Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
KTBU LICENSING, INC. Doing Business As: KTBU LICENSING, INC. |
Spanish Broadcasting System, Inc. 7007 NW 77TH AVE. MIAMI, FL 33166 United States |
+1 (305) 441-6901 | licensemanagement@sbscorporate.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Nancy Ory , Esq . Lerman Senter PLLC |
2001 L St NW Suite 400 Washington, DC 20036 United States |
+1 (202) 416-6791 | nory@lermansenter.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | KTBU will transition to a temporary side mount antenna at the current tower site while the old antenna is removed and a new top mount broad-band antenna is installed. KTBU will purchase and install a new transmitter to operate on channel 33. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | HP60DDP | |
Year | 2006 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 60 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | THU9-36 EVO | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 55 kW | |
Justification for New Transmitter | Current IOT based transmitter and combiner can't be re-tuned for channel 33. Please see attached justification and quote. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 2000.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 10 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 1500.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
New Electrical Sub-Panels |
New HVAC electrical sub-panels for new AC units required for the repack combiner area fed off of the existing 480/208 main panel. This equipment is required to provide the existing power to the HVAC units. |
Interim Transmitter Installation |
Installation of new transmitter into existing RF system, tuning, proofing. |
Ice Shield for HVAC equipment |
Ice protection for new outdoor HVAC equipment outside the combiner room. The total estimated area is 300 sq. ft. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Lease New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels | 8 | |
Design power capacity in use | 50.0 % | |
Lower Limit | 638.00 MHz | |
Upper Limit | 722.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | RD32A-D | |
Year | 2002 |
Facility ID | Call Sign |
---|---|
31870 | KYAZ |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Lease New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Leased | |
Owner | American Tower Corporation | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 4 | |
Number of Panels/Bays | 14 | |
Lower Limit | 515.00 MHz | |
Upper Limit | 605.00 MHz | |
Design power capacity in use | 90.0 % | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | PEPL42C | |
Year | 2017 | |
Justification for New Antenna | Current Antenna will not support post repack assigned channel 33. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 3 | |
Frequencies of channels supported | Upper and lower frequency | |
Frequency | 515.0 MHz - 605.0 MHz | |
Do you need a combiner output splitter/switcher for dual feed lines? | Yes | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 7 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Combiner Installation |
Combiner installation cost for three (3) (or 6 modules, 2 per channel) constant impedance waveguide modules and three (3) directional filter modules, for 3 repacked frequency transmitters |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Lease New | |
Ownership | Leased | |
Owner | American Tower Corporation | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 24 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 692.00 MHz | |
Design power capacity in use | 95.0 % | |
Other Antenna Type | N/A | |
ERP: | 60.0 kW | |
Manufacturer | ||
Model | TFU-24WB-C160 | |
Year | 2018 | |
Justification for New Antenna | Interim Antenna required to dismantle current top mount and remain on-air while new antenna is installed. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 7 3/16 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Name | Description |
---|---|
Interim Antenna Rental |
Rental of Interim Antenna |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Waveguide | |
Diameter | N/A | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 2200 feet per run |
Facility ID | Call Sign |
---|---|
31870 | KYAZ |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 2 | |
Length | 2100 feet per run | |
Justification for New Transmission Line | Material cost for two (2) 7-3/16" Broadband rigid transmission lines, three (6) elbows (3 each line) and a nitrogen generator for pressurization control on the dual lines. Two (2) lines at 2100' each or 4200' total. |
Name | Description |
---|---|
Internal Transmission Line |
Material cost for two (2) 7/316" Transmission lines to connect Transmitter and combiner. Two (2) lines at 200' or 400' total. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1059622 | |
Coordinates (NAD83) | Latitude (NAD83) | 29° 33' 45.2" N- |
Longitude (NAD83) | 095° 30' 35.9" W- | |
Overall Structure Height | 1974.06 feet | |
Support Structure Height | 1844.14 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 74.15 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers, LLC. | |
Date Constructed | 08/30/2000 |
Facility ID | Call Sign | Service |
---|---|---|
53847 | KXLN-DT | DTV |
51569 | KTXH | DTV |
31870 | KYAZ | DTV |
69531 | KZJL | DTV |
22204 | KRIV | DTV |
13200 | KUVM-CD | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for tower with candelabra |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Permit Drawing Package |
Basic drawing package for municipality permitting. |
One-time Tower Rental |
One-time tower rental cost for interim side mount antenna on the AT tower at Missouri City, shared with two other broadcasters |
Construction Project Management -Tower Modifications reinforcements and facilities |
(17.5) hours on modification project management and (42.5) hours for RF installation project management. |
Ground and Building - Permit Drawing Packag |
Basic drawing package for municipality permitting. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 95 | |
Explanation | Project management fee for the transition of broadcasters. Scheduling and management of the timelines and schedules occurring during the repack. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
RF System Test |
Testing of the combiner to ensure all one (1) frequencies are tuned for optimal patterns. |
Migratory Bird Assessment - Permitting |
Migratory Bird Assessment / Permitting (if needed) |
Site Coordination Meeting |
Site coordination meetings with all broadcasters, contractors and vendors involved with the site deliveries and construction. This cost is for travel and logistics expenses accrued. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | No |
Name | Description |
---|---|
Compound Fencing |
The removal and installation of existing fencing in compound area where the construction and additional equipment is being installed, some of the fencing will require replacement and reconfiguration once all repack construction is completed. |
Grading |
Cost of preparation and staging of hoists and equipment on the soft soil area around tower site. Due to the heavy weights of the equipment needed to perform the antenna gin pole removals/Installation, the equipment may sink in soft soil conditions. |
Road upgrades to support heavy equipment transportation exclusive to Repack activities |
Repairs and upgrades to roadway due to excessive traffic and weight loads associated with the repack. |
Site Secuirty Company during construction for theft prevention and vandalism |
Site security for installation and storage of Transmission line and materials for 30 days X 12 hours. The materials are a high risk of theft due to the material makeup such as copper, brass and aluminum. |
Site Survey |
Complete Site Survey to determine existing site parameters, determine equipment needs, develop action plan for repack. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,518,251.00 | $2,170,549.18 | N/A | $686,232.18 | N/A |
Total for all systems | $7,759,601.00 | $3,695,559.18 | N/A | $965,214.13 | N/A |
Primary Transmitter THU9-36 EVO | $3,518,251.00 | $2,170,549.18 | $686,232.18 | ||
Ice Shield for HVAC equipment | $8,000.00 | $8,000.00 | Ice protection for new outdoor HVAC equipment outside the combiner room. The total estimated area is 300 sq. ft. | $2,000.00 | N/A |
Interim Transmitter Installation | $68,351.00 | $68,351.00 | Cost to route and plumb new transmitter into existing RF system. Once new external line and antenna are complete the transmitter will be re-plumbed into it. This is necessary to make space within the existing transmitter suite. | $9,405.70 | N/A |
New Electrical Sub-Panels | $1,250.00 | $1,250.00 | New HVAC electrical sub-panels for new AC units required for the repack combiner area fed off of the existing 480/208 main panel. This equipment is required to provide the existing power to the HVAC units. | $312.50 | N/A |
Other -- Building Addition Size: 1500.0 | $25,000.00 | $25,000.00 | Building space upgrade, converting large suite area to the new repack combiner area, split from a private suite in room 106. 300 Sqft concrete pad for new HVAC | $6,250.00 | N/A |
10 Ton system | $38,900.00 | $37,000.00 | N/A | $6,166.67 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $52,000.00 | $50,000.00 | N/A | $19,712.50 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $24,300.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | $2,268.75 | N/A |
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW | $1,788,000.00 | $1,280,232.12 | N/A | $640,116.06 | N/A |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | $1,473,000.00 | $640,116.06 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Ice Shield for HVAC equipment | |
Interim Transmitter Installation | |
New Electrical Sub-Panels | |
Other -- Building Addition Size: 1500.0 | |
10 Ton system | |
2" Rigid Conduit and Wiring (Cost per foot) | |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
Switchgear - industrial 800 amp | |
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW | |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,476,730.00 | $428,420.00 | N/A | $76,780.00 | N/A |
Total for all systems | $7,759,601.00 | $3,695,559.18 | N/A | $965,214.13 | N/A |
Interim Antenna TFU-24WB-C160 | $143,450.00 | $142,600.00 | $19,650.00 | ||
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | $16,850.00 | $16,000.00 | N/A | $2,400.00 | N/A |
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 60 - 65 kW input, directional,, horizontally polarized | $69,000.00 | $69,000.00 | Interim antenna must be purchased so the station may timely transition to its post-auction channel. | $17,250.00 | N/A |
Interim Antenna Rental | $57,600.00 | $57,600.00 | Interim Antenna Rental | N/A | N/A |
Primary Antenna PEPL42C | $1,333,280.00 | $285,820.00 | $57,130.00 | ||
Combiner Installation | $9,500.00 | $9,500.00 | Installation and tuning of combiner modules. | $2,083.33 | N/A |
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | $16,850.00 | $16,000.00 | N/A | $2,400.00 | N/A |
Combiner output splitting/switching for dual feed lines, if applicable | $126,000.00 | $50,000.00 | N/A | $0.00 | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $54,000.00 | N/A | $13,500.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $1,666.67 | N/A |
UHF - High Power Top Mount (200-1000 kW), Four Station broadband panel antenna, elliptically or circularly polarized | $1,090,000.00 | $149,920.00 | N/A | $37,480.00 | N/A |
Actual Information Description | File Name |
---|---|
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | |
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 60 - 65 kW input, directional,, horizontally polarized | |
Interim Antenna Rental | Information not provided. |
Combiner Installation | |
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | |
Combiner output splitting/switching for dual feed lines, if applicable | Information not provided. |
New combiner, cost per channel (without antenna) | |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), Four Station broadband panel antenna, elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,525,400.00 | $426,800.00 | N/A | $94,943.02 | N/A |
Total for all systems | $7,759,601.00 | $3,695,559.18 | N/A | $965,214.13 | N/A |
Primary Transmission Line | $1,525,400.00 | $426,800.00 | $94,943.02 | ||
Internal Transmission Line | $126,800.00 | $126,800.00 | Internal transmission line from transmitter room to combiner room. $317 per foot at 400 feet. | $23,543.02 | N/A |
Rigid Transmission Line - copper, 7 3/16" broadband | $1,398,600.00 | $300,000.00 | N/A | $71,400.00 | N/A |
Actual Information Description | File Name |
---|---|
Internal Transmission Line | |
Rigid Transmission Line - copper, 7 3/16" broadband |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $937,100.00 | $394,100.00 | N/A | $68,896.95 | N/A |
Total for all systems | $7,759,601.00 | $3,695,559.18 | N/A | $965,214.13 | N/A |
Primary Tower GTOWER | $937,100.00 | $394,100.00 | $68,896.95 | ||
Structural engineering tower load study for a documented tower with candelabra | $20,000.00 | $19,000.00 | N/A | $2,771.87 | N/A |
One-time Tower Rental | $57,600.00 | $57,600.00 | N/A | $14,400.00 | N/A |
Major tower reinforcement/modifications | $421,000.00 | $100,000.00 | N/A | $22,500.08 | N/A |
Tower Permit Drawing Package | $5,000.00 | $5,000.00 | Basic drawing package for municipality permitting. | $1,175.00 | N/A |
Ground and Building - Permit Drawing Packag | $5,000.00 | $5,000.00 | Basic drawing package for municipality permitting. | $1,175.00 | N/A |
Construction Project Management -Tower Modifications reinforcements and facilities | $7,500.00 | $7,500.00 | (17.5) hours on modification project management and (42.5) hours for RF installation project management. 60 Hrs x $125hr | $1,875.00 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $200,000.00 | N/A | $25,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Structural engineering tower load study for a documented tower with candelabra | |
One-time Tower Rental | |
Major tower reinforcement/modifications | |
Tower Permit Drawing Package | |
Ground and Building - Permit Drawing Packag | |
Construction Project Management -Tower Modifications reinforcements and facilities | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $186,930.00 | $162,500.00 | N/A | $7,233.55 | N/A |
Total for all systems | $7,759,601.00 | $3,695,559.18 | N/A | $965,214.13 | N/A |
Outside Professional Services | $186,930.00 | $162,500.00 | $7,233.55 | ||
Site Coordination Meeting | $10,000.00 | $10,000.00 | Travel and logistical expenses for planning, construction, and installation. | $312.50 | N/A |
Migratory Bird Assessment - Permitting | $500.00 | $500.00 | Study to prove no disruption to migratory birds for permitting. | $109.38 | N/A |
RF System Test | $5,000.00 | $5,000.00 | Testing of the combiner to ensure all frequencies are tuned for optimal patterns. | $1,250.00 | N/A |
RF Exposure Measurements | $21,050.00 | $5,000.00 | N/A | $937.50 | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,000.00 | N/A | $41.67 | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $6,000.00 | N/A | $337.50 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $1,250.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $625.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $15,010.00 | $14,250.00 | N/A | $2,370.00 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Site Coordination Meeting | |
Migratory Bird Assessment - Permitting | |
RF System Test | |
RF Exposure Measurements | |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
ASR modification (prepare FCC Form 854) | |
NEPA Section 106 environmental review, if needed | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | |
Prepare and or review reimbursement form | Information not provided. |
Project management of the transition | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $115,190.00 | $113,190.00 | N/A | $31,128.43 | N/A |
Total for all systems | $7,759,601.00 | $3,695,559.18 | N/A | $965,214.13 | N/A |
Other Expenses | $115,190.00 | $113,190.00 | $31,128.43 | ||
Site Survey | $5,000.00 | $5,000.00 | Site Survey to determine repack action plan. | $2,303.85 | N/A |
Compound Fencing | $2,000.00 | $2,000.00 | Compound fencing must be removed for repack work and then reinstalled once completed. | $468.75 | N/A |
Develop and air announcement of upcoming channel change | $5,000.00 | $5,000.00 | Estimated cost for creation of announcement and air-time required. | N/A | N/A |
Equipment Storage | $6,000.00 | $6,000.00 | Rental of a storage unit for $500/month for 1 year to receive transmitter equipment | N/A | N/A |
Equipment Delivery and Handling Charges | $10,000.00 | $10,000.00 | Additional shipping and delivery charges for larger items. | $833.33 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $60,000.00 | $60,000.00 | Estimated costs for removal and disposal of old transmitter, line, and RF sections. | $24,710.00 | N/A |
Non-zoning permits | $2,000.00 | $2,000.00 | Local permit cost for representation change for permit/application. | $250.00 | N/A |
Local Zoning | $1,500.00 | $1,500.00 | Estimate for local zoning costs | $187.50 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $0.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $0.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | N/A | N/A |
Site Secuirty Company during construction for theft prevention and vandalism | $6,000.00 | $6,000.00 | Site security for installation and storage of Transmission line and materials for 30 days X 12 hours. The materials are a high risk of theft due to the material makeup such as copper, brass and aluminum. | $1,500.00 | N/A |
Road upgrades to support heavy equipment transportation exclusive to Repack activities | $2,500.00 | $2,500.00 | The cost associated damage to the access road/driveway caused by trenching (i.e. electrical and foundation installations) and equipment mobilization (i.e. excessive weighted and constant traffic that doesn’t normally occur) associated with the repack. | $625.00 | N/A |
Grading | $2,000.00 | $2,000.00 | Estimated costs to address soil conditions at base of tower. Costs to grade and repair soil disturbed by heavy machinery and equipment. | $250.00 | N/A |
Actual Information Description | File Name |
---|---|
Site Survey | |
Compound Fencing | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Non-zoning permits | |
Local Zoning | |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
DTV Medical Facility Notification | Information not provided. |
Site Secuirty Company during construction for theft prevention and vandalism | |
Road upgrades to support heavy equipment transportation exclusive to Repack activities | |
Grading |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $7,759,601.00 | $3,695,559.18 | $965,214.13 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Joseph A Garcia Senior Executive Vice President 12/10/2018 |