Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
HEARST STATIONS INC. Doing Business As: HEARST STATIONS INC. |
C/O BROOKS, PIERCE ET AL. P.O. BOX 1800 RALEIGH, NC 27602 United States |
+1 (919) 839-0300 | mprak@brookspierce.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | see attached transition plan document |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | ||
Ownership | Owned | |
Owner | ||
Site | ||
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma CD3200P2 | |
Year | 2005 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Description | ||
Power capacity | 50 kw | |
Solid State Cooling | ||
Solid State Power Capacity | ||
Other Transmitter Type |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Description of Use | ||
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-40 | |
Transmitter Type | Solid state | |
IOT Power Type | ||
Other | ||
Power capacity | ||
Solid State Cooling | Liquid | |
Solid State Power Capacity | 25.3 kw | |
Other Transmitter Type | ||
Justification for New Transmitter | Existing IOT transmitter cannot be converted to post-transition channel, see GatesAir EOL and HTV IOT to Solid-State Justification statements. An IOT replacement is more expensive than proposed SS transmitter. See attached Comark IOT Transmitter quote. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | No | |
Size | ||
Length | ||
Other Electrical Service | Yes | |
Description | See attached quote for transmitter installation electrical service | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | ||
Size | ||
Other Size | ||
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | ||
Channel 14 Costs | Is an RF Consulting Engineer needed? | |
Is a channel 14 Mask Filer needed? | ||
Is additional field engineering time needed? | ||
Number of Days |
Name | Description |
---|---|
Electrical Accessories |
Surge protection required by manufacturer |
Shipping |
transmitter shipping |
Sales Tax |
sales tax |
Transmitter de-install |
old transmitter removal |
RF Accessories |
Additional RF components required for transmitter operation and integration into current RF environment |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Owner | American Tower Corp. | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top-mount stacked | |
Antenna position in stack | Bottom | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 3 | |
Number of Panels | 80 | |
Design power capacity in use | 45.0 % | |
Lower Limit | 502.00 MHz | |
Upper Limit | 678.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 600.00 kW | |
Manufacturer | Dielectric | |
Model | DeltastarTUG-05-16/80H-2-B | |
Year | 2003 |
Facility ID | Call Sign |
---|---|
51499 | KMAX-TV |
33875 | KCRA-TV |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? | Yes |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | Additional Module | |
Number of channels supported | 3 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A |
RF Channel Number |
---|
23 |
24 |
35 |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Auxiliary (Backup) | |
Description of Use | backup to main antenna | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side-mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 790.00 kW | |
Manufacturer | ||
Model | TFU-24DSB-C170 | |
Year | 2010 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Auxiliary (Backup) |
Description of Use | Aux and interim use | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side-mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 425.00 kW | |
Manufacturer | ||
Model | TFU-28DSC-RO4 | |
Year | 2019 | |
Justification for New Antenna | Current antenna is channel specific and cannot be used on post-transition channel. Antenna must be replaced. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 7 3/16 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Shipping |
Antenna shipping |
Sales Tax |
Antenna sales tax |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Owner | American Tower Corp. | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Dielectric |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Segment Length | Broadband | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 2200 feet per run |
Facility ID | Call Sign |
---|---|
51499 | KMAX-TV |
33875 | KCRA-TV |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Backup | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Segment Length | 19 ½ ' | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1800 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Auxiliary (Backup) |
Description of Use | backup | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Segment Length | 20' | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1800 feet per run | |
Justification for New Transmission Line | Current transmission line segment length is not compatible with post-transition channel and must be replaced. |
Name | Description |
---|---|
Sales Tax |
estimated sales tax based on California and local sales tax rate of 8.25% |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1015686 | |
Coordinates (NAD83) | Latitude (NAD83) | 38° 15' 54.0" N- |
Longitude (NAD83) | 121° 29' 28.0" W- | |
Overall Structure Height | 2000.30 feet | |
Support Structure Height | 1904.83 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 0.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Hearst Stations Inc. | |
Date Constructed | 10/01/1985 |
Facility ID | Call Sign | Service |
---|---|---|
51499 | KMAX-TV | DTV |
33875 | KCRA-TV | DTV |
52953 | KSPX-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Consulting |
Tower consulting and tower project management |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 380 | |
Explanation | Need RF and design experience not available in-house. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Transmitter Site Survey |
Transmitter planning survey & transmitter building drawings |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,212,152.00 | $1,116,107.00 | N/A | $311,118.13 | N/A |
Total for all systems | $2,918,105.00 | $2,367,653.00 | N/A | $573,418.98 | N/A |
Primary Transmitter ULXTE-40 | $1,212,152.00 | $1,116,107.00 | $311,118.13 | ||
RF Accessories | $76,222.00 | $76,222.00 | Additional RF components required for replacement transmitter operation. See GatesAir transmitter quote, page 7. | N/A | N/A |
Transmitter de-install | $25,489.00 | $25,489.00 | Old transmitter must be removed in order to completely install replacement. See GatesAir quote | N/A | N/A |
Sales Tax | $81,133.00 | $81,133.00 | sales tax per GatesAir transmitter quote | N/A | N/A |
Shipping | $11,000.00 | $11,000.00 | Transmitter shipping | N/A | N/A |
Electrical Accessories | $1,943.00 | $1,943.00 | Required by transmitter manufacturer. See GatesAir quote. | N/A | N/A |
Other Electrical Service: See attached quote for transmitter installation electrical service | $69,465.00 | $69,465.00 | transmitter installation electrical service per attached quote | N/A | N/A |
Transformer 3 phase/480v - 150 KVA | $24,900.00 | $5,870.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $922,000.00 | $844,985.00 | N/A | $311,118.13 | N/A |
Actual Information Description | File Name |
---|---|
RF Accessories | Information not provided. |
Transmitter de-install | Information not provided. |
Sales Tax | Information not provided. |
Shipping | Information not provided. |
Electrical Accessories | Information not provided. |
Other Electrical Service: See attached quote for transmitter installation electrical service | Information not provided. |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $354,427.00 | $331,635.00 | N/A | $228,894.50 | N/A |
Total for all systems | $2,918,105.00 | $2,367,653.00 | N/A | $573,418.98 | N/A |
Primary Antenna DeltastarTUG-05-16/80H-2-B | $86,550.00 | $86,400.00 | $0.00 | ||
Adding a module to existing combiner (without antenna) | $80,000.00 | $80,000.00 | N/A | N/A | N/A |
UHF - High Power Top Mount Three Station broadband panel antenna horizontally polarized | $0.00 | $0.00 | Current antenna reused for post-transition channel. No changes required. | N/A | N/A |
Sweep test of existing antenna | $6,550.00 | $6,400.00 | N/A | N/A | N/A |
Auxiliary Antenna TFU-28DSC-RO4 | $267,877.00 | $245,235.00 | $228,894.50 | ||
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized | $184,500.00 | $164,560.00 | Per Dielectric quote | $164,560.00 | N/A |
Sales Tax | $16,340.00 | $16,340.00 | estimated sales tax based on California and local sales tax rate 8.25% | N/A | N/A |
Shipping | $24,437.00 | $24,437.00 | Shipping per attached Dielectric quote. | $24,437.00 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $22,550.00 | $23,200.00 | Side mount brackets per attached Dielectric quote | $23,200.00 | N/A |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | $13,500.00 | $10,298.00 | N/A | $10,297.50 | N/A |
Sweep test of existing antenna | $6,550.00 | $6,400.00 | N/A | $6,400.00 | N/A |
Actual Information Description | File Name |
---|---|
Adding a module to existing combiner (without antenna) | Information not provided. |
UHF - High Power Top Mount Three Station broadband panel antenna horizontally polarized | Information not provided. |
Sweep test of existing antenna | Information not provided. |
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized | |
Sales Tax | Information not provided. |
Shipping | |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | |
Sweep test of existing antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $534,828.00 | $333,647.00 | N/A | $12,806.35 | N/A |
Total for all systems | $2,918,105.00 | $2,367,653.00 | N/A | $573,418.98 | N/A |
Primary Transmission Line | $0.00 | $0.00 | $0.00 | ||
Auxiliary Transmission Line | $534,828.00 | $333,647.00 | $12,806.35 | ||
Sales Tax | $25,428.00 | $25,428.00 | sales tax based on California and local sales tax rate of 8.25% | N/A | N/A |
Rigid Transmission Line - copper, 7 3/16" | $509,400.00 | $308,219.00 | N/A | $12,806.35 | N/A |
Actual Information Description | File Name |
---|---|
Sales Tax | Information not provided. |
Rigid Transmission Line - copper, 7 3/16" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $631,800.00 | $417,000.00 | N/A | $0.00 | N/A |
Total for all systems | $2,918,105.00 | $2,367,653.00 | N/A | $573,418.98 | N/A |
Primary Tower TOWER | $631,800.00 | $417,000.00 | $0.00 | ||
Tall Tower (greater than 500') | $205,000.00 | $200,000.00 | N/A | N/A | N/A |
Structural engineering tower load study for well documented tower | $12,300.00 | $12,000.00 | N/A | N/A | N/A |
Major tower reinforcement/modifications | $409,500.00 | $200,000.00 | N/A | N/A | N/A |
Tower Consulting | $5,000.00 | $5,000.00 | tower consulting - quote attached | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $136,745.00 | $121,369.00 | N/A | $20,600.00 | N/A |
Total for all systems | $2,918,105.00 | $2,367,653.00 | N/A | $573,418.98 | N/A |
Outside Professional Services | $136,745.00 | $121,369.00 | $20,600.00 | ||
Transmitter Site Survey | $20,600.00 | $20,600.00 | Transmitter Site Survey. Quote with description attached. | $20,600.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,585.00 | $3,500.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,305.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,100.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,120.00 | $5,000.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,535.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,535.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,535.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,050.00 | $2,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,070.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,170.00 | $7,000.00 | N/A | N/A | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,560.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,560.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $58,520.00 | $44,519.00 | Per attached TI Digital quote | N/A | N/A |
RF Exposure Measurements | $20,500.00 | $20,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Site Survey | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Project management of the transition | Information not provided. |
RF Exposure Measurements | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $48,153.00 | $47,895.00 | N/A | $0.00 | N/A |
Total for all systems | $2,918,105.00 | $2,367,653.00 | N/A | $573,418.98 | N/A |
Other Expenses | $48,153.00 | $47,895.00 | $0.00 | ||
Equipment Storage | $30,500.00 | $30,500.00 | Estimate for 1 year of antenna & line storage | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $333.00 | $325.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,070.00 | $1,070.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $2,500.00 | $2,500.00 | Attorney review to ensure FCC compliance | N/A | N/A |
MVPD Notification of Channel Change | $2,500.00 | $2,500.00 | Attorney assistance in coordinating MVPD notification | N/A | N/A |
DTV Medical Facility Notification | $11,250.00 | $11,000.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,918,105.00 | $2,367,653.00 | $573,418.98 |
Question | Response |
---|---|
Is construction complete? | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Susan Triana Sr. Accounting Manager, Projects 11/20/2017 |