AN ENVIRONMENTAL ASSESSMENT IS NOT REQUIRED, AS GRANT OF THIS REQUEST WOULD NOT BE CONSIDERED A MAJOR ENVIRONMENTAL ACTION. THE PROPOSED ANTENNA WILL BE MOUNTED ON AN EXISTING REGISTERED STRUCTURE AND WILL NOT INCREASE THE OVERALL HEIGHT OF THAT STRUCTURE. THE MAXIMUM CALCULATED POWER DENSITY AT 2 METERS ABOVE GROUND WAS FOUND TO BE LESS THAN 1% OF THE PUBLIC EXPOSURE LIMIT APPLICABLE TO THE FREQUENCY OF THE PROPOSED OPERATION. THE PROPOSED OPERATION IS THEREFORE CATEGORICALLY EXCLUDED UNDER SECTION 1.1307(B)(3) OF THE FCC RULES FROM HAVING TO CONSIDER THE CONTRIBUTIONS OF OTHER STATIONS AT THE SITE. NONE OF THE OTHER FACTORS SPECIFIED IN SECTION 1.1307 OF THE RULES ARE BELIEVED TO APPLY.