Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Hearst Properties Inc. Doing Business As: Hearst Properties Inc. |
PO Box 1800 Raleigh, NC 27602 United States |
+1 (919) 839-0300 | shartzell@brookspierce.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | see attached transition plan |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma CD3300P3 | |
Year | 2001 | |
Type | Inductive Output Tube | |
IOT Power Type | Three | |
Power Capacity | 62.8 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-100 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 62.9 kW | |
Justification for New Transmitter | Existing IOT transmitter cannot be converted to post-transition channel, see GatesAir EOL and HTV IOT to Solid-State Justification statements. An IOT replacement is more expensive than proposed SS transmitter. See attached Comark IOT Transmitter quote. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Transmitter installation electrical service | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 15 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Electrical Accessories |
Manufacturer required surge protection |
Shipping |
Transmitter shipping |
RF Accessories |
Additional RF components required for transmitter operation |
Sales Tax |
transmitter sales tax |
Cooling Deck |
Elevated deck for transmitter cooling heat exchangers. No ground space is available. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Bottom | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-30GBH 08 | |
Year | 2002 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Bottom | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-30GBH O8 | |
Year | 2020 | |
Justification for New Antenna | Current antenna is channel specific and cannot be used on post-transition channel |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Custom cut line sections |
CUT LENGTHS TO 10 FT, TBD, FOR USE WITH ELBOW COMPLEX IN CANDELABRA ARM |
Shipping |
Estimated shipping cost |
Additional Elbows |
FOR USE WITH ELBOW COMPLEX IN CANDELABRA ARM |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 16 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 860.00 MHz | |
Design power capacity in use | 90.0 % | |
Other Antenna Type | N/A | |
ERP: | 850.0 kW | |
Manufacturer | ||
Model | TFU-16WB | |
Year | 2018 | |
Justification for New Antenna | interim antenna required while main antenna is replaced. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 6 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Dielectric |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1770 feet per run |
Name | Description |
---|---|
Refurbish line |
replace transmission line bullets and seals |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Segment Length | Broadband | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1440 feet per run | |
Justification for New Transmission Line | required for interim antenna |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1057473 | |
Coordinates (NAD83) | Latitude (NAD83) | 27° 49' 10.8" N- |
Longitude (NAD83) | 082° 15' 38.0" W- | |
Overall Structure Height | 1592.83 feet | |
Support Structure Height | 1443.88 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 75.13 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers, LLC. | |
Date Constructed | 09/07/2011 |
Facility ID | Call Sign | Service |
---|---|---|
11290 | WTSP | DTV |
6601 | WXPX-TV | DTV |
23078 | WMTX | FM |
60559 | WVEA-TV | DTV |
11125 | WCLF | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Grounds and Building |
The generation of a construction drawing package for one (1) broadcasters/customers. |
Tower Load Study |
Structural engineering tower load study for a documented tower with candelabra |
Project Management |
Construction project management; Tower modification reinforcements and facilities |
Tower Permit |
Tower permit drawing package |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 95 | |
Explanation | Additional RF experience needed in planning and execution and ATC tower project management | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Antenna consulting |
Coordinate antenna information and data with owner of stacked antenna |
Site Coordination |
Site Coordination Meeting |
Transmitter Site Survey |
Transmitter planning survey & transmitter building drawings |
Non-Catalog legal expenses |
Non-Catalog expenses for legal advice and services, including financial/reimbursement review, transition reporting, transition procedures, and other transition-related issues |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
One-time tower rental |
ATC one-time tower rental during market repack period per attached ATC documentation |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,010,776.33 | $1,976,176.33 | N/A | $1,144,251.39 | N/A |
Total for all systems | $3,629,230.33 | $3,641,191.78 | N/A | $1,187,462.44 | N/A |
Primary Transmitter ULXTE-100 | $2,010,776.33 | $1,976,176.33 | $1,144,251.39 | ||
Cooling Deck | $15,000.00 | $15,000.00 | no ground space available for heat exchangers - see attached price quote: MOR TV Deck Development and Installation Proposal - Rev 1.pdf | N/A | N/A |
Sales Tax | $129,176.00 | $129,176.00 | transmitter sales tax per attached GatesAir quote | N/A | N/A |
RF Accessories | $77,737.29 | $77,737.29 | Additional RF components required for transmitter operation and integration into current RF environment per GatesAir quote. | N/A | N/A |
Shipping | $17,300.00 | $17,300.00 | transmitter shipping per attached GatesAir quote | N/A | N/A |
Electrical Accessories | $7,500.00 | $7,500.00 | third party surge protection - quote attached. | N/A | N/A |
15 Ton system | $55,800.00 | $21,200.00 | N/A | N/A | N/A |
Other Electrical Service: Transmitter installation electrical service | $94,000.00 | $94,000.00 | main transmitter installation electrical service see attached quote | $27,490.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 62.9 kW | $1,614,263.04 | $1,614,263.04 | GatesAir quote sections A, B & E. This is the transmitter, mask filter, installation and proof per the FCC "transmitter" definition. | $1,116,761.39 | N/A |
Actual Information Description | File Name |
---|---|
Cooling Deck | Information not provided. |
Sales Tax | Information not provided. |
RF Accessories | Information not provided. |
Shipping | Information not provided. |
Electrical Accessories | Information not provided. |
15 Ton system | Information not provided. |
Other Electrical Service: Transmitter installation electrical service | |
UHF - Liquid Cooled Solid State Transmitter 62.9 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $409,439.00 | $636,957.00 | N/A | $0.00 | N/A |
Total for all systems | $3,629,230.33 | $3,641,191.78 | N/A | $1,187,462.44 | N/A |
Interim Antenna TFU-16WB | $122,430.00 | $116,200.00 | $0.00 | ||
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $7,800.00 | per attached Dielectric quote | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
UHF - High Power, Side Mount, basic slot antenna, 16 bay,, 850 kW input, directional,, horizontally polarized | $102,000.00 | $102,000.00 | antenna price per Dielectric quote: 800080CMZ-2 WMOR HEARST AUX .pdf | N/A | N/A |
Primary Antenna TFU-30GBH O8 | $287,009.00 | $520,757.00 | $0.00 | ||
Additional Elbows | $4,794.00 | $4,794.00 | per Dielectric quote | N/A | N/A |
Shipping | $12,000.00 | $12,000.00 | per Dielectric quote | N/A | N/A |
Custom cut line sections | $4,185.00 | $4,185.00 | per Dielectric quote | N/A | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | $247,000.00 | $483,080.00 | price per Dielectric quote: 800069CMZ-2 WMOR HEARST .pdf | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $10,298.00 | per Dielectric quote | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $347,415.00 | $266,183.40 | N/A | $0.00 | N/A |
Total for all systems | $3,629,230.33 | $3,641,191.78 | N/A | $1,187,462.44 | N/A |
Interim Transmission Line | $334,080.00 | $252,848.40 | $0.00 | ||
Rigid Transmission Line - copper, 6 1/8" broadband | $334,080.00 | $252,848.40 | per Dielectric quote: DielectricQuote1221002 bullet refurbish.pdf | N/A | N/A |
Primary Transmission Line | $13,335.00 | $13,335.00 | $0.00 | ||
Refurbish line | $13,335.00 | $13,335.00 | per Dielectric quote | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $638,700.00 | $558,200.00 | N/A | $0.00 | N/A |
Total for all systems | $3,629,230.33 | $3,641,191.78 | N/A | $1,187,462.44 | N/A |
Primary Tower GTOWER | $638,700.00 | $558,200.00 | $0.00 | ||
Tower Load Study | $19,000.00 | $19,000.00 | per attached ATC document | N/A | N/A |
Tower Permit | $4,700.00 | $4,700.00 | per ATC documentation | N/A | N/A |
Grounds and Building | $4,700.00 | $4,700.00 | per ATC documentation | N/A | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $400,000.00 | N/A | N/A | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $100,000.00 | per ATC documentation | N/A | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $24,800.00 | per attached ATC document | N/A | N/A |
Project Management | $5,000.00 | $5,000.00 | 40hrs x $125/hour per ATC documentation | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $120,120.00 | $102,460.05 | N/A | $43,211.05 | N/A |
Total for all systems | $3,629,230.33 | $3,641,191.78 | N/A | $1,187,462.44 | N/A |
Outside Professional Services | $120,120.00 | $102,460.05 | $43,211.05 | ||
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $5,000.00 | N/A | $4,162.50 | N/A |
Non-Catalog legal expenses | $20,000.00 | $20,000.00 | Non-Catalog expenses for legal advice and services, including financial/reimbursement review, transition reporting, transition procedures, and other transition-related issues | $2,388.00 | N/A |
Transmitter Site Survey | $20,600.00 | $20,600.00 | transmitter site survey per attached quote Transmitter planning survey & transmitter building drawings | $20,600.00 | N/A |
Site Coordination | $2,500.00 | $2,500.00 | per ATC documentation | N/A | N/A |
Antenna consulting | $250.00 | $250.00 | Project consulting | $250.00 | N/A |
RF Exposure Measurements | $21,050.00 | $3,750.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,535.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $992.20 | N/A |
Project management of the transition | $15,010.00 | $9,480.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $1,323.30 | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,100.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $13,495.05 | see associated invoices | $13,495.05 | N/A |
Actual Information Description | File Name |
---|---|
Perform engineering study for new channel assignment and antenna development | |
Non-Catalog legal expenses | |
Transmitter Site Survey | |
Site Coordination | Information not provided. |
Antenna consulting | |
RF Exposure Measurements | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | |
Project management of the transition | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $102,780.00 | $101,215.00 | N/A | $0.00 | N/A |
Total for all systems | $3,629,230.33 | $3,641,191.78 | N/A | $1,187,462.44 | N/A |
Other Expenses | $102,780.00 | $101,215.00 | $0.00 | ||
Develop and air announcement of upcoming channel change | $2,500.00 | $2,500.00 | Attorney review to ensure FCC compliance | N/A | N/A |
Equipment Delivery and Handling Charges | $6,250.00 | $6,250.00 | estimated local storage charge for transmitter equipment | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $21,100.00 | $21,100.00 | Tansmitter removal required to make space for replacement transmitter. See attached quote. | N/A | N/A |
Local Zoning | $750.00 | $750.00 | per ATC documentation | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $10,000.00 | N/A | N/A | N/A |
MVPD Notification of Channel Change | $2,500.00 | $2,500.00 | Attorney assistance in coordinating MVPD notification | N/A | N/A |
One-time tower rental | $57,600.00 | $57,600.00 | ATC one-time tower rental during market repack period per attached ATC documentation. | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,629,230.33 | $3,641,191.78 | $1,187,462.44 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | John Drain Hearst Television SVP Chief Financial Officer 12/18/2018 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Douglas Durkee Hearst Television Manager of Spectrum Repack 12/18/2018 |