(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
67766
Service:
DTV
Call Sign:
KSNF
Channel:
17 (UHF)
File Number:
0000028273
FRN:
0009961889
Date Submitted:
06/28/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

Nexstar Broadcasting, Inc.

Elizabeth Ryder

545 E. JOHN CARPENTER FREEWAY

SUITE 700

IRVING, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Elizabeth Ryder

General Counsel

Nexstar Broadcasting, Inc.

Elizabeth Ryder

545 E. John Carpenter Freeway

Suite 700

Irving, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan Replace transmitter and share new antenna and new transmission line with KODE. Acquire new interim antenna and new line for continued operation during construction and duration of assigned phase. Map and analyze tower; design and implement modifications.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model QXD1
Year 2010
Type Inductive Output Tube
IOT Power Type Single
Power Capacity 30 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model HPTV-PRLX-U12
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 20 kW
Justification for New Transmitter The manufacturer of the existing transmitter is out of business and no factory support is available for the existing transmitter. A new Comark Paragon MSDC IOT transmitter is the basis for a replacement as suggested by the FCC. See P#3812 for final equip.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 500.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Heating and Cooling
Size 15 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 720.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Additional Interior RF System

Interior RF System Existing Transmitter to Interim Transmission line

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 175.0 kW
Manufacturer
Model TFU-31JTH-R O4
Year 2010

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Broadband Panel
Number of Stations Supported 2
Number of Panels/Bays 16
Lower Limit 491.00 MHz
Upper Limit 527.00 MHz
Design power capacity in use 34.0 %
Other Antenna Type N/A
ERP: 525.0 kW
Manufacturer
Model TUM25-04-16/64H-R-1-T
Year 2018
Justification for New Antenna The existing primary antenna is a single channel slotted coaxial which cannot accommodate the assigned channel. It is considered an upgrade but should be fully reimbursable since it will be a shared antenna with KODE.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 2
Frequencies of channels supported Upper and lower frequency
Frequency 491.0 MHz - 527.0 MHz
Do you need a combiner output splitter/switcher for dual feed lines? Yes
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 8 3/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Top Plate Mods

The existing top plate will need to be studied and possibly modified to support and interface with the new top-mount antenna

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 175.0 kW
Manufacturer
Model TFU-8WB-R C160
Year 2018
Justification for New Antenna An interim antenna is necessary to keep station on the air during primary antenna replacement and for the duration of the assigned phase.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? S
Feed Line Size 4 1/16 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 4 1/16 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1090 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 1090 feet per run
Justification for New Transmission Line Transmission line will be shared with the KODE post-auction facility which will result in an overall system savings for the FCC since the stations will collocate instead of build-out independently at separate sites.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Flexible Air
Diameter 5 inches
Segment Length N/A
Other Segment Length
Number of parallel runs 1
Length 1010 feet per run
Justification for New Transmission Line An interim transmission line is necessary for the interim antenna to keep station on the air during primary antenna replacement and for the duration of the assigned phase.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1002544
Coordinates (NAD83) Latitude (NAD83) 37° 04' 33.0" N-
Longitude (NAD83) 094° 33' 17.0" W-
Overall Structure Height 1017.05 feet
Support Structure Height 948.15 feet
Ground Elevation Above Mean Sea Level (AMSL) 1039.36 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Nexstar Broadcasting, Inc.
Date Constructed 01/01/1978


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Weather Delays

Weather Delays

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 750
Explanation It will be necessary to schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399. Station does not have available personnel or personnel trained in project management for such complex projects.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service Yes
Number of Days 25
Justification It will be necessary to survey the site, plan the equipment, develop specifications for purchasing, and oversee multiple vendor RF projects. Station does not have available personnel or personnel trained in such services.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? Yes
Is Remediation needed? Yes
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Use Tax

Use tax on materials

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,068,861.00 $684,819.50 N/A $451,320.75 N/A
Total for all systems $3,830,326.00 $2,314,186.13 N/A $1,403,777.05 N/A
Primary Transmitter HPTV-PRLX-U12 $1,068,861.00 $684,819.50 $451,320.75
15 Ton system $88,400.00 $16,797.50 KSNF Shared cost with KODE FAC ID 18283; 50% cost of 12.5 ton units $8,398.75 N/A
Additional Interior RF System $140,000.00 $140,000.00 N/A $0.00 N/A
Other -- Building Addition Size: 720.0 $66,711.00 $66,711.00 Costs: 1) Electrical for new bldg is $42,500; 2) New 24x30 building is $49,672; & 3) New Ice Shield is $41,250. Total cost of $133,422. Since these are shared expenses with KODE, the shared cost is $66,711. See attached Fagan Electric, MSBI & PCI quotes $66,711.00 a
3" Rigid Conduit and Wiring (Cost per foot) $26,000.00 $24,500.00 N/A N/A N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $24,300.00 N/A N/A N/A
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW $684,000.00 $376,211.00 See Hitachi quote P#3812_PRLXU7-KSNF-080718 $376,211.00 N/A
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A $0.00 N/A

Components

Actual Information Description File Name
15 Ton system

Component Description:
HVAC, installment #1, 50% shared cost with KODE
Amount:
$8,398.75
Additional Interior RF System

Component Description:
Electrical and installation services, installment #1
Amount:
$25,950.00

Component Description:
Electrical and installation services, installment #2
Amount:
$25,950.00
Other -- Building Addition Size: 720.0

Component Description:
Electrical service to transmitter building, installment #2, shared cost with KODE FAC ID 18283.
Amount:
$10,000.00

Component Description:
Electrical service to transmitter building, installment #3, shared cost with KODE FAC ID 18283.
Amount:
$5,250.00

Component Description:
Electrical service, installment #1, 50% of invoice, shared cost with KODE FAC ID 18283.
Amount:
$6,000.00

Component Description:
Electrical services to the transmitter building - split cost with KODE
Amount:
$2,154.88

Component Description:
Balance due on completion
Amount:
$6,875.00

Component Description:
Concrete pad and ice shield, installment #1, see also use tax
Amount:
$13,750.00

Component Description:
20% deposit for contract on steel building, 50% of invoice, shared cost with KODE FAC ID 18283.
Amount:
$4,967.20

Component Description:
Progress billing, 50% share of invoice, shared cost with KODE FAC ID 18283
Amount:
$4,668.80

Component Description:
100% concrete slab, 100% building materials, progress billing; 50% of invoice, shared cost with KODE FAC ID 18283
Amount:
$15,200.00
3" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Transformer 3 phase/480v - 150 KVA Information not provided.
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW

Component Description:
Transmitter, installment #2
Amount:
$169,294.95

Component Description:
Transmitter, installment #3
Amount:
$18,810.55

Component Description:
Transmitter, installment #1
Amount:
$188,105.50
Switchgear - industrial 800 amp

Component Description:
Electrical and installation services, installment #1
Amount:
$18,150.00

Component Description:
Electrical and installation services, installment #2
Amount:
$18,150.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,150,490.00 $463,445.00 N/A $310,865.00 N/A
Total for all systems $3,830,326.00 $2,314,186.13 N/A $1,403,777.05 N/A
Interim Antenna TFU-8WB-R C160 $134,110.00 $90,420.00 $47,920.00
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized $89,400.00 $47,920.00 See Dielectric quote DMS118 $47,920.00 N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,000.00 N/A N/A N/A
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) $9,570.00 $9,100.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A
Primary Antenna TUM25-04-16/64H-R-1-T $1,016,380.00 $373,025.00 $262,945.00
Combiner output splitting/switching for dual feed lines, if applicable $126,000.00 $60,000.00 Shared expense with KODE; therefore, budgeting for $60,000 for each station. $31,285.00 N/A
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, elliptically or circularly polarized $768,000.00 $249,075.00 Antenna cost is $627,000, less VPOL $128,850 which is upgrade, not reimbursable; (see attached Dielectric Quote); however, it is a shared expense with KODE. Therefore, the cost for KSNF is $249,075. $224,167.50 N/A
Sweep test of existing antenna $6,730.00 $3,200.00 Shared expense with KODE; therefore, budgeting for $3,200 for each station. N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $40,000.00 Shared expense with KODE; therefore, budgeting for $40,000 for each station. N/A N/A
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) $18,950.00 $8,250.00 Elbow complex cost is $16,500 (see Dielectric Quote); however, it is a shared expense with KODE. Therefore, the cost for KSNF is $8,250. $7,492.50 N/A
Top Plate Mods $12,500.00 $12,500.00 Cost will be in excess of $25,000. Shared expense with KODE; therefore, budgeting for $12,500 for each station. N/A N/A

Components

Actual Information Description File Name
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized

Component Description:
45% installment due on interim antenna
Amount:
$21,564.00

Component Description:
Balance due on interim antenna
Amount:
$4,792.00

Component Description:
45% installment due prior to ship
Amount:
$21,564.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) Information not provided.
Sweep test of existing antenna Information not provided.
Combiner output splitting/switching for dual feed lines, if applicable

Component Description:
Combiner, installment #2, shared cost with KODE FAC ID 18283.
Amount:
$14,078.25

Component Description:
Combiner, installment #1, shared cost with KODE FAC ID 18283.
Amount:
$14,078.25

Component Description:
Combiner, installment #3, shared cost with KODE FAC ID 18283
Amount:
$3,128.50

Component Description:
Electrical and installation services, installment #1
Amount:
$1,850.00

Component Description:
Electrical and installation services, installment #2
Amount:
$1,850.00
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, elliptically or circularly polarized

Component Description:
KSNF share of antenna cost, installment #2; see also KODE FAC ID 18283
Amount:
$112,083.75

Component Description:
KSNF share of antenna cost, installment #1; see also KODE FAC ID 18283.
Amount:
$112,083.75
Sweep test of existing antenna Information not provided.
New combiner, cost per channel (without antenna) Information not provided.
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed)

Component Description:
KSNF share of elbow cost, installment #1; see also KODE FAC ID 18283.
Amount:
$3,746.25

Component Description:
KSNF share of elbow cost, installment #2; see also KODE FAC ID 18283
Amount:
$3,746.25
Top Plate Mods Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $540,960.00 $235,887.13 N/A $121,398.42 N/A
Total for all systems $3,830,326.00 $2,314,186.13 N/A $1,403,777.05 N/A
Interim Transmission Line $106,050.00 $101,000.00 $0.00
Flexible Air Transmission Line - dielectric, 5" $106,050.00 $101,000.00 N/A N/A N/A
Primary Transmission Line $434,910.00 $134,887.13 $121,398.42
Rigid Transmission Line - copper, 8 3/16" broadband $434,910.00 $134,887.13 Transmission Line cost is $269,774.25 (see Dielectric Quote); however, it is a shared expense with KODE. Therefore, the cost for KSNF is $134,887.13. The shared expense for larger line is less than each station independently purchasing 6-1/8" rigid line. $121,398.42 N/A

Components

Actual Information Description File Name
Flexible Air Transmission Line - dielectric, 5" Information not provided.
Rigid Transmission Line - copper, 8 3/16" broadband

Component Description:
KSNF share of transmission line cost, installment #2; see also KODE FAC ID 18283
Amount:
$59,018.46

Component Description:
KSNF share of transmission line cost, installment #2; see also KODE FAC ID 18283.
Amount:
$1,680.75

Component Description:
KSNF share of transmission line, installment #1; see also KODE FAC ID 18283
Amount:
$1,680.75

Component Description:
KSNF share of transmission line, installment #1, see also KODE FAC ID 18283.
Amount:
$59,018.46

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $705,200.00 $520,594.50 N/A $466,421.35 N/A
Total for all systems $3,830,326.00 $2,314,186.13 N/A $1,403,777.05 N/A
Primary Tower TOWER $705,200.00 $520,594.50 $466,421.35
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $12,500.00 Shared expense with KODE; therefore, budgeting for $12,500 for each station. $3,000.00 N/A
Major tower reinforcement/modifications $421,000.00 $221,089.00 Shared expense with KODE; $152,326 per quote 09201804T from Coast to Coast, attached, which is KSNF share of cost plus $10,000 initial deposit. See also FDH quote for materials KSNF share $68,763 $186,707.50 N/A
Tall Tower (greater than 500') $210,500.00 $239,605.50 See Coast to Coast quote 08261802T $105823 for interim installation and Coast to Coast quote 09201802T $133782.50 for main installation $229,313.85 N/A
Weather Delays $47,400.00 $47,400.00 Per Coast to Coast quote, $300 per day per person, based on total inclement weather days invoiced $47,400.00 N/A

Components

Actual Information Description File Name
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
Applied load check - split 50/50 with KODE
Amount:
$1,500.00

Component Description:
Structural Analysis - split 50/50 with KODE
Amount:
$1,500.00

Component Description:
Structural Analysis - split 50/50 with KODE
Amount:
$625.00

Component Description:
Structural Analysis - split 50/50 with KODE
Amount:
$625.00
Major tower reinforcement/modifications

Component Description:
Tower modification materials, installment #1, 50% of invoice shared cost with KODE
Amount:
$34,381.50

Component Description:
Tower modifications, progress billing #3
Amount:
$52,511.90

Component Description:
Tower modifications, balance due
Amount:
$15,000.00

Component Description:
Tower Modification Services, progress billing #2
Amount:
$25,000.00

Component Description:
Tower modification materials, installment #2, 50% of invoice shared cost with KODE
Amount:
$34,381.50

Component Description:
Tower Modifications, progress billing #2
Amount:
$25,000.00

Component Description:
Tower Modifications, final balance due
Amount:
$15,000.00

Component Description:
Tower Modifications, progress billing #3
Amount:
$52,511.90

Component Description:
Per vendor, deposit will be applied against final antenna installation invoice instead of Tower Mods; moving deposit to correct component
Amount:
($10,000.00)

Component Description:
Tower Modification Services, installment #1
Amount:
$49,814.10

Component Description:
Deposit as agreed per Nexstar Commitment Letter and Coast to Coast Tower Service
Amount:
$10,000.00
Tall Tower (greater than 500')

Component Description:
Interim antenna installation, installment #1
Amount:
$37,038.00

Component Description:
Interim antenna installation, installment #2
Amount:
$63,493.85

Component Description:
Main antenna installation, final installment
Amount:
$5,651.82

Component Description:
Main antenna installation, installment #3
Amount:
$30,435.51

Component Description:
Main antenna installation, installment #2;
Amount:
$45,870.79

Component Description:
Top Mount TV Antenna System installation, installment #1
Amount:
$46,823.88

Component Description:
Per vendor, deposit will be applied towards antenna installation costs instead of Tower Mods as previously submitted
Amount:
$10,000.00
Weather Delays

Component Description:
Weather delays
Amount:
$14,400.00

Component Description:
Weather delays 3.2.19 through 3.14.19
Amount:
$13,500.00

Component Description:
Weather delays 2.15.19 through 3.1.19
Amount:
$9,300.00

Component Description:
Weather delays
Amount:
$10,200.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $220,130.00 $211,750.00 N/A $44,595.00 N/A
Total for all systems $3,830,326.00 $2,314,186.13 N/A $1,403,777.05 N/A
Outside Professional Services $220,130.00 $211,750.00 $44,595.00
Project management of the transition $118,500.00 $112,500.00 N/A $30,595.00 N/A
Additional Field Engineering Service, 25 Days $62,500.00 $62,500.00 Flat fee $2,500 per site visit including expenses. N/A N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $3,000.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $7,000.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $2,500.00 N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A $1,500.00 N/A

Components

Actual Information Description File Name
Project management of the transition

Component Description:
Project management services 7.28.18 through 9.28.18
Amount:
$1,275.00

Component Description:
Project Management for Structural Analysis and Tower Modifications May 26, 2018 through June 29, 2018 including service provided by consultants Kessler and Gehman Associates for June 2018 progress report preparation.
Amount:
$825.00

Component Description:
Project Management for Structural Analysis and Tower Modifications. Services from October 27, 2017 through December 31, 2017.
Amount:
$825.00

Component Description:
Project management services May 2019
Amount:
$80.00

Component Description:
Project management services Feb 2019
Amount:
$185.00

Component Description:
Project management services Aug 2018
Amount:
$75.00

Component Description:
Project management services Nov 2018
Amount:
$50.00

Component Description:
Project management services Dec 2018
Amount:
$200.00

Component Description:
Project management services Sep 2018
Amount:
$100.00

Component Description:
Project management services Jan 2019
Amount:
$290.00

Component Description:
Project management services Oct 2018
Amount:
$550.00

Component Description:
Project management services April 2019
Amount:
$60.00

Component Description:
Project management services Jul 2018
Amount:
$100.00

Component Description:
Project management services 3.2.19 through 3.29.19
Amount:
$450.00

Component Description:
Project management services 9.29.18 through 10.26.18
Amount:
$300.00

Component Description:
Project management services 1.1.19 through 1.31.19 - items 1,2, and 4 of invoice summary
Amount:
$1,200.00

Component Description:
Project Management for Structural Analysis and Tower Modifications including consultants Kessler and Gehman Associates. Services from January 27, 2018 through February 23, 2018.
Amount:
$2,550.00

Component Description:
Project Management for Structural Analysis and Tower Modifications. Services from January 1, 2018 through January 26, 2018.
Amount:
$900.00

Component Description:
Project management services
Amount:
$11,407.82

Component Description:
Project Management services July 1, 2017 through September 29, 2017
Amount:
$1,472.18

Component Description:
Project Management for Structural Analysis and Tower Modifications. Services from June 30, 2018 through July 27, 2018.
Amount:
$1,125.00

Component Description:
Project management services 5.27.17 through 6.30.17
Amount:
$1,000.00

Component Description:
Project management services 10.27.18 through 11.30.18
Amount:
$5,500.00

Component Description:
Project management services 12.1.18 through 12.31.18
Amount:
$525.00
Additional Field Engineering Service, 25 Days Information not provided.
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Construction permit application
Amount:
$3,000.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Engineering study
Amount:
$7,000.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form

Component Description:
Prepare initial FCC 399
Amount:
$2,500.00
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization

Component Description:
Prepare request for Special Temporary Authorization - item no. 3 of invoice summary
Amount:
$1,500.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $144,685.00 $197,690.00 N/A $9,176.53 N/A
Total for all systems $3,830,326.00 $2,314,186.13 N/A $1,403,777.05 N/A
Other Expenses $144,685.00 $197,690.00 $9,176.53
Equipment Delivery and Handling Charges $25,000.00 $25,000.00 N/A $6,780.44 N/A
Use Tax $500.00 $500.00 Estimated use tax on materials $396.09 N/A
MVPD Notification of Channel Change $2,000.00 $2,000.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $1,500.00 $1,500.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $25,000.00 $25,000.00 N/A N/A N/A
AM Pattern Disturbance -- Impact study $7,890.00 $22,500.00 There are 3 AM omni stations within 3.2 kM on 1230, 1450, and 1560 kHz. N/A N/A
AM Pattern Disturbance -- Remedy $21,050.00 $60,000.00 There are 3 omni AM stations within 3.2 kM N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $2,000.00 N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
Non-zoning permits $25,000.00 $25,000.00 N/A N/A N/A
Equipment Storage $25,000.00 $25,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Equipment Delivery and Handling Charges

Component Description:
Freight only
Amount:
$457.87

Component Description:
Freight only
Amount:
$598.16

Component Description:
forklift services for the antenna - shared cost with KODE
Amount:
$261.62

Component Description:
Freight on Combiner, installment #3, shared cost with KODE FAC ID 18283
Amount:
$2,457.50

Component Description:
Freight only
Amount:
$259.29

Component Description:
Freight charged for residual on interim antenna
Amount:
$2,746.00
Use Tax

Component Description:
Use tax on materials
Amount:
$396.09
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
AM Pattern Disturbance -- Impact study Information not provided.
AM Pattern Disturbance -- Remedy Information not provided.
DTV Medical Facility Notification

Component Description:
Notification of Medical Facilities
Amount:
$2,000.00
FCC Filing Fees - Special Temporary Authorization request Information not provided.
Non-zoning permits Information not provided.
Equipment Storage Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $3,830,326.00 $2,314,186.13 $1,403,777.05

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


06/28/2019

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


06/28/2019