Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
71366
Service:
FM
Call Sign:
WEAS-FM
File Number:
0000086385
FRN:
0002834810
Eligibility Status:
Eligible
Date Submitted:
10/28/2020

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

CUMULUS LICENSING LLC

Doing Business As: CUMULUS LICENSING LLC

3280 Peachtree Road, NW

Suite 2200

Atlanta, GA 30305

United States

+1 (404) 949-0700 FCCLicenseManagement@cumulus.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Cynthia M Jacobson, PE

Consulting Engineer

Carl T. Jones Corp.

7901 Yarnwood Ct.

Springfield, VA 22153

United States

+1 (703) 569-7704 cjacob@ctjc.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan FM AUXILIARY FACILITY for WEAS-FM (FM impacted by TV repack). This is to construct a new auxiliary facility at an existing tower site to keep WEAS-FM on the air during TV repack work at the MAIN tower site. New transmitter, antenna, line, appurtenances

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? No
Existing Transmitter Manufacturer and Type Manufacturer
Model No model
Year 2000
Type Solid State
Solid State Cooling Air Cooled
Model Type Analog
Solid State Power Capacity 10 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model HARFAX5KFAX150
Transmitter Type Solid State
Solid State Cooling Air Cooled
Model Type Analog
Solid State Power capacity 5 kW
Justification for New Transmitter New auxiliary transmitter required to keep WEAS-FM on the air during TV repack work at the main site. Facility will require STL, remote control, power panel, etc
Does the transmitter require the purchase of a new HD Importer? No
Does the transmitter require the purchase of a new HD Exporter? No

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Other Transmitter Costs Does the transmitter installation require an Additional Exciter? No
Does the transmitter installation require any additional transmitter installation costs? Yes
Does the transmitter installation require a Transmitter Building Site Survey/Installation? No
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Rigid Conduit and Wiring No
Other Electrical Service Yes
Description Install 50 am 240 VAC service and 20 am 120 VAC service
HVAC Service Does the replacement transmitter require HVAC Service? No
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Other Transmitter-Related Expenses Does the replacement transmitter require a Remote Control? Yes
Does the replacement transmitter require an RDS Encoder? No
Does the replacement transmitter require Audio Processing? No

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Ownership Owned
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? No
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Circular
Type Cross Dipole
ERP: 10.0 kW
Manufacturer
Model No Model
Year 2000

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Change Type Purchase New
Ownership Owned
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Circular
Type Cross Dipole
ERP: 7.2 kW
Manufacturer
Model SHI-68424
Year 2019
Justification for New Antenna New antenna for WEAS-FM Aux site required to maintain service during TV Repack work at Main site. Antenna can only be used by only 1 station at a time, no combiner.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 1 5/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes
FM Band Pass Filters Do you require an FM band pass filter? Yes
Notch Filter Do you require a Notch filter? No
De-Icers Do you require De-Icers? No
Radomes Do you require Radomes? No

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? No
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Foam
Diameter 1 5/8 inches
Number of parallel runs 1
Length 200 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Flexible Foam
Diameter 1 5/8 inches
Number of parallel runs 1
Length 300 feet per run
Justification for New Transmission Line Coax from transmitter to antenna, required for new faciity
Interior RF Systems Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? Yes
Does the Installation of the Transmission Line require additional or replacement Inside RF system elbows, fitting, hangers, etc.? Yes

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1052722
Coordinates (NAD83) Latitude (NAD83) 32° 03' 34.0" N-
Longitude (NAD83) 081° 00' 56.0" W-
Overall Structure Height 372.04 feet
Support Structure Height 369.42 feet
Ground Elevation Above Mean Sea Level (AMSL) 11.15 feet
Structure Type NNTANN - Antenna Tower Array - 1st N = #
Tower Owner CUMULUS LICENSING CORP.
Date Constructed 06/01/1945


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: No study needed
Tower Reinforcements Please select whether tower reinforcements are needed: No reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Work

Installation of new coax and new antenna on tower

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 175
Explanation Project Management of Transition
Outside RF consulting Engineering Services Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility No
Prepare request for Special Temporary Authority No
Prepare Form 601 Yes
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application No
Prepare and file Form FCC License to Cover Application No
Prepare request for Special Temporary Authority No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement No
Form 399 assistance or other program management costs No
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Internal Employee Time Costs

Internal Employee Time Costs

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Permit and Filing Costs FCC Construction Permit Major Change No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? No
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Point to Point Microwave (STL/ICR) Frequency Coordination for Unidirection System Yes
Frequency Coordination for Bi-Direction System No
New Point to Point Microwave System No
1 pair IP-only Codecs for fiber, internet or IP microwave systems Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $106,489.00 $97,575.22 N/A $1,339.00 N/A
Total for all systems $262,596.22 $252,516.15 N/A $28,947.46 N/A
Primary Transmitter HARFAX5KFAX150 $106,489.00 $97,575.22 $1,339.00
Other Transmitter-Related Expenses Remote Control $2,400.00 $2,400.00 N/A N/A N/A
Transmitter Installation $70,500.00 $70,500.00 N/A N/A N/A
Other Electrical Service: Install 50 am 240 VAC service and 20 am 120 VAC service $1,339.00 $1,339.00 N/A $1,339.00 N/A
Air Cooled Solid State FM Transmitter 3.5 - 6 kW Analog $32,250.00 $23,336.22 N/A $0.00 N/A

Components

Actual Information Description File Name
Other Transmitter-Related Expenses Remote Control Information not provided.
Transmitter Installation Information not provided.
Other Electrical Service: Install 50 am 240 VAC service and 20 am 120 VAC service

Component Description:
Electrical - installation. #9658
Amount:
$1,339.00
Air Cooled Solid State FM Transmitter 3.5 - 6 kW Analog

Component Description:
Transmitter cost, 60% down. #Cumulus-2017-DP
Amount:
$13,085.74

Component Description:
Transmitter cost, 40% balance. #US0307427
Amount:
$10,250.48

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $27,748.50 $30,360.81 N/A $0.00 N/A
Total for all systems $262,596.22 $252,516.15 N/A $28,947.46 N/A
Primary Antenna SHI-68424 $27,748.50 $30,360.81 $0.00
FM Band pass filter (depends on power input and number of sections) $15,757.50 $15,757.50 N/A N/A N/A
Side Mount antenna brackets $196.00 $196.00 N/A N/A N/A
Elbow complex, 1 5/8 $180.00 $180.00 N/A N/A N/A
Sweep test of existing antenna $5,730.00 $5,730.00 N/A N/A N/A
High Power 6 kW - 10 kW Circularly-polarized $5,885.00 $8,497.31 Please see attached invoice from BGS. $0.00 N/A

Components

Actual Information Description File Name
FM Band pass filter (depends on power input and number of sections) Information not provided.
Side Mount antenna brackets Information not provided.
Elbow complex, 1 5/8 Information not provided.
Sweep test of existing antenna Information not provided.
High Power 6 kW - 10 kW Circularly-polarized

Component Description:
Antenna cost. #0400900
Amount:
$8,497.31

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $11,488.97 $8,132.87 N/A $3,843.90 N/A
Total for all systems $262,596.22 $252,516.15 N/A $28,947.46 N/A
Primary Transmission Line $11,488.97 $8,132.87 $3,843.90
Interior RF Systems: Elbows, fitting, hangers, etc. $288.97 $288.97 N/A $0.00 N/A
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators $4,000.00 $4,000.00 N/A N/A N/A
Flexible Foam Transmission Line - dielectric, 1 5/8" $7,200.00 $3,843.90 N/A $3,843.90 N/A

Components

Actual Information Description File Name
Interior RF Systems: Elbows, fitting, hangers, etc.

Component Description:
TL parts. #0400900
Amount:
$288.97
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators Information not provided.
Flexible Foam Transmission Line - dielectric, 1 5/8"

Component Description:
TL cost. #0407022
Amount:
$391.11

Component Description:
TL cost. #0401359
Amount:
$3,452.79

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $81,650.00 $81,650.00 N/A $8,000.00 N/A
Total for all systems $262,596.22 $252,516.15 N/A $28,947.46 N/A
Primary Tower NNTANN $81,650.00 $81,650.00 $8,000.00
Tower Rigging Short Tower (less than 500') $73,650.00 $73,650.00 N/A N/A N/A
Tower Work $8,000.00 $8,000.00 N/A $8,000.00 N/A

Components

Actual Information Description File Name
Tower Rigging Short Tower (less than 500') Information not provided.
Tower Work

Component Description:
Installation of antenna and transmission line. #397
Amount:
$8,000.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $24,820.00 $24,397.50 N/A $12,797.45 N/A
Total for all systems $262,596.22 $252,516.15 N/A $28,947.46 N/A
Outside Professional Services $24,820.00 $24,397.50 $12,797.45
Project management of the transition $18,462.50 $18,462.50 N/A $11,085.24 N/A
Internal Employee Time Costs $3,500.00 $3,500.00 N/A $32.21 N/A
Prepare Form 601 $755.00 $755.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $2,102.50 $1,680.00 N/A $1,680.00 N/A

Components

Actual Information Description File Name
Project management of the transition

Component Description:
The line item on 10/7 included an incorrect bill rate. The difference between the incorrect bill rate listed on the invoice and the correct bill rate is $70.17 for the following stations: KCMO, WABD, WDLT, WEAS, WKQX, WLS, WUHT, and WLXX.
Amount:
($70.17)

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 16 stations. #215662
Amount:
$49.68

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 16 stations. #0001-00-0006
Amount:
$3,051.81

Component Description:
Consulting engineering services. #0001-077-0007
Amount:
$1,440.00

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 16 stations. #LMG20-279
Amount:
$47.25

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 16 stations. #LMG215
Amount:
$27.34

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 16 stations. #0001-00-0010
Amount:
$464.81

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 16 stations. #0001-00-0013
Amount:
$1,069.59

Component Description:
Project management cost. #LBM20-319
Amount:
$144.37

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 16 stations. #0001-00-0008
Amount:
$336.87

Component Description:
Project management cost. #LBM19-260
Amount:
$75.25

Component Description:
Project management cost. #LBM19-229
Amount:
$1,111.25

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 16 stations. #LMG20-214
Amount:
$36.31

Component Description:
Project management cost. #LBM19-253
Amount:
$673.75

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 16 stations. #LMG20-303
Amount:
$82.57

Component Description:
Project management cost. #LBM20-213
Amount:
$57.75

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 16 stations. #LMG20-115
Amount:
$79.51

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 15 stations. #214288
Amount:
$793.80

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 16 stations. #217781
Amount:
$16.25

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 16 stations. #0001-00-0009
Amount:
$359.75

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 16 stations. #0001-00-0014
Amount:
$97.75

Component Description:
Consulting engineering cost. #0001-077-0004
Amount:
$3,000.00
Internal Employee Time Costs

Component Description:
Internal time expense Dec.2017 - CT.
Amount:
$32.21
Prepare Form 601 Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Consulting engineering cost. #0001-077-0001
Amount:
$1,200.00

Component Description:
Consulting engineering cost. #0001-077-0002
Amount:
$480.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $10,399.75 $10,399.75 N/A $2,967.11 N/A
Total for all systems $262,596.22 $252,516.15 N/A $28,947.46 N/A
Other Expenses $10,399.75 $10,399.75 $2,967.11
Point to Point Microwave (STL/ICR): 1 pair IP-only Codecs for fiber, internet or IP microwave systems $5,850.00 $5,850.00 N/A N/A N/A
Equipment Delivery and Handling Charges $3,464.75 $3,464.75 N/A $2,967.11 N/A
FCC Filing Fees - Form 2100 minor change CP application $200.00 $200.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A N/A N/A
Point to Point Microwave (STL/ICR): Frequency Coordination for Unidirection System $550.00 $550.00 N/A N/A N/A

Components

Actual Information Description File Name
Point to Point Microwave (STL/ICR): 1 pair IP-only Codecs for fiber, internet or IP microwave systems Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Antenna and TL parts freight. #0400900
Amount:
$497.64

Component Description:
Transmitter freight. #US0307598
Amount:
$2,967.11
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
Point to Point Microwave (STL/ICR): Frequency Coordination for Unidirection System Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $262,596.22 $252,516.15 $28,947.46

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Richard S. Denning

Executive Vice President and General Counsel


10/28/2020

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Richard S. Denning

Executive Vice President and General Counsel


10/28/2020

Attachments

Back to Top