(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
66185
Service:
DTV
Call Sign:
WOSU-TV
Channel:
16 (UHF)
File Number:
0000028867
FRN:
0006031983
Date Submitted:
01/18/2019

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

THE OHIO STATE UNIVERSITY

Doing Business As: THE OHIO STATE UNIVERSITY

2400 OLENTANGY RIVER ROAD

COLUMBUS, OH 43210

United States

+1 (614) 292-9678 Tom.Rieland@wosu.org Government Entity

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Purchase new transmitter, antenna and transmission line. Lease interim side-mount ch 38 antenna, use existing line to maintain service while top-mount is removed and new antenna, transmitter and line installed. See attached Transition Plan.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model CD3200P2
Year 2003
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 42 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-50
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 31.7 kW
Justification for New Transmitter Current Sigma CD not frequency agile. Gates advises with re-tuning components likely not available, major-frequency change should not be considered given age, age or cost of IOTs, need for new mask filter and other RF equipment.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 40.0 feet
Other Electrical Service Yes
Description Reworking of existing electrical system to rewire main fused disconnect box to protect new transmitter by on-site generator. New distribution panel to feed power cooling transformer.
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 120.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Liquid Cooling System Items

These Items not included in transmitter quote. Includes indoor pump modules for multiple PUs, outdoor heat exchangers and coolant. Placed as additional cost because HVAC question was oriented to air-cooled systems.

Exciters

2 Gates XTT Multi-Standard Exciter. WOSU currently has two exciters that will not work with new transmitter.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 511.0 kW
Manufacturer
Model TFU-20GTH-RO4
Year 2003

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 311.0 kW
Manufacturer
Model ATW15H3-HTO-16H
Year 2017
Justification for New Antenna Existing top-mount channel 38 antenna is not frequency agile and cannot be re-tuned to new ch 16 assignment.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Custom Top Plate

Interface for attachment of new antenna to non-standard tower. Existing antenna also required custom plate.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Rent Temporary
Ownership Leased
Owner ERI
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 25.0 kW
Manufacturer
Model ATW-2G
Year 2017
Justification for New Antenna Rental of temporary ch 38 antenna for up to three months to maintain service while existing top-mount antenna and top plate are removed, new top plate and ch 16 antenna installed.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? No

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1190 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 3/4 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1240 feet per run
Justification for New Transmission Line Existing line will be used for interim antenna to maintain service on ch38. Existing line dates to 2003, has been repaired and segments replaced. After interim antenna removed, line will be capped for use with a future backup ch16 ant. (not in proposal)

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Transmission Line System Design

Initial system design, plus on-site tech visit for final deliverable

Ice Bridge

Replacement/additional 150' ice bridge to support and protect new transmission line. Existing bridge is overloaded, in questionable shape and not well-supported. See Site Survey attachment and ERI Transmission Bridge Quote

Line Dehydrator

Andrew Dryline low-pressure dehydrator for transmission line.

Sweep and Tune

System sweep, tune and test after installation.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1054358
Coordinates (NAD83) Latitude (NAD83) 40° 09' 33.0" N-
Longitude (NAD83) 082° 55' 23.0" W-
Overall Structure Height 1106.94 feet
Support Structure Height 1067.90 feet
Ground Elevation Above Mean Sea Level (AMSL) 920.92 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner OHIO STATE UNIVERSITY DBA = WOSU STATIONS
Date Constructed 01/01/1973


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Mapping

Confirmation mapping to provide current status in preparation of rigorous tower analysis.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 150
Explanation WOSU only maintains a three-person engineering staff to deal with three television transmitters and six radio stations, as well as all other technology issues in our aging building. We are very tight on staff time, especially for large projects,
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers No
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Additional Legal Expenses

Additional expenses for advice and counsel on repack for University-owned public TV station operating "sole service" PBS station in Columbus market.

Quarterly Progress Reports

Prepare and file FCC-required Quarterly Progress Reports on Schedule 387 during station repack process.

Transmitter Site Site Survey

Comprehensive transmitter site survey and report by Gates Air specifying needs and providing recommendations (see as attachment)

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? No
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,047,531.44 $1,045,611.44 N/A $0.00 N/A
Total for all systems $2,706,762.44 $2,481,742.44 N/A $30,312.45 N/A
Primary Transmitter ULXTE-50 $1,047,531.44 $1,045,611.44 $0.00
Exciters $30,000.00 $30,000.00 WOSU currently maintains a two-exciter system with automatic switchover. Current exciters will not work with new transmitter. This request is for a new primary and backup. N/A N/A
Liquid Cooling System Items $28,651.44 $28,651.44 Items include pump modules, outdoor heat exchangers, plumbing and coolant. These items not included in transmitter estimate. See Gates Air Quote-Form 399 Documentation N/A N/A
Other -- Building Addition Size: 120.0 $25,000.00 $25,000.00 Approximately 120' sqft space outside building to protect heat exchangers/pumps for new cooling system. Project includes design, pad and ice-protective building overhang. Had estimated $100k, unable to obtain actual quote from university in 5 day window. N/A N/A
Other Electrical Service: Reworking of existing electrical system to rewire main fused disconnect box to protect new transmitter by on-site generator. New distribution panel to feed power cooling transformer. $25,000.00 $25,000.00 Panel, parts and installations. Unable to provide actual estimates to support higher figure because needs will not be finalized until actual installation. N/A N/A
3" Rigid Conduit and Wiring (Cost per foot) $2,080.00 $1,960.00 N/A N/A N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $35,000.00 480T0208-150KVA-480vv, three phase transformer Delta primary, parallel surge suppressor for Delta, various installation items N/A N/A
UHF - Liquid Cooled Solid State Transmitter 31.7 kW $900,000.00 $900,000.00 Will include transmitter control, PA power blocks, mask filter system and hardware, plus proof. Does not include exciters. N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $424,680.00 $305,600.00 N/A $6,400.00 N/A
Total for all systems $2,706,762.44 $2,481,742.44 N/A $30,312.45 N/A
Interim Antenna ATW-2G $138,650.00 $32,500.00 $0.00
UHF - High Power, Side Mount, basic slot antenna, 25 kW input, directional,, horizontally polarized $0.00 $0.00 This is a correct description, however costs reflected in lease numbers listed on this page. N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $7,500.00 Lease for use with interim antenna N/A N/A
Interim antenna rental and installation - Cost will depend on antenna size and height and/or complexity of tower. $115,500.00 $25,000.00 Three-month lease of 25kW side-mount antenna to maintain channel 38 service during installation of new ch 16 antenna and feed line. Cost includes installation, overnight-connection to existing line and removal at end of project. N/A N/A
Primary Antenna ATW15H3-HTO-16H $286,030.00 $273,100.00 $6,400.00
Sweep test of existing antenna $6,730.00 $6,400.00 Sweep of the full RF system was included in Gates Air Site Survey (included in attachments). Has already been completed. $6,400.00 N/A
Custom Top Plate $20,000.00 $20,000.00 To attach new antenna to non-standard tower top. Current antenna also required custom plate. N/A N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $11,700.00 N/A N/A N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized $247,000.00 $235,000.00 N/A N/A N/A

Components

Actual Information Description File Name
UHF - High Power, Side Mount, basic slot antenna, 25 kW input, directional,, horizontally polarized Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Interim antenna rental and installation - Cost will depend on antenna size and height and/or complexity of tower. Information not provided.
Sweep test of existing antenna

Component Description:
Existing line sweep included as part of site survey invoice without breakdown (site survey was 12,002.45)
Amount:
$6,400.00
Custom Top Plate Information not provided.
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) Information not provided.
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $355,645.00 $335,165.00 N/A $0.00 N/A
Total for all systems $2,706,762.44 $2,481,742.44 N/A $30,312.45 N/A
Primary Transmission Line $355,645.00 $335,165.00 $0.00
Sweep and Tune $8,200.00 $8,200.00 Sweep, tune and test, two days mobilization, use of test equipment. N/A N/A
Line Dehydrator $10,970.00 $10,970.00 Line protection alternative to nitrogen pressure system. N/A N/A
Ice Bridge $77,245.00 $77,245.00 Materials and installation costs for 150-foot ice/t bridge from transmitter building to tower. Current bridge will not support both new and existing lines. Quote higher than original estimate because estimater used wrong size line. See ERI Bridge Quote. N/A N/A
Transmission Line System Design $8,750.00 $8,750.00 includes preliminary layout, then site visit for definitive line layout N/A N/A
Rigid Transmission Line - copper, 6 1/8" $250,480.00 $230,000.00 Full system including hangers, etc. N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $647,850.00 $611,750.00 N/A $8,250.00 N/A
Total for all systems $2,706,762.44 $2,481,742.44 N/A $30,312.45 N/A
Primary Tower TOWER $647,850.00 $611,750.00 $8,250.00
Structural engineering tower load study for well documented tower $12,600.00 $8,000.00 N/A $4,500.00 N/A
Tower Mapping $3,750.00 $3,750.00 Tower mapping to confirm status in preparation for structural study. Was completed by George Fitz Antenna Service. $3,750.00 For purpose of reimbursement, total only included on invoice component, not with quote or purchase order
Tall Tower (greater than 500') $210,500.00 $200,000.00 Mobilization, rigging, removal of current antenna, installation of new antenna and transmission line. Does not include costs for installation and removal of interim antenna. N/A N/A
Major tower reinforcement/modifications $421,000.00 $400,000.00 Tower structural analysis indicates that reinforcement will be required in at least 12 bays, plus tower base must be reinforced with additional concrete to meet G standards. Does not create additional capacity beyond line and antenna needs for project. N/A N/A

Components

Actual Information Description File Name
Structural engineering tower load study for well documented tower

Component Description:
Second half of payment for Structural Analysis- PO and proposal already on file
Amount:
$2,250.00

Component Description:
Package included initial proposal, purchase order and revised invoice (and explanation of name discrepancy). No dollar amount included here to prevent duplication in total.
Amount:
N/A

Component Description:
Initial downpayment for WOSU-TV tower analysis
Amount:
$2,250.00
Tower Mapping

Component Description:
Full cost of initial tower mapping
Amount:
$3,750.00

Component Description:
Purchase order for tower mapping. Invoice already on file. Only entering dollar total with invoice so total not duplicated.
Amount:
N/A

Component Description:
Original quote from Antenna Service Company for tower mapping-PO and invoice on file. Total for reimbursement on invoice.
Amount:
N/A
Tall Tower (greater than 500') Information not provided.
Major tower reinforcement/modifications Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $167,193.00 $119,753.00 N/A $15,662.45 N/A
Total for all systems $2,706,762.44 $2,481,742.44 N/A $30,312.45 N/A
Outside Professional Services $167,193.00 $119,753.00 $15,662.45
Transmitter Site Site Survey $12,003.00 $12,003.00 Survey was conducted by Gates Air to inform planning. Total survey cost was $18,403, however $6400 RF sweep was broken out for inclusion in antenna section. $12,002.45 N/A
Quarterly Progress Reports $5,000.00 $5,000.00 Prepare and file FCC-required Quarterly Progress Reports on Schedule 387 during station repack process. N/A N/A
Additional Legal Expenses $10,000.00 $10,000.00 Additional legal expenses for advice and counsel on repack transition for University-owned public broadcasting operation providing "sole service" PBS station in Columbus, OH market N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $40,000.00 N/A N/A N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $1,575.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $2,085.00 N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A
Project management of the transition $23,700.00 $22,500.00 Estimating 150 hours at $150 per hour N/A N/A

Components

Actual Information Description File Name
Transmitter Site Site Survey

Component Description:
Additional $6400 in invoice, PO and estimate totals is for existing line sweep
Amount:
$12,002.45
Quarterly Progress Reports Information not provided.
Additional Legal Expenses Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare request for Special Temporary Authorization Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Preparation of initial engineering section of FCC Form 2100: (3) Principal Engineering Hours @ $285/hr (3) Sr. Engineering Hours @ $240/hr
Amount:
$1,575.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Initial engineering study for new channel assignment: (3) Principal Engineering Hrs @ $285/hr (4.25) Sr. Engineering Hrs @ $240/hr (1) Engineering Hours @ $210/hr
Amount:
$2,085.00
Prepare and or review reimbursement form Information not provided.
Project management of the transition Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $63,863.00 $63,863.00 N/A $0.00 N/A
Total for all systems $2,706,762.44 $2,481,742.44 N/A $30,312.45 N/A
Other Expenses $63,863.00 $63,863.00 $0.00
MVPD Notification of Channel Change $2,500.00 $2,500.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $8,000.00 $8,000.00 Including production and broadcast N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $31,213.00 $31,213.00 Includes decommission and removal of old transmitter from building, removal of transmitter and old antenna from the site. See Gates Air Form 399 Documentation quote. N/A N/A
Equipment Delivery and Handling Charges $20,000.00 $20,000.00 Shipping, handling and placement. N/A N/A
Non-zoning permits $1,750.00 $1,750.00 County and State permits and inspections N/A N/A
Local Zoning $400.00 $400.00 Genoa township zoning (construction) permits and inspections. N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,706,762.44 $2,481,742.44 $30,312.45

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Michael Papadakis

Interim Senior Vice President


01/18/2019

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Michael Papadakis

Interim Senior Vice President


01/18/2019