THE PROPOSED STRUCTURE COORDINATES, GROUND ELEVATION AND HEIGHT HAVE BEEN ANALYZED WITH FCC PROGRAM TOWAIR. THE PROGRAM DETERMINATION IS THAT THE STRUCTURE TOWER DOES NOT REQUIRE REGISTRATION.