Facility ID:
72076
Service:
DTV
Call Sign:
WFTV
Channel:
35 (UHF)
File Number:
0000028020
FRN:
0014359285
Date Submitted:
11/16/2018

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WFTV, LLC

Doing Business As: WFTV, LLC

Chief Engineer

490 EAST SOUTH STREET

ORLANDO, FL 32801

United States

+1 (407) 841-9000 jeff.juniet@wftv.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Jeff Juniet

Chief Engineer

WFTV, LLC

Chief Engineer

490 E. South Street

Orlando, FL 32801

United States

+1 (407) 822-8410 Jeff.Juniet@wftv.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan To maintain operations, we will need to replace the 2 backup TXs and re-tune the main TX. The channel combiner needs to add channel 35. The aux tower will need to be brought up to G standard and the aux antenna changed for a broadband antenna.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Retune Existing
Use Primary (Main)
Ownership Owned
Owner N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer Harris
Model Power CD
Year 2010
Type Inductive Output Tube
IOT Power Type Three
Power capacity 90 kW

Primary Transmitter

Back to Top

Retuning Transmitter Costs

Section Question Response
New IOT Tubes Number of Tubes (including accessories) needed 3
New Mask Filter
Power 60 kW
Other Power N/A
New Exciter Is a new exciter needed? No

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Auxiliary
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Diamond CD
Year 2010
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 7.5 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model ULXTE-12
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 8.5 kW
Justification for New Transmitter Replacement for the existing backup transmitter. The current TX is an unsupported model that cannot be retuned per the manufacturer.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 1 inches
Length 300.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 25 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Auxiliary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Backup
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Sigma
Year 1999
Type Inductive Output Tube
IOT Power Type Three
Power Capacity 100 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-50
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 25.4 kW
Justification for New Transmitter The auxiliary transmitter will be needed at a second site to maintain on-air operations while modifications are performed at the main site.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 1 inches
Length 300.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 25 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Broadband Panel
Number of Stations Supported 2
Number of Panels 56
Design power capacity in use 100.0 %
Lower Limit 470.00 MHz
Upper Limit 698.00 MHz
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer DIELECTRIC
Model TUM20-O4SP-14/56H-2-R-T
Year 2010

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
55454 WRDQ

Primary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? Yes

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type Additional Module
Number of channels supported 3
Frequencies of channels supported RF channel
Frequency N/A

Enter a list of RF channel numbers.

RF Channel Number
39
27
35

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Re-tuneing elbow complex

The existing main antenna needs the elbow complex tuned/optimized for the new channel.

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Auxiliary (Backup)
Description of Use Auxiliary
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Class A
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 295.0 kW
Manufacturer
Model TFU-24DSB-E
Year 2011

Auxiliary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Auxiliary (Backup)
Description of Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 1
Number of Panels/Bays 8
Lower Limit 470.00 MHz
Upper Limit 860.00 MHz
Design power capacity in use 100.0 %
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TUA-C1-8/8H-1-T
Year 2017
Justification for New Antenna The existing antenna is a single channel and must be replaced to accommodate newly assigned channel. Dielectric was able to provide a less expensive & more efficient antenna.

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Auxiliary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Auxiliary
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 4 1/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1350 feet per run

Auxiliary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Auxiliary (Backup)
Description of Use Auxiliary
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 4 1/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 500 feet per run
Justification for New Transmission Line See attached exhibit titled "Sept. Amendment-Revised Repack Process for WFTV Orlando".

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Auxiliary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Auxiliary (Backup)
Description of Use Auxiliary
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1214939
Coordinates (NAD83) Latitude (NAD83) 28° 34' 08.2" N-
Longitude (NAD83) 081° 03' 15.6" W-
Overall Structure Height 1612.84 feet
Support Structure Height 1609.89 feet
Ground Elevation Above Mean Sea Level (AMSL) 61.68 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner IWG Towers Assets II, LLC
Date Constructed 11/20/2000


Auxiliary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Auxiliary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Auxiliary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

St Cloud tower

Modifications are needed to bring the tower up to the G standard. See attached plan for additional details.

Primary Tower

Back to Top

Add Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1214939
Coordinates (NAD83) Latitude (NAD83) 28° 34' 08.2" N-
Longitude (NAD83) 081° 03' 15.6" W-
Overall Structure Height 1612.84 feet
Support Structure Height 1609.89 feet
Ground Elevation Above Mean Sea Level (AMSL) 61.68 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner IWG Towers Assets II, LLC
Date Constructed 11/20/2000

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
48716 WWKA FM
23443 WDBO-FM FM
55454 WRDQ DTV

Other Types of Users

Users
Two-Way Radio
Wireless I'net

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: No reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 100
Explanation Coordination of building and construction permits.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers No
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service Yes
Number of Days 35
Justification RF Consulting Engineer - To determine correct mask filter to avoid interference RF Consulting Engineer - 10-30 days to test for interference after mask filter is installed

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,732,680.00 $2,304,008.54 N/A $1,013,224.44 N/A
Total for all systems $5,086,555.00 $3,709,976.54 N/A $1,329,409.17 N/A
Primary Transmitter Power CD $947,400.00 $659,010.25 $191,336.75
60 kW mask filter $89,400.00 $85,000.00 N/A N/A N/A
3 IOT Tubes $382,500.00 $0.00 Price of tubes is included in the price of retuning the main transmitter (Quote_GA-00018301r1_WFTV PWR90D3 Channel Change 2016-11-29). N/A N/A
Three IOT system (90 kW) $475,500.00 $574,010.25 Pricing is per manufacturer's quote. $191,336.75 N/A
Auxiliary Transmitter ULXTE-12 $666,390.00 $478,955.93 $103,978.11
25 Ton system $91,500.00 $87,000.00 N/A $0.00 N/A
1" Rigid Conduit and Wiring $5,390.00 $5,390.00 N/A N/A N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $35,000.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A N/A N/A
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW $494,500.00 $315,265.93 N/A $103,978.11 N/A
Auxiliary Transmitter ULXTE-50 $1,118,890.00 $1,166,042.36 $717,909.58
25 Ton system $91,500.00 $90,500.00 The original plan called for 25 tons of cooling with pricing based on units available years ago. Once the transmitter size we set the final determination was for 40 tons of cooling. The cost of the units has risen since the initial estimates were made. $90,500.00 Per the attached quote "HVAC four 5 tons updated" the costs for equipment an installation of the required AC totaled 90,500.00.
1" Rigid Conduit and Wiring $5,390.00 $5,390.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $105,288.00 The transmitter for the Ft. Christmas site will require a new service entrance and the associated switchgear. $7,500.00 Initial invoice for the electrical work needed at the Aux Site. Invoice 8047 is for the electrical work to support the installation of the HVAC system. Additional electrical service work and equipment will need to be needed for the transmitter install.
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW $947,000.00 $929,864.36 Per Manufacturer's quote and includes RF system and switching $619,909.58 N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $35,000.00 N/A N/A N/A

Components

Actual Information Description File Name
60 kW mask filter Information not provided.
3 IOT Tubes Information not provided.
Three IOT system (90 kW)

Component Description:
Deposit payment for retuning the main transmitter to new channel including RF system and new IOTs.
Amount:
$191,336.75
25 Ton system Information not provided.
1" Rigid Conduit and Wiring Information not provided.
Transformer 3 phase/480v - 300 KVA Information not provided.
Switchgear - industrial 800 amp Information not provided.
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW

Component Description:
deposit invoice for replacement aux transmitter. ULXTE-12
Amount:
$103,850.61

Component Description:
Auxiliary Transmitter System Design
Amount:
$127.50
25 Ton system

Component Description:
Initial invoice/deposit for HVAC system equipment and installation for Aux site.
Amount:
$21,500.00

Component Description:
Final invoice for HVAC equipment and installation for aux site.
Amount:
$69,000.00
1" Rigid Conduit and Wiring Information not provided.
Switchgear - industrial 800 amp

Component Description:
Installation of electrical switch gear for HVAC system at aux site.
Amount:
$7,500.00
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW

Component Description:
Pre-shipping invoice per quote number: GA-00022140
Amount:
$309,954.79

Component Description:
invoice for the deposit on replacement aux transmitter. ULXTE-50
Amount:
$309,954.79
Transformer 3 phase/480v - 300 KVA Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,118,660.00 $337,635.00 N/A $192,643.76 N/A
Total for all systems $5,086,555.00 $3,709,976.54 N/A $1,329,409.17 N/A
Primary Antenna TUM20-O4SP-14/56H-2-R-T $864,930.00 $96,235.00 $10,234.38
Re-tuneing elbow complex $6,000.00 $6,000.00 Elbow complex tuning will require an RF Engineer and Tower Crew. N/A N/A
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, elliptically or circularly polarized $768,000.00 $0.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $10,235.00 Pricing is from quotes and work performed by RF Engineer. $10,234.38 The initial sweep of the line and antenna verified the power handling and available channels of the line. the final sweep verified the system compatibility with the newly assigned channel.
Adding a module to existing combiner (without antenna) $84,200.00 $80,000.00 N/A N/A N/A
Auxiliary Antenna TUA-C1-8/8H-1-T $253,730.00 $241,400.00 $182,409.38
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $3,881.28 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized $247,000.00 $235,000.00 N/A $178,528.10 N/A

Components

Actual Information Description File Name
Re-tuneing elbow complex Information not provided.
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, elliptically or circularly polarized Information not provided.
Sweep test of existing antenna

Component Description:
Final sweep of transmission line and antenna to verify compatibility with newly assigned channel.
Amount:
$4,504.97

Component Description:
Initial sweep of transmission lines and antenna.
Amount:
$5,729.41
Adding a module to existing combiner (without antenna) Information not provided.
Sweep test of existing antenna

Component Description:
Sweep of the line at the aux site to confirm power handling and channel compatibility.
Amount:
$3,881.28
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized

Component Description:
Invoice for 45% of total w/order for Aux antenna. TUA-C1-8/8H-1-T DIRECTIONAL ANTENNA FOR D35
Amount:
$86,776.34

Component Description:
payment for antenna and mounting pole including quote.
Amount:
$775.42

Component Description:
INTERIM/AUX TERMS: 45% PRIOR TO SHIPMENT
Amount:
$86,776.34

Component Description:
Auxiliary Antenna Design
Amount:
$4,200.00

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $71,000.00 $53,993.00 N/A $48,593.70 N/A
Total for all systems $5,086,555.00 $3,709,976.54 N/A $1,329,409.17 N/A
Auxiliary Transmission Line $71,000.00 $53,993.00 $48,593.70
Rigid Transmission Line - copper, 4 1/16" $71,000.00 $53,993.00 N/A $48,593.70 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 4 1/16"

Component Description:
WFTV ORLANDO, FL AUX ST. CLOUD 41/8" TRANSMISSION LINE FOR AUX ANTENNA. RE: QUOTE # 700411CMZ TERMS: 45% WITH ORDER.
Amount:
$24,296.85

Component Description:
WFTV ORLANDO, FL AUX ST. CLOUD 41/8" TRANSMISSION LINE FOR AUX ANTENNA. RE: QUOTE # 700411CMZ TERMS: 45% PAYMENT PRIOR TO SHIP.
Amount:
$24,296.85

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $867,200.00 $720,080.00 N/A $27,360.00 N/A
Total for all systems $5,086,555.00 $3,709,976.54 N/A $1,329,409.17 N/A
Primary Tower TOWER $223,100.00 $12,000.00 $11,900.00
Structural engineering tower load study for well documented tower $12,600.00 $12,000.00 N/A $11,900.00 N/A
Tall Tower (greater than 500') $210,500.00 $0.00 N/A N/A N/A
Auxiliary Tower TOWER $644,100.00 $708,080.00 $15,460.00
St Cloud tower $0.00 $0.00 N/A N/A N/A
Tall Tower (greater than 500') $210,500.00 $220,000.00 Estimate from tower engineering firm to rig and unrig the tower for the required upgrade work. N/A N/A
Major tower reinforcement/modifications $421,000.00 $472,620.00 This work will bring the tower up to G standard. $0.00 The pricing is based on the quote from the structural engineering firm.
Structural engineering tower load study for well documented tower $12,600.00 $15,460.00 Pricing is from structural engineering study by TCI. $15,460.00 N/A

Components

Actual Information Description File Name
Structural engineering tower load study for well documented tower

Component Description:
structural analysis, inspection and inventory of main tower
Amount:
$11,900.00
Tall Tower (greater than 500') Information not provided.
St Cloud tower Information not provided.
Tall Tower (greater than 500') Information not provided.
Major tower reinforcement/modifications Information not provided.
Structural engineering tower load study for well documented tower

Component Description:
structural analysis, inspection and inventory of aux tower
Amount:
$15,460.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $222,025.00 $219,875.00 N/A $34,086.90 N/A
Total for all systems $5,086,555.00 $3,709,976.54 N/A $1,329,409.17 N/A
Outside Professional Services $222,025.00 $219,875.00 $34,086.90
Additional Field Engineering Service, 35 Days $65,000.00 $65,000.00 RF Consulting Engineer - To determine correct mask filter to avoid interference at 5-days & 10-30 days to test for interference after mask filter is installed $9,742.50 N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $4,315.80 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $0.00 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A $0.00 Invoiced hours from the consultant for engineering documentation.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $2,415.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $5,460.00 N/A
Prepare and or review reimbursement form $2,630.00 $8,625.00 Quote from consulting engineer. $12,153.60 Legal and Engineering fees incurred for preparation, review, and filing of reimbursement for 399.
Project management of the transition $15,800.00 $15,000.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A

Components

Actual Information Description File Name
Additional Field Engineering Service, 35 Days

Component Description:
Additional engineering services for CMG amount split between 10 stations
Amount:
$7,042.50

Component Description:
additional Engineering services
Amount:
$2,700.00
RF Exposure Measurements Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Legal fees for preparation ans filing of construction permit for main transmission site.
Amount:
$4,315.80
Prepare request for Special Temporary Authorization Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Preparation of construction permit.
Amount:
$2,250.00

Component Description:
Preparation of constriction permit for Cox Media Group. Costs split between ten stations.
Amount:
$165.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Main antenna system design and analysis
Amount:
$5,325.00

Component Description:
Main antenna system design and analysis for Cox Media Group. Amount split between ten stations
Amount:
$135.00
Prepare and or review reimbursement form

Component Description:
Legal fees incurred for preparation, review, and filing of reimbursement for 399.
Amount:
$756.90

Component Description:
Review Reimbursement submission
Amount:
$1,050.00

Component Description:
Legal fees incurred for preparation, review, and filing of reimbursement for 399.
Amount:
$1,047.20

Component Description:
Legal fees incurred for preparation, review, and filing of reimbursement for 399.
Amount:
$2,318.80

Component Description:
Legal fees incurred for preparation, review, and filing of reimbursement for 399.
Amount:
$3,291.20

Component Description:
review Reimbursement submission for 10 Cox Media Group Locations. Amount is split between ten stations
Amount:
$30.00

Component Description:
review Reimbursement submission for 2 Cox Media Group Locations. Amount is split between two stations
Amount:
$150.00

Component Description:
Legal fees incurred for preparation, review, and filing of reimbursement for 399.
Amount:
$3,509.50
Project management of the transition Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $74,990.00 $74,385.00 N/A $13,500.37 N/A
Total for all systems $5,086,555.00 $3,709,976.54 N/A $1,329,409.17 N/A
Other Expenses $74,990.00 $74,385.00 $13,500.37
MVPD Notification of Channel Change $1,500.00 $1,500.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $1,500.00 $1,500.00 Costs for the production of on-air and website announcements. N/A N/A
Equipment Delivery and Handling Charges $42,300.00 $42,300.00 delivery and storage costs per transmitter manufacturer's quotes. $10,673.37 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $10,000.00 $10,000.00 Removal of old equipment and high voltage transformers from Ft Christmas and St Cloud sites. per initial attached quote "Channel 9 Tower Transformer removal updated-32318.pdf" $2,827.00 N/A
Local Zoning $1,500.00 $1,500.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A N/A N/A
Equipment Storage $5,000.00 $5,000.00 N/A N/A N/A

Components

Actual Information Description File Name
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Delivery and Handling Charges

Component Description:
FREIGHT, SHIPPING, AND HANDLING FOR PANEL ANTENNA AND MOUNTING POLE. WFTV AUX SITE.
Amount:
$10,673.37
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
removal and disposal of high voltage transformers (3)
Amount:
$2,827.00
Local Zoning Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
DTV Medical Facility Notification Information not provided.
Equipment Storage Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $5,086,555.00 $3,709,976.54 $1,329,409.17

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey M Juniet

Director of Engineering


11/16/2018

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey M Juniet , Juniet .

Director of Engineering


11/16/2018