Go to the Federal Communications Commission homepage at www.fcc.gov

Licensing and Management System

Approved by OMB 3060-0027
September 2014
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission)Tolling

File Number:
0000067088
Submit Date:
01/18/2019
Call Sign:
WQTO
Facility ID:
2175
FRN:
0001731298
State:
Puerto Rico
City:
PONCE
Service:
DTS
Purpose:
Tolling
Status:
Superceded
Status Date:
01/29/2019
Filing Status:
InActive


General Information

Section Question Response
Attachments Are attachments (other than associated schedules) being filed with this application? No

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

SISTEMA UNIVERSITARIO ANA G. MENDEZ, INC.

Doing Business As: SISTEMA UNIVERSITARIO ANA G. MENDEZ, INC.

P.O. BOX 21345

SAN JUAN, PR 00928

United States

+1 (787) 766-2600 CA_ADIAZ@SUAGM.EDU Private Not-for-Profit Educational Institution

Authorization Holder Name

Contact Representatives (2)

Back to Top
Contact Name Address Phone Email Contact Type

Todd D. Gray

Gray Miller Persh LLP

1200 New Hampshire Ave., NW

Suite 410

Washington, DC 20036

United States

+1 (202) 776-2571 tgray@graymillerpersh.com Legal Representative

Benjamin Pidek

Consulting Engineer

Mid-State Consultants

6197 Miller Rd., Suite 1

Swartz Creek, MI 48473

United States

+1 (810) 226-0750 bpidek@mscon.com Technical Representative

Tolling Questions

Back to Top
Section Question Response
Applicant certifies that construction cannot be completed due to: Legal reasons beyond station's control (e.g., litigation, international coordination):
Severe financial hardship (e.g., bankruptcy, negative cash flow):
other reasons (e.g., natural disasters): Yes
Has the construction period for this station been previously extended? Yes
Applicant requests that the time within which to complete construction be extended until: 07/28/2019

Certification

Back to Top
Section Question Response
General Certification Statements The Applicant waives any claim to the use of any particular frequency or of the electromagnetic spectrum as against the regulatory power of the United States because of the previous use of the same, whether by authorization or otherwise, and requests an Authorization in accordance with this application (See Section 304 of the Communications Act of 1934, as amended.).
The Applicant certifies that neither the Applicant nor any other party to the application is subject to a denial of Federal benefits pursuant to §5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. §862, because of a conviction for possession or distribution of a controlled substance. This certification does not apply to applications filed in services exempted under §1.2002(c) of the rules, 47 CFR . See §1.2002(b) of the rules, 47 CFR §1.2002(b), for the definition of "party to the application" as used in this certification §1.2002(c). The Applicant certifies that all statements made in this application and in the exhibits, attachments, or documents incorporated by reference are material, are part of this application, and are true, complete, correct, and made in good faith.
Authorized Party to Sign

FAILURE TO SIGN THIS APPLICATION MAY RESULT IN DISMISSAL OF THE APPLICATION AND FORFEITURE OF ANY FEES PAID

Upon grant of this application, the Authorization Holder may be subject to certain construction or coverage requirements. Failure to meet the construction or coverage requirements will result in automatic cancellation of the Authorization. Consult appropriate FCC regulations to determine the construction or coverage requirements that apply to the type of Authorization requested in this application.

WILLFUL FALSE STATEMENTS MADE ON THIS FORM OR ANY ATTACHMENTS ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. Code, Title 18, §1001) AND/OR REVOCATION OF ANY STATION AUTHORIZATION (U.S. Code, Title 47, §312(a)(1)), AND/OR FORFEITURE (U.S. Code, Title 47, §503).

I certify that this application includes all required and relevant attachments. Yes
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Ricardo Rodriguez

Executive VP and COO


01/18/2019

Attachments

Back to Top
File Name Uploaded By Attachment Type Description
WQTO Request for Tolling of Repack Construction Permit.pdf Applicant All Purpose