FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
73263
Service:
DTV
Call Sign:
WMHT
Channel:
25 (UHF)
File Number:
0000027901
FRN:
0006595441
Date Submitted:
09/25/2018

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WMHT EDUCATIONAL TELECOMMUNICATIONS

Doing Business As: WMHT

ROBERT ALTMAN

4 GLOBAL VIEW

TROY, NY 12180

United States

+1 (518) 880-3400 raltman@wmht.org Not-for-Profit

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Robert Cummings

Director of Technology

WMHT Educational Telecommunications

Robert Cummings

4 Global View

Troy, NY 12180

United States

+1 (518) 880-3474 bcummings@wmht.org

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan Replace IOT Transmitter and associated equipment. AUX antenna and transmission line, add combiner for WTEN. Replace main transmission line to combiner, combiner and shared transmission line to antenna. Add AC and electric to transmitter room.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Paragon
Year 2005
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 50 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model THU9evo
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 31 kW
Justification for New Transmitter Cost of re-tuning and replacing exciters exceeds cost of new transmitter.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Unsure of new electrical requirements
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Heating and Cooling
Size 30 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

MASK Filter

Channel Change requires new mask filter (prior cut for Channel 34)

Interim Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Interim
Description of Use N/A
Change Type Purchase
Manufacturer
Model THUevo
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 15.5 kW
Justification for New Transmitter need to have a transmitter to use while the existing transmitter room and transmission system/combiner is rebuilt for the new channel due to room constraints

Interim Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Heating and Cooling
Size 20 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A
Inside RF System Is an additional interior RF system required to support this interim transmitter? Yes

Interim Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 4
Number of Panels 60
Design power capacity in use 100.0 %
Lower Limit 470.00 MHz
Upper Limit 698.00 MHz
Other Antenna Type N/A
ERP: 105.0 kW
Manufacturer Dielectric
Model TUD-05-12/60H-1-B
Year 2005

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
11970 WXXA-TV
73264 WCWN
73942 WRGB
74422 WTEN

Primary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? Yes

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 3
Frequencies of channels supported RF channel
Frequency N/A

Enter a list of RF channel numbers.

RF Channel Number
24
22
25

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Auxiliary Antenna

Back to Top

Add Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Auxiliary (Backup)
Description of Use WMHT Aux Antenna
Ownership Owned
Owner N/A
Site N/A
Is this antenna currently shared with any other stations? No
Is this antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 19.0 kW
Manufacturer
Model DCA
Year 2005

Auxiliary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Auxiliary (Backup)
Description of Use Aux antenna
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 2
Number of Panels/Bays 24
Lower Limit 512.00 MHz
Upper Limit 600.00 MHz
Design power capacity in use 50.0 %
Other Antenna Type N/A
ERP: 20.0 kW
Manufacturer
Model TU Deltastar
Year 2017
Justification for New Antenna WMHT aux is for channel 34 only, WTEN does not have an aux antenna or back up facility needed for repack transition

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 2
Frequencies of channels supported Upper and lower frequency
Frequency 530.0 MHz - 542.0 MHz
Do you need a combiner output splitter/switcher for dual feed lines? Yes
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Auxiliary Transmission Line

Back to Top

Add Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Aux transmission line
Ownership Owned
Owner N/A
Site N/A
Is this transmission currently shared with any other stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 0
Length 347 feet per run

Auxiliary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Auxiliary (Backup)
Description of Use new channel tx line
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 0
Length 550 feet per run
Justification for New Transmission Line existing tx line for channel 34 only. WTEN does not have an aux or back up needed for repack/transition

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 0
Length 600 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
74422 WTEN
11970 WXXA-TV
73264 WCWN
73942 WRGB

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 0
Length 600 feet per run
Justification for New Transmission Line Existing transmission line does not support all the new channels assigned by the repack

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? No
ASR Number
Coordinates (NAD83) Latitude (NAD83) 42° 37' 31.3" N-
Longitude (NAD83) 074° 00' 36.7" W-
Overall Structure Height 499.01 feet
Support Structure Height 495.07 feet
Ground Elevation Above Mean Sea Level (AMSL) 1780.82 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Capital Region Broadcasters, LLC
Date Constructed 05/31/2002

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
11970 WXXA-TV DTV
73942 WRGB DTV
74422 WTEN DTV
73264 WCWN DTV
73363 WNYT DTV
73266 WMHT-FM FM

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 500
Explanation We are a PBS station with only one engineer and may need assistance throughout the repack process.After reviewing the time spent last year, we need to increase the amount for project management (not using an outside engineer)
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

In house project management and time

Unable to hire a consultant for the repack so we are doing the project management and work in house

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? No
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Rigging

For new main combiner and transmission line

Facility Heat

The facility has been heated by the WMHT and WTEN tube transmitters excess heat. Now that they are being replaced by solid state transmitters, there will no longer be any heat in the building without adding a new heat system.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,226,000.00 $1,789,255.36 N/A $1,599,469.05 N/A
Total for all systems $4,225,389.60 $2,460,803.96 N/A $1,820,497.59 N/A
Interim Transmitter THUevo $1,022,000.00 $738,255.36 $523,706.01
UHF inside RF system including switching $147,500.00 $140,000.00 N/A $0.00 N/A
20 Ton system $115,500.00 $110,000.00 N/A $107,432.50 N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $35,000.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A N/A N/A
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW $684,000.00 $416,955.36 Interim transmitter needed to stay on the air while main transmitter replaced and transmission line/combiner replaced, tested, etc. $416,273.51 N/A
Primary Transmitter THU9evo $1,204,000.00 $1,051,000.00 $1,075,763.04
MASK Filter $31,000.00 $31,000.00 N/A N/A N/A
30 Ton system $166,000.00 $158,000.00 Existing 'custom' air conditioner will need to be removed to make room for the new equipment $214,865.00 Please delete the transaction which has The Walters Co. J611B with the action - needs more information(the second Walters)- with this item deleted- the category is within budget- and The Walters Co. AC can be approved
Other Electrical Service: Unsure of new electrical requirements $60,000.00 $60,000.00 Costs of electrical and decommissioning work of our old transmitters (high voltage transformers, electrical panels. Also included is an electrical project manager to oversee this aspect. We were not aware when we were budgeting this project all the issue. $59,152.00 This is a new line item for the 399. When we were originally budgeting, we did not realize that we would have all the decommissioning expense with dumpster charges and electrical project management charges
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW $947,000.00 $802,000.00 I have included the equipment package drawings that Rohde and Schwarz have developed for the transmitter site. Please look at the actual invoices for substantiation of the estimated cost $801,746.04 The Rohde and Schwarz invoice for the detailed drawings has created the overage. Please remove the 2nd Rohde and Schwarz as the name is incorrect and the attachment doesn't have the info requested

Components

Actual Information Description File Name
UHF inside RF system including switching Information not provided.
20 Ton system

Component Description:
N/A
Amount:
N/A

Component Description:
Interim Transmitter Replacement AC Unit Libert#1 -includes Labor , Materials and Subcontractors
Amount:
$107,432.50
Transformer 3 phase/480v - 300 KVA Information not provided.
Switchgear - industrial 800 amp Information not provided.
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW

Component Description:
75% of the 15.5kW/14.5kW OFMD Transmitter System Interim
Amount:
$312,205.13

Component Description:
25% down payment 15.5 kW/14.5 kW of MD Transmitter System
Amount:
$104,068.38
MASK Filter Information not provided.
30 Ton system

Component Description:
Primary Transmitter Replacement AC Unit
Amount:
$107,432.50

Component Description:
Primary Transmitter Replacement AC Unit. Both the Primary and backup are the same tonnage and the vendor quote for both units combined are on page 36 of the PDF
Amount:
$107,432.50
Other Electrical Service: Unsure of new electrical requirements

Component Description:
We have put a new line item in the 399 to accommodate this invoice- as when we were writing the budget, we did not anticipate these expenses
Amount:
$59,152.00
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW

Component Description:
25% down of the main transmitter- PO and Quote also attached
Amount:
$196,481.32

Component Description:
Detailed drawing Package of the WMHT Transmitter Site
Amount:
$15,820.74

Component Description:
75% of the payment for the 31k/W ATSC/28kw OFDM Transmitter System
Amount:
$589,443.98

Component Description:
Detailed drawing -comprehensive coverage field study
Amount:
$15,820.74

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,358,249.60 $173,283.60 N/A $104,739.19 N/A
Total for all systems $4,225,389.60 $2,460,803.96 N/A $1,820,497.59 N/A
Primary Antenna TUD-05-12/60H-1-B $1,019,140.00 $61,470.00 $5,760.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $0.00 N/A N/A N/A
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) $18,950.00 $6,000.00 1/3 of the cost of $18,000 N/A N/A
Combiner output splitting/switching for dual feed lines, if applicable $126,000.00 $0.00 N/A N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $53,335.00 1/3 of the cost N/A N/A
UHF - High Power Top Mount (200-1000 kW), Four Station broadband panel antenna, horizontally polarized $778,000.00 $0.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $2,135.00 1/3 of the cost of $6400 $5,760.00 The estimate was for 30% down, this invoice is for 45% down
Auxiliary Antenna TU Deltastar $339,109.60 $111,813.60 $98,979.19
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $2,599.99 N/A
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 20 horizontally polarized $2,000.00 $2,000.00 This is a duplicate line- please ignore N/A N/A
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 20 horizontally polarized $78,069.60 $78,069.60 ***System Notice: Estimate adjusted and locked because line has been superseded.***Our current aux antenna is cut for channel 34 only (reference RF sweep) and will need to be replaced for our new channel $78,069.60 N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $13,320.00 required for new side mount aux antenna $11,988.00 N/A
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) $13,700.00 $7,024.00 required as per RF sweep $6,321.60 N/A
Combiner output splitting/switching for dual feed lines, if applicable $126,000.00 $0.00 N/A N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $0.00 N/A N/A N/A

Components

Actual Information Description File Name
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) Information not provided.
Combiner output splitting/switching for dual feed lines, if applicable Information not provided.
New combiner, cost per channel (without antenna) Information not provided.
UHF - High Power Top Mount (200-1000 kW), Four Station broadband panel antenna, horizontally polarized Information not provided.
Sweep test of existing antenna

Component Description:
45% of the Repack Sweep includes 1 Field Engineer on-Site for the Day, Travel, Expenses and Report
Amount:
$2,880.00

Component Description:
Repack Sweep includes 1 Field Engineer on site for 1 day, travel expenses and report 45% down
Amount:
$2,880.00
Sweep test of existing antenna

Component Description:
Completion of the electrical report after the RF Sweep. Invoice split among the 3 stations WMHT, WTEN and WCWN. Vendor was unwilling to make separate invoices.
Amount:
$1,733.33

Component Description:
WMHT Aux System Sweep Test; 3 stations on invoice- WMHT listed - which is 1/3 of the total upon proposal acceptance
Amount:
$866.66
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 20 horizontally polarized Information not provided.
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 20 horizontally polarized

Component Description:
Part #400001434 45% down
Amount:
$39,034.80

Component Description:
Product 400001434 45% down
Amount:
$39,034.80
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
Product 400001435 45% down
Amount:
$5,994.00

Component Description:
45% down on Product #400001435
Amount:
$5,994.00
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
Product # 40001436 - 45% down
Amount:
$3,160.80

Component Description:
Product #40001436 45% down
Amount:
$3,160.80
Combiner output splitting/switching for dual feed lines, if applicable Information not provided.
New combiner, cost per channel (without antenna) Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $0.00 $105,275.00 N/A $37,894.50 N/A
Total for all systems $4,225,389.60 $2,460,803.96 N/A $1,820,497.59 N/A
Primary Transmission Line $0.00 $63,170.00 $0.00
Rigid Transmission Line - copper, 8 3/16" broadband $0.00 $63,170.00 existing transmission line does not support the new channel assignments, this represents 1/3 of the cost of 189,500 N/A N/A
Auxiliary Transmission Line $0.00 $42,105.00 $37,894.50
Rigid Transmission Line - copper, 6 1/8" broadband $0.00 $42,105.00 existing transmission line does not support the new channel assignment. $37,894.50 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 8 3/16" broadband Information not provided.
Rigid Transmission Line - copper, 6 1/8" broadband

Component Description:
RTLSCR3-20 45% down
Amount:
$1,399.28

Component Description:
Product 300006758 45% down; 1 penny rounding
Amount:
$17,547.97

Component Description:
Product #RTLSCR3-20 45% down
Amount:
$1,399.28

Component Description:
Product #300006758 45% down.
Amount:
$17,547.97

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $254,800.00 $82,395.00 N/A $5,724.67 N/A
Total for all systems $4,225,389.60 $2,460,803.96 N/A $1,820,497.59 N/A
Primary Tower TOWER $254,800.00 $82,395.00 $5,724.67
Structural engineering tower load study for well documented tower $12,600.00 $5,725.00 We needed another tower climb to understand what was on our tower; hence the tower climb which increased the cost. $5,724.67 We realized that as we were putting up new equipment, we needed to review the tower to understand the stresses- the total amount is not greater than the budgeted amount and the estimated amount has been adjusted.
Minor tower reinforcement/modifications $158,000.00 $50,000.00 1/3 of the cost of $150000 N/A N/A
Short Tower (less than 500') $84,200.00 $26,670.00 1/3 of the cost of $80000 N/A N/A

Components

Actual Information Description File Name
Structural engineering tower load study for well documented tower

Component Description:
Please delete earlier 7291. Pdf includes travel backup. Invoice has been divided by 3 - Vendor has refused to issue 3 separate invoices; these stations are being repacked in the same phase, the total cost is being divided by 3.
Amount:
$1,558.00

Component Description:
Tower climb of shared transmission tower- invoice divided by the 3 stations
Amount:
$1,558.00

Component Description:
Analysis of the 435' Guyed Tower for WTEN, WMHT and WCWN split evenly among the 3 stations
Amount:
$2,500.00

Component Description:
Tower mapping of our shared transmission tower/facility
Amount:
$1,666.67
Minor tower reinforcement/modifications Information not provided.
Short Tower (less than 500') Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $313,440.00 $237,750.00 N/A $57,668.92 N/A
Total for all systems $4,225,389.60 $2,460,803.96 N/A $1,820,497.59 N/A
Outside Professional Services $313,440.00 $237,750.00 $57,668.92
In house project management and time $90,000.00 $90,000.00 As we were unable to hire a consultant, this project is taking many more hours than we originally budgeted. This reforecast should take us to the end of the project. $43,898.92 Cu Long ETV IV needs to be deleted; IL-12-31-2017 Invoice for $29,602.44 needs to be deleted
RF Exposure Measurements $21,050.00 $20,000.00 N/A N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $7,000.00 Currently our invoices (not submitted but will be) currently $6,120. The actual invoices attached should be substantiation for the estimated costs $6,120.00 We needed a group PO and purchase agreement as 2 of our vendors refused to take individual invoices but wanted 1 invoice with the individual amount broken out. The POs then had to be approved by Nexstar and Sinclar as we are on a joint tower
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $1,404.00 N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A $3,621.00 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A $125.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $500.00 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A $2,000.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A N/A N/A
Project management of the transition $79,000.00 $7,500.00 N/A $0.00 Please delete this invoice. This invoice has its own budget now so this portion can be deleted- thanks.
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A N/A N/A

Components

Actual Information Description File Name
In house project management and time

Component Description:
6/18 Internal Labor-More work at the CRB or Capital Region Broadcasters shared/joint tower. Install, proofing of Rohde & Schwarz transmitter w/ LaCorte electrical
Amount:
$3,973.76

Component Description:
Second January 2018 invoice for labor. We submitted the first one with just December 2017- paid in 2018- see last page for detailed reason. CRB is joint/shared tower
Amount:
$449.47

Component Description:
4/18 Internal Labor. Continued work with vendors at the CRB/Capital Region Broadcasters tower site. CRB/Capital Region is the shared tower/jointly owned tower.
Amount:
$8,603.04

Component Description:
9/17 Internal Labor- CRB is the joint/shared tower for all the broadcasters. Monthly, weekly and even daily meetings due to the repack. Matthew Saplin is the Assistant Chief Engineer.
Amount:
$2,607.54

Component Description:
Internal Labor for Feb 28, 2017. CRB LLC is the name of the Joint Tower org. that all the commercial/non-commercial are on..Monthly and weekly meetings are scheduled. Robert Cummings is the WMHT-CRB engineering representative
Amount:
$95.08

Component Description:
5/18 Internal Labor. Rohde & Schwarz installs, Dielectric delivery all at the CRB- Capital Region Broadcasters joint/shared tower.
Amount:
$1,968.17

Component Description:
Internal Labor-03/31. CRB is the shared tower that all the TV stations are located on. Monthly and weekly meetings are scheduled. Cuong Le is the ET IV, Robert Cummings is the CRB-WMHT rep.
Amount:
$890.34

Component Description:
6/17 Internal Labor. CRB or Capital Region Broadcasters is the name of the LLC of the shared tower of all the broadcasters in our local area. Meetings with vendors are common due to the repack and purchase of equip.
Amount:
$1,959.99

Component Description:
5/17 Internal Labor. CRB is the shared tower of the TV broadcasters. Meetings with vendors due to the repack are noted on this schedule.
Amount:
$1,114.42

Component Description:
4/30/17 Internal Labor. CRB is the shared tower that all the broadcasters are on. Weekly and monthly meetings due to repack issues. WMHT, WTEN and WCWN are 3 stations that are being repacked in the same phase.
Amount:
$1,389.51

Component Description:
07/17 Internal Labor. CRB or Capital Region Broadcasters the joint/shared tower that all the broadcasters including. WMHT are on. Weekly meetings are common as there are many equip decisions to make.
Amount:
$3,022.62

Component Description:
8/17 Internal Labor. Nexstar is the corporate owner of WTEN- one of the stations on the joint/shared CRB tower being repacked in the same phase.
Amount:
$810.48

Component Description:
October 17 Internal Labor. Meetings with Rohde & Schwarz- listed as R/S meetigs
Amount:
$921.33

Component Description:
12/17 Internal Labor. Capital Region Broadcasters is the shared/joint tower where all the local broadcasters share this tower - clean up of the site and meetings are part of the repack effort.
Amount:
$4,209.66

Component Description:
11/17 Internal Labor. R&S or R/S is Rohde & Schwarz; CRB is the joint tower; Dielectric & PCI vendors
Amount:
$3,343.30

Component Description:
3/18 Internal Labor. Continued Work at the CRB/ Capital Region Broadcasters (joint/shared tower) site- with equipment installs
Amount:
$5,188.49

Component Description:
2/18 Internal Labor. CRB is the joint/shared tower - much work being done at this site from R/S- Rohde &Schwarz to electricians(Lacorte) and Walters- Air conditioning along with issues with snow removal
Amount:
$2,824.89

Component Description:
all 3 employees on one invoice as requested
Amount:
$29,602.44

Component Description:
Cu Long ETV IV total of 100 hours at $23.54 per hour
Amount:
$2,354.00

Component Description:
all employees on one invoice per request
Amount:
$526.83
RF Exposure Measurements Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations

Component Description:
Draft collective purchasing agreement for the shared equipment of WMHT, WTEN and WCWN
Amount:
$4,800.00

Component Description:
Single invoice review after draft of collective purchasing agreement.
Amount:
$80.00

Component Description:
fees are for drafting a PO and agreement for all our shared equipment to be repacked We- WMHT, WTEN and WCWN are owners of the Capital Region Broadcasters LLC (aka CRB).
Amount:
$280.00

Component Description:
Reviewing the engineers regarding the collective purchasing agreement
Amount:
$80.00

Component Description:
Review Sinclair changes and finalized contract and group PO
Amount:
$880.00
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
There are 2 sub-totals on this sheet- one for general legal and the other for the repack legal work. (aka transition reimbursable)- we are claiming just for the transition reimbursable
Amount:
$1,404.00
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application

Component Description:
This invoice includes other expenses outside of the Television Repacking. The television repacking is only 975
Amount:
$975.00

Component Description:
Television repacking expenses are segregated and other expenses are included
Amount:
$117.00

Component Description:
Television repacking expense is segregated from the other expenses in this invoice. EIN # changed due to change in corporate structure. New W-9 attached along with discussion.
Amount:
$39.00

Component Description:
Television Repacking Expense broken out- other expenses are on this invoice
Amount:
$1,944.00

Component Description:
This invoice has includes other expenses. The television repacking expense has been segregated.
Amount:
$351.00

Component Description:
Television Repacking Expense is segregated from other invoice expenses.
Amount:
$195.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application

Component Description:
Prepare the engineering section of FCC Form 2100
Amount:
$125.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Engineering study work for new channel assignment and antenna development
Amount:
$250.00

Component Description:
Engineering study work for new channel assignment and antenna development
Amount:
$250.00
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application

Component Description:
Prepare the engineering section of FCC Form 2100
Amount:
$2,000.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Project management of the transition

Component Description:
Please delete this invoice; the full amount of this invoice including this has its own line item- thanks.
Amount:
$2,800.00
Prepare and or review reimbursement form Information not provided.
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Perform engineering study for new channel assignment and antenna development Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $52,100.00 $52,045.00 N/A $15,001.26 N/A
Total for all systems $4,225,389.60 $2,460,803.96 N/A $1,820,497.59 N/A
Other Expenses $52,100.00 $52,045.00 $15,001.26
Facility Heat $6,625.00 $6,625.00 1/3 cost of $19,875 for new facility heat system, shared cost with WTEN and WCWN. Due to heat for the facility was being supplied by the old tube transmitters excess heat which are no longer there N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
Equipment Delivery and Handling Charges $10,000.00 $10,000.00 Unknown cost at this time $7,003.70 N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $7,500.00 $7,500.00 Unknown cost at this time $3,200.56 The Rohde and Schwarz invoice has been moved to a separate line item in the 399; . The correct invoice is for $3,038.56 Once the Rhode and Schwarz invoices are deleted then this line item is no longer in an overage situation
Equipment Storage $9,000.00 $9,000.00 We do not have any place to store the equipment as it received $4,797.00 N/A
Develop and air announcement of upcoming channel change $2,000.00 $2,000.00 need to let our viewers know of the channel change N/A N/A
MVPD Notification of Channel Change $2,000.00 $2,000.00 N/A N/A N/A
Rigging $13,335.00 $13,335.00 1/3 of the total cost of $40000 N/A N/A

Components

Actual Information Description File Name
Facility Heat Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Rental of a fork-lift to move the new and old equipment at the site. Needed additional time due to the delivery of a transmitter cabinet
Amount:
$853.50

Component Description:
Rental of 1 four wheel drive forklift to move all the equipment old and new
Amount:
$1,450.00

Component Description:
Rental of 1 four wheel drive forklift to move all the equipment new and old for the repack
Amount:
$1,450.00

Component Description:
Rental of one four wheel drive forklift- to move all the equipment new and old for the repack
Amount:
$1,670.00

Component Description:
We needed snow removal at the site in order to receive the equipment- we had 3 noreasters in a row
Amount:
$1,240.00

Component Description:
For moving transformer oil drums
Amount:
$340.20
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Used barrels to store transmitter oil- purchased on Craig's List - no quote as this was purchased used and on-line
Amount:
$64.80

Component Description:
Needed more barrels for the used oil- purchased used barrels on line via Craig's list- no quote available
Amount:
$97.20

Component Description:
This for the expense of the safe disposal of the mineral oil from our Comark transmitter beam supply transformers- please delete other Safety -Kleen component
Amount:
$3,038.56

Component Description:
Please delete this line item- the entire invoice has been moved to a separate line item.
Amount:
$54,452.00

Component Description:
Please delete this line item; this entire invoice has been moved to a separate budget item
Amount:
$1,900.00

Component Description:
Safe disposal of the mineral oil from Comark transmitter
Amount:
$2,813.48
Equipment Storage

Component Description:
Storage Containers for the Repack Equipment
Amount:
$3,880.00

Component Description:
Pallet Jack, Load Capacity 5000 lbs Manufacturer #12U125- to move the equipment
Amount:
$917.00
Develop and air announcement of upcoming channel change Information not provided.
MVPD Notification of Channel Change Information not provided.
Rigging Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $4,225,389.60 $2,460,803.96 $1,820,497.59

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Julie Raskin

Vice President Finance and Administration


09/25/2018

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Julie Raskin

Vice President Finance and Administration


09/25/2018