Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Valley Public Television, Inc. Doing Business As: ValleyPBS |
Phyllis Brotherton 1544 VAN NESS AVENUE FRESNO, CA 93721 United States |
+1 (559) 266-1800 | pbrotherton@valleypbs.org | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Ann Bobeck Legal Counsel Covington and Burling LLP |
Ann Bobeck One CityCenter 850 10th Street NW Washington , DC 20001 United States |
+1 (202) 662-5719 | abobeck@cov.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Decommission side mount antenna, install new interim broadband antenna and new interim broadband transmitter. Decommission top mount antenna, install new top mount Ch 32 antenna and new main transmitter. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Diamond | |
Year | 2004 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 7.8 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | ULXTE-16 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 10.8 kW | |
Justification for New Transmitter | The current transmitter (Harris - Diamond) can not be re-tuned to be used for the new frequency. Kindly find attached a letter from the manufacturer that states this. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Grounding work and other electrical work | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Uninstall fees |
Uninstalling the current transmitters to make room for the new transmitter |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase | |
Manufacturer | ||
Model | ULXTE-30 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 15.4 kW | |
Justification for New Transmitter | Interim transmitter needed to stay on-air while top-mount antenna and old transmitter are replaced. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Grounding work and other electrical work | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A | |
Inside RF System | Is an additional interior RF system required to support this interim transmitter? | Yes |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this antenna currently shared with any other stations? | No | |
Is this antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 250.0 kW | |
Manufacturer | ||
Model | ATW20HS6H-HTS-40H | |
Year | 2004 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 213.0 kW | |
Manufacturer | ||
Model | ATW18H6-ETC3-32H | |
Year | 2017 | |
Justification for New Antenna | Current antenna cannot broadcast on new frequency range |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Uninstall fees |
Uninstall current antenna |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 8 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 698.00 MHz | |
Design power capacity in use | 100.0 % | |
Other Antenna Type | N/A | |
ERP: | 213.0 kW | |
Manufacturer | ||
Model | TFU-8WB-R S230 | |
Year | 2017 | |
Justification for New Antenna | Need interim antenna to stay on-air while main antenna and transmitter are being replaced. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Andrew |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 250 feet per run |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Auxiliary (Backup) | |
Description of Use | Backup | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmission currently shared with any other stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Andrew |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 175 feet per run |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | Terrain Constrained | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1014534 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 44' 45.0" N- |
Longitude (NAD83) | 119° 16' 55.0" W- | |
Overall Structure Height | 244.75 feet | |
Support Structure Height | 199.80 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 3395.96 feet | |
Structure Type | NTOWER - Multiple Structures | |
Tower Owner | Valley Public Television, Inc. | |
Date Constructed | 01/01/1953 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | Yes |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 120 | |
Explanation | We do not have the qualified staff to manage the scale and complexity of this type of project. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 3 | |
Justification | We do not have the qualified staff with the expertise to do this in-house. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Tower Lease Agreement modifications |
renegotiate the lease for the current tower site and transmitter |
Zoning and local permits |
fees for local permit by Fresno county planning commission |
Other Distribution Transmission System Expense |
Equipment to provide capability of dual transport stream during overlap Sept 14 testing to Nov. 30, to ensure smooth transition. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,517,869.00 | $1,255,037.43 | N/A | $460,796.40 | N/A |
Total for all systems | $3,285,796.19 | $2,705,813.63 | N/A | $1,037,332.58 | N/A |
Interim Transmitter ULXTE-30 | $894,100.00 | $735,609.56 | $0.00 | ||
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $535,609.56 | N/A | N/A | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $13,700.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | N/A | N/A |
Other Electrical Service: Grounding work and other electrical work | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
UHF inside RF system including switching | $147,500.00 | $140,000.00 | N/A | N/A | N/A |
Primary Transmitter ULXTE-16 | $623,769.00 | $519,427.87 | $460,796.40 | ||
Uninstall fees | $66,669.00 | $66,669.00 | remove both existing transmitters to make room for new transmitters | $45,308.61 | N/A |
Other Electrical Service: Grounding work and other electrical work | $10,000.00 | $10,000.00 | N/A | $3,392.06 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | N/A | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $13,700.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | $494,500.00 | $392,758.87 | Added $797.50 for Gates Air Change Order No. 1, dated 10/5/2017 per attached. | $412,095.73 | Original estimate included only the Gates Air transmitter quote and, inadvertently, did not include other services by vendors for installation, parts, supplies, site services, etc. |
Actual Information Description | File Name |
---|---|
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | Information not provided. |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
Other Electrical Service: Grounding work and other electrical work | Information not provided. |
UHF inside RF system including switching | Information not provided. |
Uninstall fees | |
Other Electrical Service: Grounding work and other electrical work | |
Switchgear - industrial 800 amp | Information not provided. |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $845,575.00 | $484,649.01 | N/A | $430,591.93 | N/A |
Total for all systems | $3,285,796.19 | $2,705,813.63 | N/A | $1,037,332.58 | N/A |
Interim Antenna TFU-8WB-R S230 | $407,410.00 | $102,682.34 | $78,719.13 | ||
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $5,000.00 | Side mount brackets | $2,584.30 | N/A |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized | $189,500.00 | $87,673.90 | N/A | $71,126.39 | N/A |
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized | $189,500.00 | $5,008.44 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $5,008.44 | N/A |
Primary Antenna ATW18H6-ETC3-32H | $438,165.00 | $381,966.67 | $351,872.80 | ||
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $556.14 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $233,631.67 | N/A | $209,381.66 | N/A |
Uninstall fees | $141,935.00 | $141,935.00 | includes removal of existing antennas and installation of main and interim antenna | $141,935.00 | N/A |
Actual Information Description | File Name |
---|---|
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized | |
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized | |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | |
Uninstall fees |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $0.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $3,285,796.19 | $2,705,813.63 | N/A | $1,037,332.58 | N/A |
Primary Transmission Line | $0.00 | $0.00 | $0.00 | ||
Auxiliary Transmission Line | $0.00 | $0.00 | $0.00 |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $655,300.00 | $623,100.00 | N/A | $67,557.25 | N/A |
Total for all systems | $3,285,796.19 | $2,705,813.63 | N/A | $1,037,332.58 | N/A |
Primary Tower NTOWER | $655,300.00 | $623,100.00 | $67,557.25 | ||
Minor tower reinforcement/modifications | $158,000.00 | $150,000.00 | N/A | $44,513.97 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $23,100.00 | N/A | $23,043.28 | N/A |
Tower Helicopter Lift | $50,000.00 | $50,000.00 | N/A | N/A | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $400,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Minor tower reinforcement/modifications | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Tower Helicopter Lift | Information not provided. |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $164,920.00 | $248,750.00 | N/A | $74,605.60 | N/A |
Total for all systems | $3,285,796.19 | $2,705,813.63 | N/A | $1,037,332.58 | N/A |
Outside Professional Services | $164,920.00 | $248,750.00 | $74,605.60 | ||
Additional Field Engineering Service, 3 Days | $10,000.00 | $10,000.00 | N/A | $6,633.54 | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | $3,960.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | $1,098.65 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $5,297.25 | Underestimated. More work that anticipated. Issues with online FCC forms, assistance from legal. |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $927.70 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $2,056.60 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $3,824.10 | Underestimated. Additional legal advice needed, including work to determine if need to move the tower from current lease site. |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $7,000.00 | More consultant engineering work than anticipated on channel reassignment, maximizing signal strength, tech. app. to increase ERP. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $2,600.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Project management of the transition | $18,960.00 | $110,000.00 | $25,000 to Gates Air to negotiate with all vendors, hire subcontractors, etc. $85,000 to professional consultant, Chis Homer, to provide oversight of repack project, due to lack of in-house expertise. $60K plus travel exp. | $41,207.76 | N/A |
Actual Information Description | File Name |
---|---|
Additional Field Engineering Service, 3 Days | |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Prepare and or review reimbursement form | |
Address transition timing and coordination issues w/ other stations and wireless | |
Perform engineering study for new channel assignment and antenna development | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $102,132.19 | $94,277.19 | N/A | $3,781.40 | N/A |
Total for all systems | $3,285,796.19 | $2,705,813.63 | N/A | $1,037,332.58 | N/A |
Other Expenses | $102,132.19 | $94,277.19 | $3,781.40 | ||
Other Distribution Transmission System Expense | $28,942.19 | $28,942.19 | Not contemplated in original estimates for repack. Cost of microwave link to provide capability of dual stream transmission on Ch. 40 and 32 from KVPT receive site to Bakersfield site, during overlap period from Sept. 14 through November 30, 2018. | $0.00 | N/A |
Other Distribution Transmission System Expense | $10,000.00 | $10,000.00 | Need for dual transport stream transmission from KVPT studio to transmitter site to provide both existing Ch. 40 and Ch. 32 repack channel during testing Sept. 14 to Nov. 30 to ensure smooth transition without interruption. | $0.00 | N/A |
Zoning and local permits | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Tower Lease Agreement modifications | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
MVPD Notification of Channel Change | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Equipment Storage | $0.00 | $0.00 | included in other quotes | N/A | N/A |
Equipment Delivery and Handling Charges | $0.00 | $0.00 | included in other quotes | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $0.00 | $0.00 | included in other quotes | N/A | N/A |
Non-zoning permits | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Local Zoning | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | $31.40 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $3,750.00 | N/A | $3,750.00 | N/A |
Actual Information Description | File Name |
---|---|
Other Distribution Transmission System Expense | |
Other Distribution Transmission System Expense | |
Zoning and local permits | Information not provided. |
Tower Lease Agreement modifications | Information not provided. |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Non-zoning permits | Information not provided. |
Local Zoning | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,285,796.19 | $2,705,813.63 | $1,037,332.58 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Phyllis Brotherton Acting CEO 07/16/2018 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Phyllis Brotherton Acting CEO 07/16/2018 |