Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
KTV MEDIA, LLC Doing Business As: KTV MEDIA |
Larry Morton 17200 Chenal Parkway Suite 300 - 267 Little Rock, AR 72223 United States |
+1 (501) 476-1507 | EQUITYLEM@GMAIL.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Lindsey McGough Lori E. Withrow, P.L.L.C. |
Lindsey McGough 12410 Cantrell Rd. Suite 100 LIttle Rock, AR 72223 United States |
+1 (501) 227-2000 | lmcgough@allenwithrow.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | This application is to convert Channel 50 to Channel 19. We will use the existing antenna and retune the transmitter and filter. The change that was assigned to us by the FCC resulted in a loss of population and coverage area. See attached explanation. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TRN-5X-4D-U-C | |
Year | 2015 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | .50 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-5X-4D-U-C | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | .5 kW | |
Justification for New Transmitter | See KSJF-CD Project Description, items 2 and 3. It is cheaper to buy a used transmitter on frequency than to retune the existing transmitter. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
On-site engineering |
It costs to set up the new transmitter and to hook it into the antenna system. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 2.0 kW | |
Manufacturer | Antenna Concepts | |
Model | ANTACS16A | |
Year | 2004 |
Facility ID | Call Sign |
---|---|
14387 | KQRY-LD |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? | Yes |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 50 | |
Explanation | To plan and oversee the transition from Channel 50 to Channel 19 | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 2 | |
Justification | Confirm proper installation. (One day for 2 people) |
Name | Description |
---|---|
Tower Climber |
Climber to check and test the antenna after channel change |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Construction Financing |
Construction interest costs to build the project. |
Contingency |
5% Contingency factor for unexpected items and cost increases over the course of the construction project. |
Sales Taxes |
Not included in the item costs |
Travel |
Third party consultants travel reimbursement |
Combiner |
The current antenna will be shared with KQRY-LD |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $17,500.00 | $17,500.00 | N/A | $17,287.50 | N/A |
Total for all systems | $206,208.49 | $108,753.49 | N/A | $45,405.16 | N/A |
Primary Transmitter TRN-5X-4D-U-C | $17,500.00 | $17,500.00 | $17,287.50 | ||
On-site engineering | $2,500.00 | $2,500.00 | We are requesting that this price be increased by $500 because the original proposal did not reflect the cost of installing a full service filter. | $2,500.00 | N/A |
UHF - Air Cooled Solid State Transmitter .5 kW | $15,000.00 | $15,000.00 | N/A | $14,787.50 | N/A |
Actual Information Description | File Name |
---|---|
On-site engineering | |
UHF - Air Cooled Solid State Transmitter .5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $33,030.00 | $5,000.00 | N/A | $0.00 | N/A |
Total for all systems | $206,208.49 | $108,753.49 | N/A | $45,405.16 | N/A |
Primary Antenna ANTACS16A | $33,030.00 | $5,000.00 | $0.00 | ||
Sweep test of existing antenna | $6,730.00 | $5,000.00 | N/A | N/A | N/A |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | $26,300.00 | $0.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $125,290.00 | $55,750.00 | N/A | $23,500.00 | N/A |
Total for all systems | $206,208.49 | $108,753.49 | N/A | $45,405.16 | N/A |
Outside Professional Services | $125,290.00 | $55,750.00 | $23,500.00 | ||
Tower Climber | $2,000.00 | $2,000.00 | Climber to realign the STL on the tower and to check and test the antenna after channel change. | $1,750.00 | N/A |
Additional Field Engineering Service, 2 Days | $2,000.00 | $2,000.00 | Confirm proper installation (1 day for two people) | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $20,000.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | If required | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $4,250.00 | N/A | $4,250.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $3,000.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $7,000.00 | N/A |
Project management of the transition | $7,900.00 | $5,000.00 | N/A | $5,000.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $2,500.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Tower Climber | |
Additional Field Engineering Service, 2 Days | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Project management of the transition | |
Prepare and or review reimbursement form | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $30,388.49 | $30,503.49 | N/A | $0.00 | N/A |
Total for all systems | $206,208.49 | $108,753.49 | N/A | $45,405.16 | N/A |
Other Expenses | $30,388.49 | $30,503.49 | $0.00 | ||
Combiner | $4,242.71 | $4,242.71 | To save construction costs, we are sharing the KQRY antenna. | N/A | N/A |
Travel | $1,500.00 | $1,500.00 | Travel reimbursement for third party consultants travel. See Travel Memo. | N/A | N/A |
Sales Taxes | $2,340.00 | $2,340.00 | Estimate of sales taxes owed for equipment and services. See Sales Tax Memo. | N/A | N/A |
Contingency | $2,877.45 | $2,877.45 | Allowance for items left out of the projections and cost increases during construction - 3%. See Contingency memo. | N/A | N/A |
MVPD Notification of Channel Change | $2,000.00 | $2,000.00 | Cost to notify all MVPD providers of Channel Changes | N/A | N/A |
Develop and air announcement of upcoming channel change | $1,000.00 | $1,000.00 | Payment to third-party to prepare the proper notification of the channel change. | N/A | N/A |
Equipment Delivery and Handling Charges | $1,000.00 | $1,000.00 | Shipping costs not included in individual items. | N/A | N/A |
Local Zoning | $2,000.00 | $2,000.00 | If required | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | If required | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $4,785.00 | Because we will have to file for a different channel to correct the interference our assigned channel receives we will be required to file Major Modification. See attached KSJF-CD Fee Waiver letter. | $0.00 | THERE WAS NO ESTIMATE FOR THIS BECAUSE WE WERE NOT EXPECTING TO HAVE TO FILE A MAJOR MODIFICATION BECAUSE OF EXISTING INTERFERENCE AND COVERAGE REDUCTION. See attached KSJF Robertson Letter-2 and KSJF 399 ADDITIONAL COST LETTER.. |
DTV Medical Facility Notification | $11,550.00 | $8,000.00 | N/A | N/A | N/A |
Construction Financing | $433.33 | $433.33 | Interest costs for financing the construction. See Construction Loan and Fees memo. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Combiner | |
Travel | |
Sales Taxes | Information not provided. |
Contingency | Information not provided. |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Delivery and Handling Charges | Information not provided. |
Local Zoning | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | |
DTV Medical Facility Notification | Information not provided. |
Construction Financing | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $206,208.49 | $108,753.49 | $45,405.16 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | LARRY MORTON Manager 10/15/2018 |