DUE TO TRANSMITTER PROBLEMS, KOCY-LP IS OPERATING AT 13.5 KW WHICH IS APPROXIMATELY 75% OF AUTHORIZED POWER WHICH IS 18.1 KW. THE LICENSEE IS CURRENTLY TROUBLE-SHOOTING THE TRANSMITTER AND SHOULD KNOW MORE ABOUT THE PROBLEM SOON. UNDER THE CIRCUMSTANCES, THE LICENSEE RESPECTFULLY REQUEST 180 DAYS IN WHICH TO OPERATE AT REDUCED POWER. THE LICENSEE HOPES THE TRANSMITTER SITUATION TO BE CORRECTED WITHIN THIS PERIOD.