Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | see attached transition plan |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma CD3300P3 | |
Year | 2001 | |
Type | Inductive Output Tube | |
IOT Power Type | Three | |
Power Capacity | 62.8 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-100 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 62.9 kW | |
Justification for New Transmitter | Existing IOT transmitter cannot be converted to post-transition channel, see GatesAir EOL and HTV IOT to Solid-State Justification statements. An IOT replacement is more expensive than proposed SS transmitter. See attached Comark IOT Transmitter quote. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Transmitter installation electrical service | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 15 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 3200.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Shipping |
Transmitter shipping |
Sales Tax |
transmitter sales tax |
Electrical Accessories |
Manufacturer required surge protection |
RF Accessories |
Additional RF components required for transmitter operation |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Lease New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Bottom | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-30GBH 08 | |
Year | 2002 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Lease New | |
Is this a request for upgraded equipment? | No | |
Ownership | Leased | |
Owner | American Tower Corp. | |
Is antenna shared? | Yes | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 3 | |
Number of Panels/Bays | 56 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 680.00 MHz | |
Design power capacity in use | 60.0 % | |
Other Antenna Type | N/A | |
ERP: | 940.0 kW | |
Manufacturer | ||
Model | RFS PEPL56D VPT | |
Year | 2018 | |
Justification for New Antenna | Current antenna is channel specific and cannot be used on post-transition channel. Antenna must be replaced. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 3 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 7 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
19 |
18 |
27 |
Name | Description |
---|---|
Combiner Installation |
WMOR portion of combiner installation per attached ATC documentation |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Lease New | |
Ownership | Leased | |
Owner | American Tower Corp. | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 24 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 860.00 MHz | |
Design power capacity in use | 41.0 % | |
Other Antenna Type | N/A | |
ERP: | 940.0 kW | |
Manufacturer | ||
Model | IRTE 8 - 8 - 8 I230EH | |
Year | 2018 | |
Justification for New Antenna | interim antenna required while main antenna is replaced. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 6 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
29 |
18 |
Name | Description |
---|---|
Combiner Installation |
WMOR portion of combiner installation per attached ATC documentation |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Lease New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1770 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Lease New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 2 | |
Length | 1770 feet per run | |
Justification for New Transmission Line | ATC is replacing WMOR and WXPX antenna stack with a BBA. The entries are based on information from ATC. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Lease New | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Segment Length | Broadband | |
Other Segment Length | ||
Number of parallel runs | 2 | |
Length | 1440 feet per run | |
Justification for New Transmission Line | required for interim antenna |
Name | Description |
---|---|
Additional RF components |
install of 6 1/8" line with up to 6 tunable elbows from combiner to WMOR transmitter. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1057473 | |
Coordinates (NAD83) | Latitude (NAD83) | 27° 49' 10.8" N- |
Longitude (NAD83) | 082° 15' 38.0" W- | |
Overall Structure Height | 1592.83 feet | |
Support Structure Height | 1443.88 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 75.13 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers, LLC. | |
Date Constructed | 09/07/2011 |
Facility ID | Call Sign | Service |
---|---|---|
23078 | WMTX | FM |
6601 | WXPX-TV | DTV |
11125 | WCLF | DTV |
11290 | WTSP | DTV |
16788 | WVEA-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for tower with candelabra |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Permit |
Tower permit drawing package |
Grounds and Building |
The generation of a construction drawing package for one (1) broadcasters/customers. |
Project Management |
(15) hours on Modification project management, (10) hours allotted for civil installation management and one-hundred (25) hours for RF installation project management for a total of twenty (25) days, |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 210 | |
Explanation | Additional RF experience needed in planning and execution and ATC tower project management | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | Yes | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
RF System Test |
Testing of the combiner to ensure all frequencies are tuned for optimal patterns. |
Migratory Birds |
Migratory Birds Assessment |
Site Coordination |
Site Coordination Meeting |
Transmitter Site Survey |
Transmitter planning survey & transmitter building drawings |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Compound Fencing |
The replacement of existing fencing in the compound area where the construction and additional equipment is being installed, some of the fencing will require reconfiguration once all repack construction is completed. |
Road Upgrades |
cost of repairing the road - See ATC documentation |
Security |
Site security for installatiion and storage of Transmission line and materials for 15 days X 12 hours. These materials are a high risk of theft due to the material makeup such as copper, brass and aluminum. |
One-time tower rental |
ATC one-time tower rental during market repack period per attached ATC documentation |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,185,846.00 | $2,151,246.00 | N/A | $523,869.19 | N/A |
Total for all systems | $5,337,111.00 | $3,304,893.00 | N/A | $547,606.69 | N/A |
Primary Transmitter ULXTE-100 | $2,185,846.00 | $2,151,246.00 | $523,869.19 | ||
RF Accessories | $77,737.00 | $77,737.00 | Additional RF components required for transmitter operation and integration into current RF environment per GatesAir quote. | N/A | N/A |
Electrical Accessories | $7,500.00 | $7,500.00 | third party surge protection - quote attached. | N/A | N/A |
Sales Tax | $129,176.00 | $129,176.00 | transmitter sales tax per attached GatesAir quote | N/A | N/A |
Shipping | $17,300.00 | $17,300.00 | transmitter shipping per attached GatesAir quote | N/A | N/A |
Other -- Building Addition Size: 3200.0 | $76,000.00 | $76,000.00 | This cost is to provide a building expansion for a 2 story building. See ATC documentation for full explanation. | N/A | N/A |
15 Ton system | $55,800.00 | $21,200.00 | N/A | N/A | N/A |
Other Electrical Service: Transmitter installation electrical service | $94,000.00 | $94,000.00 | main transmitter installation electrical service see attached quote | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 62.9 kW | $1,728,333.00 | $1,728,333.00 | GatesAir quote sections A, B & E. This is the transmitter, mask filter, installation and proof per the FCC "transmitter" definition. | $523,869.19 | N/A |
Actual Information Description | File Name |
---|---|
RF Accessories | Information not provided. |
Electrical Accessories | Information not provided. |
Sales Tax | Information not provided. |
Shipping | Information not provided. |
Other -- Building Addition Size: 3200.0 | Information not provided. |
15 Ton system | Information not provided. |
Other Electrical Service: Transmitter installation electrical service | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 62.9 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $399,332.00 | $310,589.00 | N/A | $0.00 | N/A |
Total for all systems | $5,337,111.00 | $3,304,893.00 | N/A | $547,606.69 | N/A |
Interim Antenna IRTE 8 - 8 - 8 I230EH | $148,227.00 | $84,597.00 | $0.00 | ||
Combiner Installation | $3,500.00 | $3,500.00 | WMOR portion of combiner installation cost per attached ATC documentation | N/A | N/A |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $5,000.00 | per attached ATC documentation | N/A | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $33,000.00 | per attached ATC documentation | $0.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $3,000.00 | N/A | N/A | N/A |
UHF - High Power, Side Mount, broadband panel, 24 bay,, 940 kW input, directional,, elliptically or circularly polarized | $40,097.00 | $40,097.00 | WMOR portion of interim antenna cost per attached ATC documentation | N/A | N/A |
Primary Antenna RFS PEPL56D VPT | $251,105.00 | $225,992.00 | $0.00 | ||
Combiner Installation | $7,000.00 | $7,000.00 | WMOR portion of combiner installation cost per attached ATC documentation. | N/A | N/A |
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | $16,850.00 | $10,667.00 | WMOR portion of elbow complex cost per attached ATC documentation | N/A | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $66,000.00 | WMOR portion of combiner cost per attached ATC documentation | N/A | N/A |
UHF - High Power Top Mount Three Station broadband panel antenna elliptically or circularly polarized | $136,325.00 | $136,325.00 | WMOR portion of main antenna cost per attached ATC documentation | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,890,380.00 | $447,050.00 | N/A | $0.00 | N/A |
Total for all systems | $5,337,111.00 | $3,304,893.00 | N/A | $547,606.69 | N/A |
Interim Transmission Line | $711,560.00 | $165,800.00 | $0.00 | ||
Rigid Transmission Line - copper, 6 1/8" broadband | $668,160.00 | $122,400.00 | WMOR portion of interim transmission line. See attached ATC documentation. | N/A | N/A |
Additional RF components | $43,400.00 | $43,400.00 | ATC charge for transmission line from WMOR transmitter to ATC combiner. See attached ATC documentation. | N/A | N/A |
Primary Transmission Line | $1,178,820.00 | $281,250.00 | $0.00 | ||
Rigid Transmission Line - copper, 7 3/16" broadband | $1,178,820.00 | $281,250.00 | WMOR portion of transmission line. See attached ATC documentation. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $614,650.00 | $197,488.00 | N/A | $0.00 | N/A |
Total for all systems | $5,337,111.00 | $3,304,893.00 | N/A | $547,606.69 | N/A |
Primary Tower GTOWER | $614,650.00 | $197,488.00 | $0.00 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $120,750.00 | per ATC documentation | N/A | N/A |
Structural engineering tower load study for a documented tower with candelabra | $20,000.00 | $11,088.00 | per ATC documentation | N/A | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $50,000.00 | per ATC documentation | N/A | N/A |
Project Management | $6,250.00 | $6,250.00 | per ATC documentation | N/A | N/A |
Tower Permit | $4,700.00 | $4,700.00 | per ATC documentation | N/A | N/A |
Grounds and Building | $4,700.00 | $4,700.00 | per ATC documentation | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $135,623.00 | $88,805.00 | N/A | $23,737.50 | N/A |
Total for all systems | $5,337,111.00 | $3,304,893.00 | N/A | $547,606.69 | N/A |
Outside Professional Services | $135,623.00 | $88,805.00 | $23,737.50 | ||
Transmitter Site Survey | $20,600.00 | $20,600.00 | transmitter site survey per attached quote Transmitter planning survey & transmitter building drawings | $20,600.00 | N/A |
Site Coordination | $1,500.00 | $1,500.00 | per ATC documentation | N/A | N/A |
Migratory Birds | $438.00 | $438.00 | per ATC documentation | N/A | N/A |
RF System Test | $5,000.00 | $5,000.00 | per ATC documentation | N/A | N/A |
RF Exposure Measurements | $21,050.00 | $3,750.00 | N/A | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $167.00 | N/A | N/A | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $1,250.00 | N/A | N/A | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $1,350.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $5,000.00 | N/A | $3,137.50 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $33,180.00 | $24,000.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Site Survey | |
Site Coordination | Information not provided. |
Migratory Birds | Information not provided. |
RF System Test | Information not provided. |
RF Exposure Measurements | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
NEPA Section 106 environmental review, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Project management of the transition | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $111,280.00 | $109,715.00 | N/A | $0.00 | N/A |
Total for all systems | $5,337,111.00 | $3,304,893.00 | N/A | $547,606.69 | N/A |
Other Expenses | $111,280.00 | $109,715.00 | $0.00 | ||
One-time tower rental | $57,600.00 | $57,600.00 | ATC one-time tower rental during market repack period per attached ATC documentation. | N/A | N/A |
Security | $2,250.00 | $2,250.00 | per ATC documentation | N/A | N/A |
Road Upgrades | $3,750.00 | $3,750.00 | per ATC documentation | N/A | N/A |
Compound Fencing | $2,500.00 | $2,500.00 | per ATC documentation | N/A | N/A |
MVPD Notification of Channel Change | $2,500.00 | $2,500.00 | Attorney assistance in coordinating MVPD notification | N/A | N/A |
Develop and air announcement of upcoming channel change | $2,500.00 | $2,500.00 | Attorney review to ensure FCC compliance | N/A | N/A |
Equipment Delivery and Handling Charges | $6,250.00 | $6,250.00 | per ATC documentation | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $21,100.00 | $21,100.00 | Tansmitter removal required to make space for replacement transmitter. See attached quote. | N/A | N/A |
Local Zoning | $750.00 | $750.00 | per ATC documentation | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $10,000.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $5,337,111.00 | $3,304,893.00 | $547,606.69 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | John Drain Hearst Television SVP Chief Financial Officer 02/19/2018 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Douglas Durkee Hearst Television Manager of Spectrum Repack 02/19/2018 |