Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
2495
Service:
DTV
Call Sign:
KVEW
Channel:
27 (UHF)
File Number:
0000028222
FRN:
0001575497
Date Submitted:
03/01/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

APPLE VALLEY BROADCASTING, INC. Doing Business as: Apple Valley Broadcasting, Inc.

Doing Business As: APPLE VALLEY BROADCASTING, INC.

Tim A. Anderson

500 W Boone Ave

Spokane, WA 99201

United States

+1 (509) 324-4000 Tima@kxly.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Tim A Anderson

Corporate Director of Engineering

Morgan Murphy Media

Tim A. Anderson

500 West Boone Avenue

Spokane, WA 99201

United States

+1 (509) 324-4000 Tima@kxly.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Strengthen existing single tower. Mount temporary side-mount Ch 44 digital antenna and feedline to tower. Remove existing Ch 44 top mount antenna and replace with Ch 27 top mount. Prewire and plumb new Ch 27 transmitter and cut over to new Ch 27 ops.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Diamond CD
Year 2003
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 7.25 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-20
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 12.9 kW
Justification for New Transmitter Existing transmitter cannot be retuned to Repack channel.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Modifications to breaker panels and addition of a three phase AC surge suppressor. Existing generator outputs 480 volts. Replacement 208 volt 3 phase generator necessary for Ch 27 Repack transmitter.
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size Other
Other Size 6 tons
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 100.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

ULXTE-20

Invoice GO10004855-1

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 160.0 kW
Manufacturer
Model TFU-30GTH-R 04
Year 2009

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 160.0 kW
Manufacturer
Model TFU-30GTH/VP R 04
Year 2018
Justification for New Antenna Existing Ch 44 antenna is not retuneable to Ch 27 Repack frequency. The ordered antenna is an FCC-defined upsell with addition of an ATSC 3.0 vertical transmission component. Elliptical upsell and basic H pol comparative antenna quotations are attached.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 3 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 300 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 3 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 0
Length 100 feet per run
Justification for New Transmission Line Repack project requires additional in-building transmission runs to and from new transmitter, existing tower feeds and RF patching assembly.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

4 Port RF Patch Panel

Necessary to reroute transmitters between temporary side mount existing channel and new repack channel main antenna.

90 degree 3 inch Elbows

New elbows will be necessary to direct transmission line into new mask filter, RF patch and transmitter.

Dummy Load

Necessary to commission hew transmitter offline prior to the channel transition date.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1263786
Coordinates (NAD83) Latitude (NAD83) 46° 06' 11.4" N-
Longitude (NAD83) 119° 08' 00.6" W-
Overall Structure Height 271.98 feet
Support Structure Height 220.14 feet
Ground Elevation Above Mean Sea Level (AMSL) 2129.90 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner APPLE VALLEY BROADCASTING, INC.
Date Constructed 10/08/2008


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower reinforcements

Existing tower will need new structural members added to support increased weight and length of new Ch 27 Repack antenna.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 40
Explanation Tower structural engineering, on-site inspection, calculations and bound report of required modifications due to increased weight and wind load of Ch 27 antenna. Three days of on-site antenna change out tower modification management.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment Yes
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Electrical Engineer

Design, documentation and seal for Washington State Labor and Industries construction permit. Needed for transmitter building wiring modifications.

Communication Engineer

Hatfield and Dawson Engineering, Seattle, WA will assist in many areas in the preparation and implementation of this Repack rechanneling process.

Structural Engineer

TEC Engineering, Seattle, WA will assist in the upsizing of the current tower to meet the increased weight and length of the new Ch 27 antenna.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Ch 26 Stringent Digital Mask Filter

Licensed KNDU Ch 26 1st Adjacent full power station operates using a standard 4 pole full service mask filter. A full power stringent 8 pole mask will be added to that facility to protect KVEW current coverage area post repack. Includes labor.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $704,964.50 $580,464.50 N/A $452,671.84 N/A
Total for all systems $1,491,429.50 $1,170,355.71 N/A $925,838.78 N/A
Primary Transmitter ULXTE-20 $704,964.50 $580,464.50 $452,671.84
Other Electrical Service: Modifications to breaker panels and addition of a three phase AC surge suppressor. Existing generator outputs 480 volts. Replacement 208 volt 3 phase generator necessary for Ch 27 Repack transmitter. $72,000.00 $72,000.00 Local County PUD required unforeseen additional underground wiring and above ground transformers to approve and certify this project. $71,641.77 As shown on attached FCC variance form, this project required extra labor and due to local Benton Co. PUD new transformer and underground wiring to meet current electrical codes. Tax was added.
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW $494,500.00 $370,000.00 Quoted cost of transmitter sizing for comparable ATSC 1.0 operation. Station purchasing transmitter upsell capable of ATSC 3.0 operation and will expense the difference. $244,479.04 Change payment date from 4/2/2018 to 2/16/2018. See attached explanation of broadcaster upsell expense coverage certification.
Other -- HVAC Service Type: C Size:6 (Other) $12,000.00 $12,000.00 N/A $11,586.53 N/A
Other -- Building Addition Size: 100.0 $1,500.00 $1,500.00 N/A N/A N/A
ULXTE-20 $124,964.50 $124,964.50 Re-submittal of invoice and supporting electronic funds transfer, PO and quote # Q-73920 not yet reimbursed by FCC for the KVEW-TV Gatesair ULXTE-20 Ch 27 transmitter. Posted Jan. 28, 2019. $124,964.50 2/11/2019 re-submitted Gatesair GO10004855-1 invoice not yet reimbursed by the FCC for Repack Ch 27 transmitter.

Components

Actual Information Description File Name
Other Electrical Service: Modifications to breaker panels and addition of a three phase AC surge suppressor. Existing generator outputs 480 volts. Replacement 208 volt 3 phase generator necessary for Ch 27 Repack transmitter.

Component Description:
Progress payment Sierra Electric for new feeds, panels, generator set
Amount:
$6,787.50

Component Description:
Final Payment to Sierra Electric for new feeds, panels, generator set and final State inspection - Includes requested quotation.
Amount:
$64,854.27
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW

Component Description:
Final transmitter balance payment due station minus the KVEW ATSC 3.0 upgrade cost. Variance sheet attached.
Amount:
$76,266.00

Component Description:
Station down payment to vendor for replacement transmitter.
Amount:
$124,964.50

Component Description:
Gatesair KVEW Ch 27 Repack transmitter 2 of 3 invoices - prior to ship.
Amount:
$124,964.50

Component Description:
Transmitter installation, proofing, shipping and tax.
Amount:
$43,248.54
Other -- HVAC Service Type: C Size:6 (Other)

Component Description:
100% invoicing for HVAC upgrades necessary for Repack transmission plant.
Amount:
$11,586.53
Other -- Building Addition Size: 100.0 Information not provided.
ULXTE-20

Component Description:
Outstanding Invoice GO10004855-1 for Ch 27 Repack transmitter. Dated 1/22/2018. Includes cover sheet.
Amount:
$124,964.50

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $296,230.00 $340,036.21 N/A $334,510.56 N/A
Total for all systems $1,491,429.50 $1,170,355.71 N/A $925,838.78 N/A
Primary Antenna TFU-30GTH/VP R 04 $296,230.00 $340,036.21 $334,510.56
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $335,036.21 Cost quote shown is for a direct replacement Ch 27 Dielectric TFU H Pol-only ATSC 1.0 antenna. Station will expense the upsell difference for an elliptical version. $334,510.56 N/A
Sweep test of existing antenna $6,730.00 $5,000.00 N/A N/A N/A

Components

Actual Information Description File Name
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
Final antenna payment reimbursement due KVEW upon removal of upgrade amount as shown in variance attachment.
Amount:
$78,374.07

Component Description:
Down payment with order to vendor. First of three payments.
Amount:
$117,795.87

Component Description:
Gatesair / Dielectric Ch 27 Repack antenna - progress payment 2 of 3 - prior to ship
Amount:
$117,795.87

Component Description:
Dielectric Ch 27 Repack antenna shipping and storage invoice.
Amount:
$20,544.75
Sweep test of existing antenna Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $19,150.00 $23,840.00 N/A $19,038.76 N/A
Total for all systems $1,491,429.50 $1,170,355.71 N/A $925,838.78 N/A
Primary Transmission Line $19,150.00 $23,840.00 $19,038.76
Dummy Load $14,900.00 $14,900.00 Necessary to commission new Repack transmitter prior to cut-over with minimal public outage time. $14,891.33 N/A
90 degree 3 inch Elbows $2,250.00 $2,250.00 Job site transmission line routing more complex than anticipated. Required (4) 90 degree elbows. $2,202.89 N/A
Rigid Transmission Line - copper, 3 1/8" $0.00 $4,690.00 Necessary to internally replumb the RF output of the new and existing transmitters into the RF patch panel and dummy load. N/A N/A
4 Port RF Patch Panel $2,000.00 $2,000.00 N/A $1,944.54 N/A

Components

Actual Information Description File Name
Dummy Load

Component Description:
BSW - Altronic Air Cooled Dummy Load for Digital Television testing-correction to invoice addressing_02_22_19
Amount:
$14,891.33
90 degree 3 inch Elbows

Component Description:
(4) Myat 3-1/8" flanged transmission line elbows - resubmission of invoice with corrected addressing_02_22_19
Amount:
$2,202.89
Rigid Transmission Line - copper, 3 1/8" Information not provided.
4 Port RF Patch Panel

Component Description:
3 Port 3-1/8" 3 Port RF Patch Panel - resubmission of corrected invoice addressing_02_22_19
Amount:
$1,944.54

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $257,300.00 $106,450.00 N/A $103,731.00 N/A
Total for all systems $1,491,429.50 $1,170,355.71 N/A $925,838.78 N/A
Primary Tower TOWER $257,300.00 $106,450.00 $103,731.00
Structural engineering tower load study for well documented tower $12,600.00 $11,950.00 On site engineering monitoring necessary during tower modifications due to sloping terrain at tower site. $22,650.00 Early estimated cost was based upon more minor structural tower modifications. Final quote and invoicing included design of additional bracing, on-site inspections and special additional temporary rigging calculations. These were safety requirements.
Tower reinforcements $2,500.00 $2,500.00 N/A N/A N/A
Short Tower (less than 500') $84,200.00 $82,000.00 Weather delays and additional tower reinforcements necessary at the time of erection. $81,081.00 Tower wiring, weather delays and additional structural tower bracing required.
Minor tower reinforcement/modifications $158,000.00 $10,000.00 Minor hardware upgrades or replacements necessary during change out of top mounted antennas. N/A N/A

Components

Actual Information Description File Name
Structural engineering tower load study for well documented tower

Component Description:
KVEW-TV Repack Tower Engineering Company - tower studies and planning, invoice 2489.
Amount:
$5,500.00

Component Description:
KVEW-TV Repack Tower Engineering Company - tower studies and planning, invoice 2726 with completed variance sheet.
Amount:
$5,000.00

Component Description:
KVEW-TV Repack Tower Engineering Company tower studies and planning, invoice 2546.
Amount:
$5,040.00

Component Description:
N/A
Amount:
N/A

Component Description:
KVEW-TV Repack Tower Engineering Company - tower studies and planning invoice 2725.
Amount:
$7,110.00
Tower reinforcements Information not provided.
Short Tower (less than 500')

Component Description:
Tower reinforcements, Repack Ch 27 replacement for existing Ch 44 antenna and guy re-tensioning.
Amount:
$81,081.00
Minor tower reinforcement/modifications Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $151,355.00 $63,700.00 N/A $0.00 N/A
Total for all systems $1,491,429.50 $1,170,355.71 N/A $925,838.78 N/A
Outside Professional Services $151,355.00 $63,700.00 $0.00
Structural Engineer $5,000.00 $5,000.00 N/A $0.00 The KVEW tower had unanticipated structural modifications needed in the antenna change out process.
Communication Engineer $0.00 $0.00 N/A N/A N/A
Electrical Engineer $2,500.00 $2,500.00 N/A N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $23,000.00 N/A N/A N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $225.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $225.00 N/A N/A N/A
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet $10,520.00 $0.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,000.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $1,500.00 N/A $0.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $2,000.00 N/A N/A N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $1,500.00 Engineering time and Per Diem to meet with Ch 26 engineering staff and coordinate installation of new Ch 26 stringent mask filter at their facility. N/A N/A
Project management of the transition $6,320.00 $6,000.00 Manufacture's on-site engineering to assist in assembly, configuring, commissioning and collection of data for final proof of performance on Repack channel. N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A

Components

Actual Information Description File Name
Structural Engineer

Component Description:
Delete this request. It was applied for in the Tower Equipment and Rigging Costs section.
Amount:
($5,500.00)

Component Description:
Delete this request. It was applied for in the Tower Equipment and Rigging Costs section.
Amount:
($5,040.00)

Component Description:
TEC tower structural engineering analysis and reports - progress invoice #2
Amount:
$5,040.00

Component Description:
TEC tower structural engineering progress payment #1
Amount:
$5,500.00
Communication Engineer Information not provided.
Electrical Engineer Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
H&D Engineers - KVEW Repack progress invoice #6
Amount:
$956.25
Perform engineering study for new channel assignment and antenna development Information not provided.
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Project management of the transition Information not provided.
Prepare and or review reimbursement form Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $62,430.00 $55,865.00 N/A $15,886.62 N/A
Total for all systems $1,491,429.50 $1,170,355.71 N/A $925,838.78 N/A
Other Expenses $62,430.00 $55,865.00 $15,886.62
Ch 26 Stringent Digital Mask Filter $28,000.00 $28,000.00 Necessary 8 pole Stringent Full Service Mask Filter upgrade for KNDU Ch 26 4 pole full service mask facility to preserve the current coverage area of repacked KVEW at Ch 27. Includes installation. $15,886.62 N/A
MVPD Notification of Channel Change $1,800.00 $1,800.00 Local newspaper publication notifications. N/A N/A
Develop and air announcement of upcoming channel change $10,350.00 $10,350.00 Production of spot, $350. Airtime for 300 - 30 second announcements, $10,000. N/A N/A
Equipment Storage $3,000.00 $3,000.00 Antenna manufacturer completed assembly of antenna prior to the date of available tower crews. Station studio and transmitter site do not have large enough secure areas to store vulnerable equipment on-site. Antenna securely stored near manufacturer. N/A N/A
Equipment Delivery and Handling Charges $6,200.00 $6,200.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $500.00 $500.00 N/A N/A N/A
Non-zoning permits $500.00 $500.00 Electrical rewiring permitting at transmitter site required by state. N/A N/A
DTV Medical Facility Notification $11,550.00 $5,000.00 Labor, survey, call back, develop addressing for mailings. Logging and tracking outreach. N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A

Components

Actual Information Description File Name
Ch 26 Stringent Digital Mask Filter

Component Description:
KVEW Adjacent Channel Digital Mask Filter - Final Progress Payment
Amount:
$10,273.92

Component Description:
Payment - Adjacent Channel Mask Filter
Amount:
$7,943.31

Component Description:
Down payment with order for 8 pole critical full service mask filter. First of three invoices.
Amount:
$7,943.31
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage Information not provided.
Equipment Delivery and Handling Charges Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
Non-zoning permits Information not provided.
DTV Medical Facility Notification Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $1,491,429.50 $1,170,355.71 $925,838.78

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

TIM A ANDERSON

Corp. Director of Engineering


03/01/2019

Attachments