THE PROPOSED CONSTRUCTION DOES NOT REQUIRE PREPARATION OF AN ENVIRONMENTAL ASSESSMENT AS IT DOES NOT INVOLVE ANY OF THE FACTORS LISTED IN SECTION 1.1306. THE ADDITIONAL RFR CONTRIBUTED BY ESB FACILITIES (SITE 1) IN PUBLIC AREAS HAS ALREADY BEEN APPROVED BY THE COMMISSION AS EACH STATION HAS AN AUTHORIZED FACILITY LOCATED AT THIS SITE WHICH WILL BE USED AS PART OF THE DTS AND NO FURTHER STUDY IS REQUIRED. SITE 2 OF THIS PROPOSAL IS A MULTI-USER SITE ALL FOUR STATIONS WILL SHARE THE PROPOSED ANTENNA AND HAVE THE SAME ERP OF 10 KW. THE ADDITIONAL GROUND LEVEL RFR CONTRIBUTED BY THIS PROPOSAL IN PUBLIC AREAS FOR EACH STATION IS LESS THAN 5% OF THE MPE FOR PUBLIC EXPOSURE; HOWEVER, THE BUILDING AT THIS SITE HAS AN UPPER (PENTHOUSE) ROOF, WHERE THE ANTENNA AND SUPPORT STRUCTURE ARE BEING MOUNTED, AND A LOWER ROOF. THERE ARE AREAS ON THE LOWER ROOFTOP THAT ARE, BASED ON CONSERVATIVE CALCULATIONS OF THE RFR CONTRIBUTIONS FROM ALL PROPOSED FACILITIES, WITHIN 94% OF THE PUBLIC EXPOSURE LIMIT. THE PENTHOUSE ROOF IS STRICTLY AN OCCUPATIONAL AREA AND ACCESS WILL BE LIMITED TO BUILDING PERSONAL THAT HAVE BEEN TRAINED IN POTENTIAL RFR HAZARDS. CALCULATIONS OF THE POTENTIAL RFR FROM ALL PROPOSED FACILITIES SHOW THAT NO AREA ON THE PENTHOUSE ROOF WILL EXCEED THE OCCUPATIONAL EXPOSURE LIMITS. WNBC PLANS TO TAKE RFR MEASUREMENTS AFTER INSTALLATION OF THE PROPOSED FACILITY TO VERIFY THAT EXPOSURE LIMITS ARE NOT EXCEEDED. WNBC AGREES TO COMPLY WITH THE COMMISSIONS REQUIREMENTS REGARDING POWER ADJUSTMENTS OR CESSATION OF OPERATION AS MAY BE NECESSARY TO ENSURE A COMPLIANT ENVIRONMENT FOR WORKER ACCESS. WORKERS WILL BE INSTRUCTED IN THE NATURE OF THE RF HAZARDS AND THEIR MITIGATION AND ENCOURAGED TO WEAR PERSONAL RFR MONITORS WHEN ON THE STRUCTURE. APPROPRIATE SIGNAGE WARNING OF RFR HAZARDS IS POSTED AT ESB AND WILL BE POSTED AT SITE 2 AFTER CONSTRUCTION HAS BEEN COMPLETED.