(REFERENCE COPY - Not for submission) Extension of a Construction Permit

File Number:
0000004569
Submit Date:
09/02/2015
Lead Call Sign:
WZPA-LD
Facility ID:
72536


FRN:
0026907345
Service:
Low Power Digital TV
Purpose:
Extension of CP
Status:
Dismissed
Status Date:
09/22/2015
Filing Status:
Inactive


General Information

Section Question Response
Attachments Are attachments (other than associated schedules) being filed with this application? No

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

MAKO COMMUNICATIONS, LLC

Applicant

Doing Business As: MAKO COMMUNICATIONS, LLC

518 PEOPLES ST.

CORPUS CHRISTI, TX 78401

United States

+1 (361) 883-1763

MINICK@SWBELL.NET

OTH

Contact Representatives (2)

Back to Top
Contact Name Address Phone Email Contact Type

LEE PELTZMAN

SHAINIS & PELTZMAN

1850 M STREET NW

SUITE 240

WASHINGTON, DC 20036

United States

+1 (202) 293-0569

LEE@S-PLAW.COM

Legal Representative

JIMMY WILKEN

ENGINEER

MAKO COMMUNICATIONS

3406 BRAWNER PARKWAY

CORPUS CHRISTI, TX 78411

United States

+1 (361) 249-0993

JIMWILKEN@SWBELL.NET

Technical Representative

Tolling Questions

Back to Top
Section Question Response
  1. The reason that construction could not be completed:
    • Construction is prevented due to an act of God, defined in terms of natural disasters (e.g., floods, tornados, hurricanes, or earthquakes);
    • The grant of the permit is the subject of administrative or judicial review (i.e., petitions for reconsideration and applications for review of the grant of a construction permit pending before the Commission and any judicial appeal of any Commission action thereon), or construction is delayed by any cause of action pending before any court of competent jurisdiction relating to any necessary local, state or federal requirement for the construction or operation of the station, including any zoning or environmental requirement;
    • A request for international coordination, with respect to a construction permit for stations in the Low Power FM service, on FM channels reserved for noncommercial educational use, and for noncommercial educational full power stations, has been sent to Canada or Mexico on behalf of the station and no response from the country affected has been received; or
    • Failure of a Commission-imposed condition precedent prior to commencement of operation.
  2. Date of event initiating tolling. (Requests are required to be filed within 30 days of initiating event.)
  3. The dates of any previous requests for tolling.



Certification

Back to Top
Section Question Response
General Certification Statements The Applicant waives any claim to the use of any particular frequency or of the electromagnetic spectrum as against the regulatory power of the United States because of the previous use of the same, whether by authorization or otherwise, and requests an Authorization in accordance with this application (See Section 304 of the Communications Act of 1934, as amended.).  
The Applicant certifies that neither the Applicant nor any other party to the application is subject to a denial of Federal benefits pursuant to §5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. § 862, because of a conviction for possession or distribution of a controlled substance. This certification does not apply to applications filed in services exempted under §1.2002(c) of the rules, 47 CFR . See §1.2002(b) of the rules, 47 CFR § 1.2002(b), for the definition of "party to the application" as used in this certification § 1.2002(c). The Applicant certifies that all statements made in this application and in the exhibits, attachments, or documents incorporated by reference are material, are part of this application, and are true, complete, correct, and made in good faith.  
Authorized Party to Sign

FAILURE TO SIGN THIS APPLICATION MAY RESULT IN DISMISSAL OF THE APPLICATION AND FORFEITURE OF ANY FEES PAID

Upon grant of this application, the Authorization Holder may be subject to certain construction or coverage requirements. Failure to meet the construction or coverage requirements will result in automatic cancellation of the Authorization. Consult appropriate FCC regulations to determine the construction or coverage requirements that apply to the type of Authorization requested in this application.

WILLFUL FALSE STATEMENTS MADE ON THIS FORM OR ANY ATTACHMENTS ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. Code, Title 18, §1001) AND/OR REVOCATION OF ANY STATION AUTHORIZATION (U.S. Code, Title 47, §312(a)(1)), AND/OR FORFEITURE (U.S. Code, Title 47, §503).

 
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. AMANDA MINTZ
MEMBER

09/02/2015

Attachments

Back to Top
File Name Uploaded By Attachment Type Description Upload Status
basicextensiondismissalletter.doc Internal All Purpose Done with Virus Scan and/or Conversion
JUSTIFICATION FOR EXTENSION OF CONSTRUCTION PERMIT.pdf Applicant All Purpose JUSTIFICATION Done with Virus Scan and/or Conversion