Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
CBS BROADCASTING INC. Doing Business As: CBS BROADCASTING INC. |
Daniel G. Ryson 1725 DeSales St. NW Suite 501 Washington, DC 20036 United States |
+1 (202) 457-4505 | dryson@cbs.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Daniel G. Ryson Associate Director of Spectrum Management CBS |
Daniel G. Ryson 1725 DeSales St. NW Suite 501 Washington, DC 20036 United States |
+1 (202) 457-4074 | dryson@cbs.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Interim post-transition transmitter will be commissioned at the interim site. Following the transition, the interim site will become the new main and the prior main site will be equipped with new transmitter and become the aux. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Auxiliary (Backup) | |
Ownership | Owned | |
Owner | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | Harris |
Model | Maxiva UAX | |
Year | 2012 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2 kW |
Section | Question | Response |
---|---|---|
New IOT Tubes | Number of Tubes (including accessories) needed | N/A |
New Mask Filter | ||
Power | 3 kW | |
Other Power | N/A | |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Auxiliary | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Diamond | |
Year | 2003 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 21 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | UAXTE-32 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 19 kW | |
Justification for New Transmitter | Vendor will not retune existing aux transmitter. We will use this transmitter as the interim until the main can be built. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Surge Suppressor and 112.5 Kva Transformer. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
State Sales Tax |
Auxiliary Transmitter Sales Tax. |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma | |
Year | 2009 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 42 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-60 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 38 kW | |
Justification for New Transmitter | Vendor will not re-tune the existing backup (see Exhibit 1). New IOT transmitter (see Exhibit 2) is more expensive than proposed transmitter (see Exhibit 3). |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 4 inches | |
Length | 100.0 feet | |
Other Electrical Service | Yes | |
Description | Transformer 208. Step-down transformer to 208 from 480 required for new transmitter. Larger conductors required. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 30 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 0.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Sales Tax |
Primary Transmitter Sales Tax |
RF Accessories |
Required for transmitter. See Exhibit 3, item C. |
Ducting and Plenum |
Modifications to existing HVAC ducting and plenum are necessary for proper cooling of transmitter. |
Electrical Sub Panel |
New Sub-Panels for locations that are currently not supporting transmitter equipment. See Exhibit 5A. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Bottom | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 64 | |
Design power capacity in use | 75.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 750.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 540.0 kW | |
Manufacturer | Harris | |
Model | TAD-16UDA 8/64 | |
Year | 1995 |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? | Yes |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Auxiliary (Backup) | |
Description of Use | Doomsday Auxiliary | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this antenna currently shared with any other stations? | Yes | |
Is this antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 3 | |
Number of Panels | 16 | |
Design power capacity in use | 35.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 650.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 50.0 kW | |
Manufacturer | Dielectric | |
Model | TUA-C2-8/16M-1 | |
Year | 2014 |
Facility ID | Call Sign |
---|---|
35670 | KTLA |
47906 | KNBC |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? | No |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | Additional Module | |
Number of channels supported | 1 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A |
RF Channel Number |
---|
31 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Bottom | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 590.0 kW | |
Manufacturer | ||
Model | TFU-22JBH/VP-R O8 | |
Year | 2019 | |
Justification for New Antenna | See March 2018 Invoices Statement and Exhibit 13. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Name | Description |
---|---|
Antenna Sales Tax |
9.5% State and Local Sales Tax. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Myat and Dielectric |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 410 feet per run |
Name | Description |
---|---|
Additional Rigid Line |
50 feet of 6 1/8-inch for within building. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Lease New | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Segment Length | 20' | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1100 feet per run | |
Justification for New Transmission Line | Transmission line is required for interim facility to function. Includes 10 elbows, gas stop, freight, and accessories, See Exhibit 12. |
Name | Description |
---|---|
Sales Tax |
9.5% State and Local Taxes |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Auxiliary (Backup) | |
Description of Use | Interim | |
Ownership | Leased | |
Is this tower consider Complex? | Located on Building | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1012836 | |
Coordinates (NAD83) | Latitude (NAD83) | 34° 13' 55.0" N- |
Longitude (NAD83) | 118° 04' 21.0" W- | |
Overall Structure Height | 972.43 feet | |
Support Structure Height | 899.60 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 5658.40 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers, LLC. | |
Date Constructed | 01/01/1986 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Located on Building |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Project Management |
Onsite project management for tower modification and RF installation. |
Structural Analysis |
Cost to conduct structural analysis for tower reinforcements. See Exhibit 5B. |
Tower Permit Packages |
Permit drawings of tower, ground, and building. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 355 | |
Explanation | Company lacks sufficient resources. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare and file Form FCC License to Cover Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Site Coordination Meeting |
Site coordination meetings with all broadcasters, contractors and vendors involved with the site project. See Exhibit 5. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | Yes | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
TX Removal and Installation |
Remove Aux TX and assist with new TX system installation. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,506,955.27 | $2,066,896.91 | N/A | $1,814,000.56 | N/A |
Total for all systems | $4,591,882.12 | $3,438,133.36 | N/A | $2,746,430.70 | N/A |
Primary Transmitter ULXTE-60 | $1,783,472.24 | $1,441,766.93 | $1,231,165.90 | ||
Electrical Sub Panel | $4,500.00 | $4,500.00 | New Sub-Panels for locations that are currently not supporting transmitter equipment. See Exhibit 5B. | $3,375.00 | N/A |
Ducting and Plenum | $2,500.00 | $2,500.00 | After remove and replacing transmitters, heat distribution in the transmitter room will change. No additional HVAC is needed but the location of things that need to be cooled will change. | N/A | N/A |
Sales Tax | $100,994.25 | $100,994.25 | State Sales Tax. Please See Exhibit 3, Page 1. | $99,483.52 | N/A |
Other -- Building Addition Size: 0.0 | $30,000.00 | $30,000.00 | Prepare previously unused space to accommodate repack transmitter. See Exhibit 5B. | $22,500.00 | N/A |
Other -- HVAC Service Type: C Size:30 (Other) | $60,000.00 | $60,000.00 | HVAC required in previously unused space to accommodate new repack transmitter and equipment. See Exhibit 5B. | $45,000.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | $1,473,000.00 | $1,060,002.69 | See Exhibit 3, items A, B, and E. | $996,629.39 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $109,992.00 | Various electrical wiring changes and additions required at main transmitter site. See Exhibit 7A. | N/A | N/A |
4" Rigid Conduit and Wiring (Cost per foot) | $10,100.00 | $9,600.00 | N/A | N/A | N/A |
Other Electrical Service: Transformer 208. Step-down transformer to 208 from 480 required for new transmitter. Larger conductors required. | $9,983.62 | $9,983.62 | See Exhibit 3, Item D | $9,983.62 | N/A |
RF Accessories | $54,194.37 | $54,194.37 | Coaxial Switch, Coaxial Switch Controller. Required for transmitter. See Exhibit 3, Item C. | $54,194.37 | N/A |
Auxiliary Transmitter Maxiva UAX | $109,355.00 | $11,001.95 | $0.00 | ||
UHF and VHF - minor banding issues | $105,200.00 | $11,001.95 | Retune Mask Filter - See Exhibit 6 | N/A | N/A |
3 kW mask filter | $4,155.00 | $0.00 | Re-tuning existing mask filter. | N/A | N/A |
Auxiliary Transmitter UAXTE-32 | $614,128.03 | $614,128.03 | $582,834.66 | ||
State Sales Tax | $53,298.00 | $53,298.00 | State Sales Tax. Please see Exhibit 4, Page 1. | $42,520.51 | N/A |
Other Electrical Service: Surge Suppressor and 112.5 Kva Transformer. | $4,309.03 | $4,309.03 | Surge suppressor and transformer required for proper operation of transmitter. See Exhibit 4. | $4,309.03 | N/A |
UHF - Air Cooled Solid State Transmitter 19 kW | $556,521.00 | $556,521.00 | Transmitter, mask filter, and installation/proof. required for operation of interim site. Comparable to Widelity Cost Catalog pricing for 20 kW transmitter. See Exhibit 4, Items A, B, and D. | $536,005.12 | N/A |
Actual Information Description | File Name |
---|---|
Electrical Sub Panel | |
Ducting and Plenum | Information not provided. |
Sales Tax | |
Other -- Building Addition Size: 0.0 | |
Other -- HVAC Service Type: C Size:30 (Other) | |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | |
Switchgear - industrial 800 amp | Information not provided. |
4" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Other Electrical Service: Transformer 208. Step-down transformer to 208 from 480 required for new transmitter. Larger conductors required. | |
RF Accessories | |
UHF and VHF - minor banding issues | Information not provided. |
3 kW mask filter | Information not provided. |
State Sales Tax | |
Other Electrical Service: Surge Suppressor and 112.5 Kva Transformer. | |
UHF - Air Cooled Solid State Transmitter 19 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $667,513.46 | $437,242.46 | N/A | $343,365.10 | N/A |
Total for all systems | $4,591,882.12 | $3,438,133.36 | N/A | $2,746,430.70 | N/A |
Interim Antenna TFU-22JBH/VP-R O8 | $322,853.46 | $384,442.46 | $340,865.10 | ||
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $351,089.00 | This bottom-mount stacked antenna must provide structural support for big, top-mount VHF antenna. Includes elbow complex, repack sweep, and one fixed length of 6-inch line. Additional V-Pol cost was subtracted. See Exhibit 13. | $340,865.10 | N/A |
Antenna Sales Tax | $33,353.46 | $33,353.46 | 9.5% Sales Tax on Antenna (see Exhibit 13) minus V-Pol cost. | N/A | N/A |
Primary Antenna TAD-16UDA 8/64 | $253,730.00 | $6,400.00 | $0.00 | ||
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | $247,000.00 | $0.00 | Re-tuning existing antenna. | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Auxiliary Antenna TUA-C2-8/16M-1 | $90,930.00 | $46,400.00 | $2,500.00 | ||
UHF - High Power Top Mount Three Station broadband panel antenna horizontally polarized | $0.00 | $0.00 | Retuning existing antenna. | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Adding a module to existing combiner (without antenna) | $84,200.00 | $40,000.00 | N/A | $2,500.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | |
Antenna Sales Tax | Information not provided. |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | Information not provided. |
Sweep test of existing antenna | Information not provided. |
UHF - High Power Top Mount Three Station broadband panel antenna horizontally polarized | Information not provided. |
Sweep test of existing antenna | Information not provided. |
Adding a module to existing combiner (without antenna) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $250,385.39 | $223,820.99 | N/A | $176,072.04 | N/A |
Total for all systems | $4,591,882.12 | $3,438,133.36 | N/A | $2,746,430.70 | N/A |
Interim Transmission Line | $240,785.39 | $214,220.99 | $176,072.04 | ||
Sales Tax | $18,585.39 | $18,585.39 | 9.5% State and Local Tax on Interim Transmission Line. | N/A | N/A |
Rigid Transmission Line - copper, 6 1/8" | $222,200.00 | $195,635.60 | Please see March 2018 Invoices Statement and Exhibit 12. | $176,072.04 | N/A |
Primary Transmission Line | $9,600.00 | $9,600.00 | $0.00 | ||
Additional Rigid Line | $9,600.00 | $9,600.00 | Required for installation of new post-transition transmitter. (Widelity Cost Catalog pricing shown.) | N/A | N/A |
Actual Information Description | File Name |
---|---|
Sales Tax | Information not provided. |
Rigid Transmission Line - copper, 6 1/8" | |
Additional Rigid Line | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $892,938.00 | $426,578.00 | N/A | $316,768.00 | N/A |
Total for all systems | $4,591,882.12 | $3,438,133.36 | N/A | $2,746,430.70 | N/A |
Auxiliary Tower GTOWER | $892,938.00 | $426,578.00 | $316,768.00 | ||
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $10,300.00 | Structural tower mapping to provide data to the structural engineer in order to generate the correct structural output. See Exhibit 5B. | $10,300.00 | N/A |
Structural Analysis | $5,238.00 | $5,238.00 | Cost to conduct structural analysis for tower reinforcements. See Exhibit 5B. | $5,238.00 | N/A |
Tower Project Management | $10,000.00 | $10,000.00 | Due to the complexity of the site and its access, it is estimated that onsite project management for tower modification and RF installation will be a duration of 40 hours. See Exhibit 5B. | $7,500.00 | N/A |
Major tower reinforcement/modifications | $421,000.00 | $150,000.00 | It is expected that the additional loads imposed on the tower by the new appurtenances required for the repack project will cause the tower to fail. The structural failure is expected to be in the major category. See Exhibit 5B. | $112,500.00 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $241,640.00 | Includes mobilization and tower rigging per the failing structural, removal of existing top antenna and tower top section, four transmission lines, and a side mounted antenna. See Exhibit 5B. | $181,230.00 | N/A |
Tower Permit Packages | $9,400.00 | $9,400.00 | Generation of tower, building, and ground construction drawings required for local permits. See Exhibit 5B. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Structural Analysis | |
Tower Project Management | |
Major tower reinforcement/modifications | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Tower Permit Packages | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $85,760.00 | $101,580.00 | N/A | $11,725.00 | N/A |
Total for all systems | $4,591,882.12 | $3,438,133.36 | N/A | $2,746,430.70 | N/A |
Outside Professional Services | $85,760.00 | $101,580.00 | $11,725.00 | ||
Site Coordination Meeting | $5,000.00 | $5,000.00 | Site coordination meetings with all broadcasters, contractors and vendors involved with the site project. All involved parties will jointly define a site action plan and cutover approach. See Exhibit 5B. | $3,750.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $6,100.00 | N/A | $6,100.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $1,875.00 | N/A |
Project management of the transition | $56,090.00 | $74,480.00 | Company lacks sufficient resources. See Exhibits 5 and 7. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Site Coordination Meeting | |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | |
Project management of the transition | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $188,330.00 | $182,015.00 | N/A | $84,500.00 | N/A |
Total for all systems | $4,591,882.12 | $3,438,133.36 | N/A | $2,746,430.70 | N/A |
Other Expenses | $188,330.00 | $182,015.00 | $84,500.00 | ||
TX Removal and Installation | $142,500.00 | $142,500.00 | Estimate includes items in Exhibit 8A except Equipment Storage, Equipment Delivery, and Disposal, and 2/3 of the Verdugo Peak combiner installation costs, which will be shared between three stations. | $68,750.00 | N/A |
MVPD Notification of Channel Change | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
Equipment Storage | $5,000.00 | $5,000.00 | See Exhibit 8A. | $2,500.00 | N/A |
Equipment Delivery and Handling Charges | $15,000.00 | $15,000.00 | See Exhibit 8A. | $7,500.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $10,000.00 | $10,000.00 | See Exhibit 8A. | $5,000.00 | N/A |
BLM or NFS Coordination | $1,000.00 | $1,000.00 | See Exhibit 5B. | $750.00 | N/A |
Non-zoning permits | $750.00 | $750.00 | The cost of preparation and submission of the needed forms (excluding permit drawing package) for permits for jurisdictional permits required for electrical, building and other repack required tasks. See Exhibit 5B. | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $5,250.00 | See Exhibit 9. | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
TX Removal and Installation | |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
BLM or NFS Coordination | |
Non-zoning permits | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
DTV Medical Facility Notification | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $4,591,882.12 | $3,438,133.36 | $2,746,430.70 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Andrew J Siegel Assistant Secretary 10/04/2018 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Andrew J Siegel Assistant Secretary 10/04/2018 |