ALTHOUGH THIS FACILITY WAS CONSTRUCTED ON A TIMELY BASIS, IT RECENTLY WAS DISCOVERED THAT THIS APPLICATION WAS NOT TIMELY FILED. HOWEVER, INSOFAR AS THE FACILITY WAS TIMELY CONSTRUCTED, ON AUGUST 17, 2008, THIS APPLICATION IS PROPERLY FILED. CLEAR CHANNEL COMMUNICATIONS, INC., 23 FCC RCD 4526 (2008) (QUOTING WITH APPROVAL THE STAFF LETTER, 'STAFF PREVIOUSLY HAD ACCEPTED LATE-FILED LICENSE APPLICATIONS IF THE FACILITIES AUTHORIZED IN THE CONSTRUCTION PERMIT WERE BUILT BEFORE THE PERMIT EXPIRED').