THERE HAS BEEN A 60 DAY DELAY WITH THE TOWER RIGGING COMPANY TO INSTALL THE ANTENNA FOR THE CURRENT CP. OTHERWISE THE STATION IS READY TO GO ON THE AIR. A GRANT OF THIS STA ALLOWS THE STATION TO RETURN TO THE AIR AT THE SITE AUTHORIZED IN THE CURRENT STA BUT AT REDUCED POWER. THE ANTENNA USED FOR THE INSTANT FACILITY IS ONE ELEMENT OF THE ANTENNA AUTHORIZED IN THE CURRENT CP. THE CONTOUR OF THE INSTANT APPLICATION WILL NOT EXTEND THE CONTOUR OF THE FACILITY AUTHORIZED IN THE CURRENT CP IN ANY DIRECTION.