ONLY THE POWER AND PATTERN ARE CHAGNED IN ORDER TO MAKE THIS A FILLIN FOR WSJO. THE CHANNEL, SITE AND HEIGHTS REMAIN. THIS IS THUS A MINOR CHANGE. THE TOWER IS AN ASR TOWER WHICH IS NOT BEING EXTENDED, SO NO FAA OR ASR PROCESSING IS NEEDED. THE RADIATION HAZARD IS DE MINIMUS (0.8%), SO NO MULTI-SOURCE STUDY IS NEEDED. A PROTECTED ZONES REPORT IS PROVIDED FOR CONVENIENCE OF STAFF.