | N/A |
Interim Antenna installation | $134,914.00 | $134,914.00 | Interim aux antenna (i230ECW-16-14/33) installation with 530-ft 5" flexible transmission line. Aux antenna needed to maintain air operations while top antenna is being replaced. Note: Installation cost tripled since original quote. | N/A | N/A |
Antenna replacement | $95,251.00 | $95,251.00 | Cost to remove existing top mounted Ch. 14 antenna replace with Ch. 33 top mounted antenna (TFU-18GTH/VP-R 6S250), hook to existing 6 1/8" line. install and wire top AOL beacon. Installation cost increased since original quotes | N/A | N/A |
Tall Tower (greater than 500') | $210,500.00 | $0.00 | No new tower needed. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $40,185.00 | $38,665.00 | N/A | $6,770.00 | N/A |
Total for all systems | $1,995,757.00 | $1,600,811.57 | N/A | $220,987.31 | N/A |
Outside Professional Services | $40,185.00 | $38,665.00 | $6,770.00 | ||
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,050.00 | N/A | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,050.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,585.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,305.00 | N/A | N/A | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,100.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,120.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,535.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,535.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,050.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,170.00 | N/A | $3,900.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,560.00 | N/A | $900.00 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,535.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,070.00 | N/A | $1,970.00 | N/A |
Actual Information Description | File Name |
---|---|
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Prepare and or review reimbursement form | |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $26,565.00 | $26,250.00 | N/A | $0.00 | N/A |
Total for all systems | $1,995,757.00 | $1,600,811.57 | N/A | $220,987.31 | N/A |
Other Expenses | $26,565.00 | $26,250.00 | $0.00 | ||
DTV Medical Facility Notification | $11,550.00 | $11,250.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $6,800.00 | $6,800.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $2,500.00 | $2,500.00 | N/A | N/A | N/A |
MVPD Notification of Channel Change | $1,200.00 | $1,200.00 | N/A | N/A | N/A |
Endeavor Communications | $3,985.00 | $3,985.00 | Uploaded quote for tower crew to change out PR-450 element for Cloverdale (Endeavor Communications) cable headend to receive new Ch. 33. Cost of tower service | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,995,757.00 | $1,600,811.57 | $220,987.31 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Deborah A Lemon Secretary of the Board of Trustees 05/08/2019 |