FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
63768
Service:
DTV
Call Sign:
KBLR
Channel:
20 (UHF)
File Number:
0000028159
FRN:
0012852398
Date Submitted:
01/03/2018

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

TELEMUNDO LAS VEGAS LICENSE LLC

MARGARET TOBEY

C/O NBCUNIVERSAL

300 NEW JERSEY AVENUE, NW

WASHINGTON, DC 20001

United States

+1 (202) 524-6401 MARGARET.TOBEY@NBCUNI.COM Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Install antenna for new channel on new tower while using existing main antenna on pre-auction channel with auxiliary transmitter. Replace mask filter and retune existing main transmitter for new channel. Modify aux for use on new channel after cut-over.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Retune Existing
Use Primary (Main)
Ownership Owned
Owner N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer Rohde & Schwarz
Model THU-9/24
Year 2013
Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 24 kW

Primary Transmitter

Back to Top

Retuning Transmitter Costs

Section Question Response
New IOT Tubes Number of Tubes (including accessories) needed N/A
New Mask Filter
Power 30 kW
Other Power N/A
New Exciter Is a new exciter needed? No

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Transformer - 45 KVA K13 480/400Y-230
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Auxiliary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Backup
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model TDU2-5K00LV
Year 2006
Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power Capacity 5 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model THU9-5 (Non-EVO)
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 5.8 kW
Justification for New Transmitter Support for existing transmitter ends on 12/31/2019 and we are concerned about reliability with the extended use required as part of the repack and the lack of any backup once the existing main transmitter is moved to the new channel.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Auxilary Transmitter Installation Costs

Installation cost including RF system modification and electrical work

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Auxiliary (Backup)
Description of Use Backup and operation during maintenance of main
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 230.0 kW
Manufacturer
Model TLP-16E-SP
Year 2006

Auxiliary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Auxiliary (Backup)
Description of Use During tower maintenance
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 205.0 kW
Manufacturer
Model TLP-16E-SP
Year 2018
Justification for New Antenna Existing auxiliary antenna is single channel only and current location is blocked by new tower.

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? No

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model ATW16H3-HSC5U-39S
Year 1999

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 655.0 kW
Manufacturer
Model TFU-17ETT/VP-R S340
Year 2018
Justification for New Antenna Existing antenna will not operate on thenew channel. New tower was designed for top mount antenna. Adding structure to top for side mount would increase cost. Upgraded to elliptical polarization.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 4 1/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Auxiliary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Connection to new aux antenna
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Air
Diameter 3 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 285 feet per run

Auxiliary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Auxiliary (Backup)
Description of Use Allows station to stay on air in event of failure and to protect workers on tower top
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Flexible Air
Diameter 3 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 240 feet per run
Justification for New Transmission Line Existing line goes to a different tower that is no longer usable and was installed in conduit. Removing it will destroy it making it unusable for use with this antenna.

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Air
Diameter 5 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 245 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 4 1/16 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 410 feet per run
Justification for New Transmission Line Existing line needs to be kept on old tower during the transition to allow operation on the current channel while equipment for the new channel is installed and tested.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Auxiliary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Move Equipment
Tower Use Auxiliary (Backup)
Description of Use Backup and for use during maintenance on main tower
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1058295
Coordinates (NAD83) Latitude (NAD83) 36° 00' 34.2" N-
Longitude (NAD83) 115° 00' 22.1" W-
Overall Structure Height 102.03 feet
Support Structure Height 80.05 feet
Ground Elevation Above Mean Sea Level (AMSL) 3268.66 feet
Structure Type LTOWER - Lattice Tower
Tower Owner American Towers, LLC
Date Constructed 03/01/1999


Auxiliary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Auxiliary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Remove ch 40 aux antenna

Remove and dispose of channel 40 antenna and transmission line.

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Construct New
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1009985
Coordinates (NAD83) Latitude (NAD83) 36° 00' 36.4" N-
Longitude (NAD83) 115° 00' 22.7" W-
Overall Structure Height 251.97 feet
Support Structure Height 247.04 feet
Ground Elevation Above Mean Sea Level (AMSL) 3227.98 feet
Structure Type LTOWER - Lattice Tower
Tower Owner American Tower, LLC
Date Constructed 08/24/2001

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
66807 KHDF-CD DTV
10498 KEEN-CD DTV
57281 KCYE FM
40757 KKLZ FM
14302 K43FO-D DTV

Other Types of Users

Users
KLVD-LD 69786
KVEG-FM1 92496

Primary Tower

Back to Top

Tower Construction Costs

Section Question Response
Construct New Tower Use Primary (Main)
Description of Use N/A
Is this a request for upgraded equipment? No
Height 200.00 feet
Justification for New Tower See attachment "KBLR Tower Justification Letter 060817.pdf" from American Tower Company

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Terrain constrained
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Remove channel 40 antenna

Cost to remove and dispose of old channel 40 main antenna and line and relocate FM stations during tower work

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 1040
Explanation 6 months of PM at $150/hr for 40 hours per week total cost $156,000
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development No
Prepare engineering section of Form FCC Construction Permit Application No
For Auxiliary Facility N/A
For Main Facility N/A
Prepare engineering section of Form FCC License to Cover Application No
For Auxiliary Facility N/A
For Main Facility N/A
Prepare request for Special Temporary Authority No
Quantity N/A
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
NEPA Section 106 environmental review No
Environmental Assessment Yes
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? No
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $546,628.77 $482,889.31 N/A $240,887.29 N/A
Total for all systems $2,440,257.84 $1,714,517.67 N/A $437,935.88 N/A
Primary Transmitter THU-9/24 $142,130.00 $157,822.24 $46,818.99
Other Electrical Service: Transformer - 45 KVA K13 480/400Y-230 $4,330.00 $4,330.00 See attached quote $4,330.00 N/A
UHF and VHF - minor banding issues $105,200.00 $111,003.25 Modifications to RF system, retune 24 amplifiers. See attachment "KBLR Marsand Quote REVISED" 2nd line item. 8% NV tax added $0.00 N/A
30 kW mask filter $32,600.00 $42,488.99 See attachment "Marsand Filter Quote". 8% NV tax added to quoted price $42,488.99 N/A
Auxiliary Transmitter THU9-5 (Non-EVO) $404,498.77 $325,067.07 $194,068.30
Auxilary Transmitter Installation Costs $130,998.77 $130,998.77 See attached quote "KBLR Marsand Quote REVISED" - 1st iiem "Install 1 cabinet R&S, coax, SW, electrical & load" plus 8% tax of $9,703.61 . $0.00 N/A
UHF - Liquid Cooled Solid State Transmitter 4.9 . 6.5 kW $273,500.00 $194,068.30 See quote "KBLR Transmitter Quote Updated 9-11". 8% NV sales tax added to quoted price $194,068.30 N/A

Components

Actual Information Description File Name
Other Electrical Service: Transformer - 45 KVA K13 480/400Y-230

Component Description:
Transformer
Amount:
$4,330.00
UHF and VHF - minor banding issues

Component Description:
See line 2 on invoice, plus a portion of tax.
Amount:
$42,739.33

Component Description:
See 2nd item of invoice, plus a portion of tax
Amount:
$53,446.02
30 kW mask filter

Component Description:
8 Pole Mask Filter
Amount:
$42,488.99
Auxilary Transmitter Installation Costs

Component Description:
See line 1 of invoice plus a portion of the tax.
Amount:
$63,073.48

Component Description:
See line 1 on invoice, plus a portion of tax.
Amount:
$50,438.14
UHF - Liquid Cooled Solid State Transmitter 4.9 . 6.5 kW

Component Description:
Transmitter Cost plus tax
Amount:
$194,068.30

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $523,710.00 $236,509.68 N/A $19,747.80 N/A
Total for all systems $2,440,257.84 $1,714,517.67 N/A $437,935.88 N/A
Primary Antenna TFU-17ETT/VP-R S340 $305,800.00 $199,717.84 $0.00
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) $9,570.00 $8,699.40 See quote "DMS081 NBC KBLR REPACK.pdf". 8% NV tax of $644.40 added. $0.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 See Dielectric quote. $0.00 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $184,618.44 See quote "DMS081 NBC KBLR REPACK.pdf ",. $16,425.00 cost for vertical polarization removed. 8% NV tax of $13,675.44 added to remaining total. $0.00 N/A
Auxiliary Antenna TLP-16E-SP $217,910.00 $36,791.84 $19,747.80
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $3,800.00 N/A N/A N/A
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized $189,500.00 $23,697.36 See line 1 of quote plus 8% NV tax. $19,747.80 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $9,294.48 Required for side mount on tapered tower. Included in attached quote "700353CMZ KBLR AUX NBC.pdf" from Dielectric. Added 8% NV tax to quote. $0.00 N/A

Components

Actual Information Description File Name
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed)

Component Description:
Line 3 of invoice.
Amount:
$3,624.75

Component Description:
45% of line 3 on invoice
Amount:
$3,624.75
Sweep test of existing antenna

Component Description:
Line 22 of invoice
Amount:
$2,880.00
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
Line 1 of invoice.
Amount:
$76,924.35

Component Description:
45% of line 1 on invoice
Amount:
$76,924.35
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized

Component Description:
Line 1 of invoice.
Amount:
$9,873.90

Component Description:
Line 1 of invoice
Amount:
$9,873.90
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
See line 2 on invoice.
Amount:
$3,872.70

Component Description:
See line 2 of invoice.
Amount:
$3,872.70

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $72,380.00 $65,046.77 N/A $0.00 N/A
Total for all systems $2,440,257.84 $1,714,517.67 N/A $437,935.88 N/A
Primary Transmission Line $58,220.00 $50,530.28 $0.00
Rigid Transmission Line - copper, 4 1/16" $58,220.00 $50,530.28 See quote "DMS081 NBC KBLR REPACK.pdf" Item 3. 8% NV sales tax added. $0.00 N/A
Auxiliary Transmission Line $14,160.00 $14,516.49 $0.00
Flexible Air Transmission Line - dielectric, 3" $14,160.00 $14,516.49 Price includes dehydrator, line support, and connectors. See "700353CMZ KBLR AUX NBC.pdf". 8% NV sales tax added to quote. $0.00 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 4 1/16"

Component Description:
See line 4 of invoice.
Amount:
$21,054.29

Component Description:
45% of line 4 on invoice
Amount:
$21,054.29
Flexible Air Transmission Line - dielectric, 3"

Component Description:
See line 3 on invoice.
Amount:
$6,048.54

Component Description:
See line 3 of invoice.
Amount:
$6,048.54

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $890,447.87 $568,770.54 N/A $161,374.67 N/A
Total for all systems $2,440,257.84 $1,714,517.67 N/A $437,935.88 N/A
Primary Tower LTOWER $0.00 $0.00 $0.00
Auxiliary Tower LTOWER $122,000.00 $81,030.67 $0.00
Short Tower (less than 500') $84,200.00 $43,230.67 See quote "KBLR Marsand Quote REVISED" - attached. Auxiliary antenna installation along with antenna line sweep. Price includes 8% NV tax. $0.00 N/A
Remove ch 40 aux antenna $37,800.00 $37,800.00 See quote "Quote1743B-2 - kblr - post repack.pdf" - 4th item Price includes 8% NV tax. N/A N/A
Primary Tower $768,447.87 $487,739.87 $161,374.67
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $140,292.00 See quote "KBLR Marsand Quote REVISED" - 6th item - main antenna installation. 8% NV sales tax added to quote. $0.00 N/A
New tower $161,374.67 $161,374.67 See attachment "KBLR Justification Letter 0601817.pdf" from ATC for KBLR portion of new tower cost. Also see attached quote. $161,374.67 N/A
Remove channel 40 antenna $186,073.20 $186,073.20 See attachment "Quote1743B-2 - kblr - post repack.pdf". Work must be done at night as lease does not require other tower users to shutdown or reduce power during the day to protect workers. Price includes 8% NV sales tax N/A N/A

Components

Actual Information Description File Name
Short Tower (less than 500')

Component Description:
See "antenna line sweep" and "Wallen crew" on invoice, plus a portion of tax added.
Amount:
$21,957.00

Component Description:
See "Wallen crew" and "Antenna line sweep" lines on invoice, plus a portion of the tax.
Amount:
$17,558.42
Remove ch 40 aux antenna Information not provided.
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
See "ERI crew" line on invoice, plus a portion of the tax.
Amount:
$54,016.30

Component Description:
See 6th item of invoice for antenna installation cost. Portion of tax cost added.
Amount:
$67,548.00
New tower

Component Description:
New tower capital contribution
Amount:
$161,374.67
Remove channel 40 antenna Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $305,605.00 $260,415.17 N/A $15,801.12 N/A
Total for all systems $2,440,257.84 $1,714,517.67 N/A $437,935.88 N/A
Outside Professional Services $305,605.00 $260,415.17 $15,801.12
Prepare and or review reimbursement form $2,630.00 $2,665.17 Additional costs associated with revisions to Form 399. $2,665.17 N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $4,000.00 N/A $0.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $567.00 N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A N/A N/A
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet $10,520.00 $10,000.00 N/A N/A N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A N/A N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A N/A N/A
Project management of the transition $164,320.00 $156,000.00 N/A $12,568.95 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $50,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Prepare and or review reimbursement form

Component Description:
Review and Revision of Form 399.
Amount:
$121.86

Component Description:
Review and revision of form 399.
Amount:
$1,741.05

Component Description:
Lines 3-6 of invoice, less 10% discount.
Amount:
$802.26
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
Lines 1 and 2, less a portion of the discount.
Amount:
$226.80

Component Description:
Preparation of LMS minor change application for post-repack facility.
Amount:
$340.20
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet Information not provided.
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application Information not provided.
RF Exposure Measurements Information not provided.
Project management of the transition

Component Description:
Project Management Services
Amount:
$2,145.00

Component Description:
This is a cost for project management work that has already been performed. Hours and expenses outlined on invoice from months in 2017.
Amount:
$18,474.77

Component Description:
See breakdown of completed project management work on invoice for months in 2017. A portion of invoice's tax added.
Amount:
$14,773.77

Component Description:
November project management services
Amount:
$3,510.00

Component Description:
Project management services
Amount:
$4,420.00

Component Description:
Project management services
Amount:
$2,145.00

Component Description:
Project management services
Amount:
$348.95
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $101,486.20 $100,886.20 N/A $125.00 N/A
Total for all systems $2,440,257.84 $1,714,517.67 N/A $437,935.88 N/A
Other Expenses $101,486.20 $100,886.20 $125.00
Develop and air announcement of upcoming channel change $25,000.00 $25,000.00 Production of announcements and air-time for announcements N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
Local Zoning $15,000.00 $15,000.00 To be provided by ATC $125.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $38,491.20 $38,491.20 See "KBLR Marsand Quote REVISED" item "Disposal Thales, CIF, Aux filter & RF" plus 8% tax of $2,851.20. Channel 40 antenna disposal costs are included in tower rigging estimates. $0.00 N/A
MVPD Notification of Channel Change $10,000.00 $10,000.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A

Components

Actual Information Description File Name
Develop and air announcement of upcoming channel change Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
Local Zoning

Component Description:
Permitting Research
Amount:
$125.00
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
See 3rd item of invoice, plus a portion of tax.
Amount:
$18,532.80

Component Description:
See 3rd item of invoice, plus a portion of the tax.
Amount:
$14,820.18
MVPD Notification of Channel Change Information not provided.
DTV Medical Facility Notification Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,440,257.84 $1,714,517.67 $437,935.88

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Margaret L Tobey

Assistant Secretary


01/03/2018

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Margaret L Tobey

Assistant Secretary


01/03/2018