KOCY-LP RESUMED OPERATIONS AS OF TODAY, AUGUST 7, 2014. THE STATION IS OPERATING CURRENTLY AT 75% OF AUTHORIZED POWER DUE TO AN ISSUE WITH THE THE STATION TRANSMITTER. A REQUEST FOR SPECIAL TEMPORARY AUTHORITY WILL BE FILED FOR REDUCED POWER OPERATIONS.