FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
82476
Service:
DTV
Call Sign:
KLWB
Channel:
17 (UHF)
File Number:
0000028053
FRN:
0014881114
Date Submitted:
02/08/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WILDERNESS COMMUNICATIONS, LLC

Doing Business As: WILDERNESS COMMUNICATIONS, LLC

3501 NORTHWEST EVANGELINE THRUWAY

CARENCRO, LA 70520

United States

+1 (337) 896-1600 beth@delta-network.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Arthur Lee Clardy , III .

Director of Engineering

Delta Media Corporation

Lee Clardy

3501 NW Evangeline Thwy

Carencro, LA 70520

United States

+1 (337) 896-2601 lclardy@deltamediacorp.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan Existing CH 50 RF system and waveguide is not capable of re-tuning to new channel. Existing transmitter is no longer supported by manufacturer. Need to purchase new antenna, transmission line, RF filters and transmitter.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model CST II
Year 2002
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 60 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model Parallax U15
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 24.3 kW
Justification for New Transmitter Advanced Broadcast Systems is no longer providing support for the existing transmitter.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring Yes
Size 1.5 inches
Length 150.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 10 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

State and Local Sales Taxes

Purchase of new equipment is subject to Louisiana state and local sales tax rate of 9%

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-31JTH-6T180
Year 2004

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-21ETT/VP-R 4CT170
Year 2018
Justification for New Antenna Existing channel 50 antenna is not capable of being re-tuned or re-manufactured for channel 17.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

State and Local Sales Taxes

Purchase of new equipment is subject to Louisiana state and local sales tax rate of 9%

Shipping from Raymond ME

Shipping and handling charges

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-24WB-1-R S230
Year 2018
Justification for New Antenna Interim antenna for use to maintain broadcasts over the air during the replacement of main antenna.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? B
Feed Line Size 4 1/16 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Waveguide
Diameter N/A
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 1100 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1100 feet per run
Justification for New Transmission Line The existing channel 50 waveguide is not compatible for use on channel 17.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Fine Matcher Section

A fine matching tuner section is required to properly adjust the transmission line for the lowest return loss, thereby increasing the efficiency of the transmission line from transmitter to the antenna

Dehydrator System

The existing dehydrator is not compatible for use with rigid transmission line. The interim needs to be pressurized also.

Interim Transmission Line

Additional transmission line for use with interim antenna

Shipping and Handling

Shipping and Handling Charges from Dielectric Raymond, Maine

State and Local Sales Taxes

Purchase of new equipment is subject to Louisiana state and local sales tax rate of 9%

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Flexible Air
Diameter 4 inches
Segment Length N/A
Other Segment Length
Number of parallel runs 1
Length 800 feet per run
Justification for New Transmission Line Needed for use with interim antenna to maintain over the air broadcasts during the replacement of the main antenna.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1251823
Coordinates (NAD83) Latitude (NAD83) 30° 20' 33.0" N-
Longitude (NAD83) 091° 57' 46.6" W-
Overall Structure Height 1025.91 feet
Support Structure Height 966.20 feet
Ground Elevation Above Mean Sea Level (AMSL) 22.97 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Delta Media Corp.
Date Constructed 05/01/2006

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
349 KDCG-CD DTV
33220 KOGM FM
183335 KLWB-FM FM

Other Types of Users

Users
Wi-Fi Network
Two-way radio

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Road Preparation

One-mile ingress and egress must be made capable of handling heavy truck transportation into and out of the tower site.

Staging Area Preparation

Staging area has to be prepared for tower rigging to hoist old antenna and waveguide down and hoist new antenna and transmission line up.

All-terrain Personnel Lift

Will require the rental of an all- terrain personnel lift (man-lift) in order to remove the waveguide from horizontal supports (ice bridge). Then will require the use of it to install new transmission line into the horizontal supports.

Crane and Crane Operator

Will require the rental of a crane to lift the new antenna off the truck transportation at the site. Then place the antenna in position for rigging and hoisting.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 200
Explanation Wilderness Communications engineering staff also works for 16 stations licensed to different licensees and significant project management assistance will be required.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

General Contractor

A Louisiana licensed and insured commercial general contractor will be retained to provide project management as well as general construction services for this project.

Outside Accounting Services

An independent accounting firm to provide oversight and assistance with compliance and reporting as required for this project.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,141,972.00 $1,089,922.00 N/A $994,544.98 N/A
Total for all systems $2,954,310.00 $2,806,560.00 N/A $1,751,010.68 N/A
Primary Transmitter Parallax U15 $1,141,972.00 $1,089,922.00 $994,544.98
State and Local Sales Taxes $87,822.00 $87,822.00 N/A $79,637.13 N/A
10 Ton system $38,900.00 $37,000.00 N/A N/A N/A
1.5" Rigid Conduit and Wiring $4,500.00 $4,500.00 N/A N/A N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $24,300.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A $14,907.85 N/A
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW $947,000.00 $900,000.00 N/A $900,000.00 N/A

Components

Actual Information Description File Name
State and Local Sales Taxes

Component Description:
9% State and Local Sales Taxes associated with the 10% Payment for this invoice
Amount:
$7,963.71

Component Description:
9% State and Local Sales Taxes associated with the 30% Payment for this invoice
Amount:
$23,891.14

Component Description:
Louisiana State and Local 9% Sales Tax on transmitter purchase
Amount:
$47,782.28
10 Ton system Information not provided.
1.5" Rigid Conduit and Wiring Information not provided.
Transformer 3 phase/480v - 150 KVA Information not provided.
Switchgear - industrial 800 amp

Component Description:
Invoice for electrical components needed to modify existing distribution panel for accommodate electrical connections for new transmitter
Amount:
$5,160.57

Component Description:
Electrical components needed to relocate existing 480 VAC services from the existing distribution panel to the new 480 VAC distribution panel
Amount:
$1,917.56

Component Description:
Electrical components for new 480 VAC distribution panel needed to service the new transmitter electrical subsystems
Amount:
$7,829.72
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW

Component Description:
30% Due (7) Days Prior to Shipment of transmitter
Amount:
$270,000.00

Component Description:
10% Payment Due to Hitachi Comark Upon Proof of Performance
Amount:
$90,000.00

Component Description:
60% of the contract price is due to the manufacturer
Amount:
$540,000.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $634,844.00 $527,624.00 N/A $182,814.49 N/A
Total for all systems $2,954,310.00 $2,806,560.00 N/A $1,751,010.68 N/A
Interim Antenna TFU-24WB-1-R S230 $282,990.00 $280,700.00 $0.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,000.00 N/A N/A N/A
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) $10,950.00 $10,400.00 N/A N/A N/A
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, horizontally polarized $236,900.00 $236,900.00 Please see attached quotation for side mounted antenna N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A
Primary Antenna TFU-21ETT/VP-R 4CT170 $351,854.00 $246,924.00 $182,814.49
Shipping from Raymond ME $25,000.00 $25,000.00 N/A $7,631.29 N/A
State and Local Sales Taxes $18,324.00 $18,324.00 N/A N/A N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $185,500.00 Wilderness elected to purchase an upgraded antenna per paragraph 624 of the Broadcast Incentive Auction Report and Order. The attachment provided is a quotation for a horizontally polarized antenna plus a line item for the vertical component. $159,537.60 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $5,760.00 N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $11,700.00 N/A $9,885.60 N/A

Components

Actual Information Description File Name
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) Information not provided.
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, horizontally polarized Information not provided.
Sweep test of existing antenna Information not provided.
Shipping from Raymond ME

Component Description:
Invoice from Dielectric for antenna shipping charges from Raymond Maine along with supporting documentation
Amount:
$7,631.29
State and Local Sales Taxes Information not provided.
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
45% Installment Payment Prior to Shipment per payment terms
Amount:
$79,768.80

Component Description:
45% Installment Payment with order
Amount:
$79,768.80
Sweep test of existing antenna

Component Description:
45% Installment Payment Prior to Shipment for Antenna Sweep Testing per payment terms
Amount:
$2,880.00

Component Description:
45% Installment Payment with order
Amount:
$2,880.00
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
45% Installment Payment with order
Amount:
$4,942.80

Component Description:
45% Installment Payment Prior to Shipment per payment terms
Amount:
$4,942.80

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $328,420.00 $314,220.00 N/A $183,938.81 N/A
Total for all systems $2,954,310.00 $2,806,560.00 N/A $1,751,010.68 N/A
Interim Transmission Line $59,200.00 $56,000.00 $0.00
Flexible Air Transmission Line - dielectric, 4" $59,200.00 $56,000.00 N/A N/A N/A
Primary Transmission Line $269,220.00 $258,220.00 $183,938.81
State and Local Sales Taxes $21,620.00 $21,620.00 N/A N/A N/A
Rigid Transmission Line - copper, 6 1/8" $222,200.00 $211,200.00 N/A $173,794.40 N/A
Fine Matcher Section $3,900.00 $3,900.00 N/A $3,855.89 N/A
Shipping and Handling $6,500.00 $6,500.00 N/A $6,288.52 N/A
Interim Transmission Line $10,000.00 $10,000.00 N/A N/A N/A
Dehydrator System $5,000.00 $5,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Flexible Air Transmission Line - dielectric, 4" Information not provided.
State and Local Sales Taxes Information not provided.
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Dielectric invoice for outstanding balance of rigid transmission line
Amount:
$27,380.96

Component Description:
45% Installment Payment Prior to Shipment per payment terms
Amount:
$1,767.60

Component Description:
45% Installment Payment Prior to Shipment per payment terms
Amount:
$71,439.12

Component Description:
45% Installment Payment with order
Amount:
$1,767.60

Component Description:
45% Installment Payment with order
Amount:
$71,439.12
Fine Matcher Section

Component Description:
Invoice for AFM 6-75, fine matcher section. Cost plus freight, shipping and handling.
Amount:
$3,855.89
Shipping and Handling

Component Description:
Invoice from Dielectric for transmission line and accessories shipping charges from Raymond Maine along with supporting documentation
Amount:
$6,288.52
Interim Transmission Line Information not provided.
Dehydrator System Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $534,119.00 $565,019.00 N/A $322,634.00 N/A
Total for all systems $2,954,310.00 $2,806,560.00 N/A $1,751,010.68 N/A
Primary Tower TOWER $534,119.00 $565,019.00 $322,634.00
Staging Area Preparation $58,991.00 $58,991.00 Please see attached vendor quotation for staging area preparation $58,991.00 Additional expense incurred due to unforeseen soil conditions for construction of work site pad at tower site on Wilderness Trail, Carencro, LA
Tall Tower (greater than 500') $210,500.00 $250,000.00 Estimate from Bell Tower Corp includes rigging the tower, removal of existing antenna and waveguide, install new antenna, transmission line along with minor modifications to the tower. Please see attachment - Bell Tower Quote - WT Tower Work - KLWB $185,850.00 N/A
Structural engineering tower load study for well documented tower $12,600.00 $12,000.00 N/A $700.00 N/A
Road Preparation $76,528.00 $76,528.00 Please see attached quotation. $76,528.00 N/A
All-terrain Personnel Lift $2,500.00 $2,500.00 N/A N/A N/A
Minor tower reinforcement/modifications $158,000.00 $150,000.00 N/A N/A N/A
Crane and Crane Operator $15,000.00 $15,000.00 N/A $565.00 N/A

Components

Actual Information Description File Name
Staging Area Preparation

Component Description:
Additional work site pad expense due to unforeseen soil issues-KLWB
Amount:
$6,977.50

Component Description:
Partial bill for work pad site prep for KLWB TV
Amount:
$26,650.00

Component Description:
Work Site Pad Prep for KLWB TV
Amount:
$32,341.00
Tall Tower (greater than 500')

Component Description:
Bell Tower Invoice - second 25% Due for tower services
Amount:
$61,950.00

Component Description:
Bell Tower Invoice - third 25% due for tower services
Amount:
$61,950.00

Component Description:
Invoice for 25% Due with acceptance of proposal order for tower work
Amount:
$61,950.00
Structural engineering tower load study for well documented tower

Component Description:
Engineer services for 952' tv tower
Amount:
$400.00

Component Description:
Engineering drawings for 952' tower in Lafayette, LA
Amount:
$300.00
Road Preparation

Component Description:
Partial billing for KLWB TV road preparation
Amount:
$27,056.00

Component Description:
Road Prep for KLWB TV-420
Amount:
$49,472.00
All-terrain Personnel Lift Information not provided.
Minor tower reinforcement/modifications Information not provided.
Crane and Crane Operator

Component Description:
Invoice for crane rental to needed to offload antenna from flatbed trailer.
Amount:
$565.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $226,375.00 $221,750.00 N/A $38,480.00 N/A
Total for all systems $2,954,310.00 $2,806,560.00 N/A $1,751,010.68 N/A
Outside Professional Services $226,375.00 $221,750.00 $38,480.00
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A $0.00 N/A
Outside Accounting Services $7,500.00 $7,500.00 N/A $555.00 N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $7,000.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $1,425.00 N/A
Prepare request for Special Temporary Authorization $2,050.00 $3,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A $725.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 N/A N/A N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A N/A N/A
General Contractor $35,000.00 $35,000.00 Please see attachment with copy State of Louisiana contractors License including statement that a contractor is required by state law. $35,000.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $775.00 N/A
Project management of the transition $31,600.00 $30,000.00 N/A N/A N/A

Components

Actual Information Description File Name
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application

Component Description:
Please disregard original invoice submission. It was entered into the wrong category.
Amount:
N/A
Outside Accounting Services

Component Description:
Accounting services split between 2 facilities
Amount:
$555.00
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
RF Consulting Engineer Fee prepare engineer section FCC Form 2100, Construction Permit App
Amount:
$1,425.00
Prepare request for Special Temporary Authorization Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application

Component Description:
Invoice for preparation of engineering portions and related exhibits of STA request for KLWB channel 17 interim antenna
Amount:
$725.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.
RF Exposure Measurements Information not provided.
General Contractor

Component Description:
Contractor Svces provided for Construction of road and stage area prep-KLWB
Amount:
$35,000.00
Perform engineering study for new channel assignment and antenna development

Component Description:
RF Consulting Engineer Fees for study for new channel assignment
Amount:
$775.00
Project management of the transition Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $88,580.00 $88,025.00 N/A $28,598.40 N/A
Total for all systems $2,954,310.00 $2,806,560.00 N/A $1,751,010.68 N/A
Other Expenses $88,580.00 $88,025.00 $28,598.40
Develop and air announcement of upcoming channel change $2,500.00 $2,500.00 N/A N/A N/A
Equipment Storage $15,000.00 $15,000.00 N/A $2,940.00 N/A
Equipment Delivery and Handling Charges $35,000.00 $35,000.00 N/A $22,286.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $15,000.00 $15,000.00 N/A $3,172.40 N/A
Non-zoning permits $5,000.00 $5,000.00 N/A N/A N/A
Local Zoning $1,500.00 $1,500.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $200.00 The FCC filing fees for an STA is $200.00. $200.00 I would have to conclude that the filing fee was increased between the time the form 399 was originally filed and the filing for the STA.
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A N/A N/A
MVPD Notification of Channel Change $2,500.00 $2,500.00 N/A N/A N/A

Components

Actual Information Description File Name
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage

Component Description:
Dielectric invoice for storage charges for new antenna. This charge occurred because of scheduling conflicts with the delivery date and having the tower crew on site to supervise the offloading of the antenna.
Amount:
$2,940.00
Equipment Delivery and Handling Charges

Component Description:
Shipping, Offloading and Placement
Amount:
$13,371.60

Component Description:
Shipping, offloading and placement charges for transmitter
Amount:
$2,228.60

Component Description:
Shipping, Off-loading and placement for transmitter
Amount:
$6,685.80
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Charges for chemical waste disposal of heat transfer fluid and transformer oil used in old KLWB channel 50 transmitter
Amount:
$3,172.40
Non-zoning permits Information not provided.
Local Zoning Information not provided.
FCC Filing Fees - Special Temporary Authorization request

Component Description:
FCC STA filing fee
Amount:
$200.00
FCC Filing Fees - Form 2100 license to cover application Information not provided.
DTV Medical Facility Notification Information not provided.
MVPD Notification of Channel Change Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,954,310.00 $2,806,560.00 $1,751,010.68

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Arthur Lee Clardy , III .

Director of Engineering


02/08/2019

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Arthur Lee Clardy , III .

Director of Engineering


02/08/2019

Attachments

Back to Top