INSTALLATION SHOULD BE CATEGORICALLY EXCLUDED FROM ENVIRONMENTAL CONSIDERATIONS IN AS MUCH AS THE SUPPORTING STRUCTURE AND ANTENNA ARE EXISTING AND THE POWER DENSITY AT TWO METERS ABOVE GROUND LEVEL IS FAR BELOW THE 5% THRESHOLD OF RESPONSIBILITY FOR MPE WITHIN EITHER CONTROLLED OR UNCONTROLLED AREAS AS OUTLINED IN OET BULLETIN 65 EDITION 97-01.