IT HAS BEEN DETERMINED USING OET BULLETIN 65 AND THE COMMISSION'S WORKSHEETS THAT THE PROPOSAL WILL NOT EXCEED RF LIMITS IN CONTROLLED OR UNCONTROLLED LOCATIONS IN THE VICINITY OF THE PROPOSED TOWER.