WTLV IS IN THE PROCESS OF REPLACING A MALFUNCTIONING NON-DIRECTIONAL DIGITAL ANTENNA WITH A NEW DIRECTIONAL ANTENNA. EQUIPMENT HAS BEEN DELIVERED AND CREWS ARE ON SITE TO INSTALL THE ANTENNA UPON GRANT OF THE PERMIT PROPOSED IN BPCDT-20081205AGG, AS AMENDED ON FEBRUARY 13, 2009. THE AMENDED APPLICATION PROPOSES POST-TRANSITION OPERATION AT 53.3 KW. THE INSTANT STA REQUEST SEEKS AUTHORITY TO OPERATE WITH THE NEW ANTENNA PRE-TRANSITION, WITH POWER REDUCED TO 25 KW, TO COMPLY WITH INTERFERENCE LIMITS. EXHIBIT 21 CONTAINS THE ENGINEERING STATEMENT, FIGURES 1 TO 3, TABLE I, AND A COPY OF THE TECHNICAL PORTIONS OF THE FCC FORM.