THE EXISTING CONSTRUCTION PERMIT WAS GRANTED ON THE BASIS THAT NO INTERFERENCE WAS PROJECTED WITH AN ERP MAXIMUM OF 50 KW. THIS APPLICATION PROPOSES TO REDUCE THE ERP TO A MAXIMUM OF 18.9 KW SO THIS APPLICATION WOULD ALSO NOT CAUSE ANY INTERFERENCE. THE ONLY CHANGE BETWEEN THE TWO APPLICATIONS IS THAT THE TRANSMITTER POWER IS BEING REDUCED.